The calculation of floor area shall be conducted telescopically, beginning from one level below the area of the proposed plot.
Illustrative Example:
For example, for a plot size of 100 square meters, permissible FAR is 2.0 and for plot size 100 -300 sqm, the permissible FAR is 1.75.
Calculation of FAR for a plot size of 280 square meters, shall be done as below:
a. Plot area of 280 square meters to be divided into two parts, i.e. 100 sqm + 180 sqm
b. For 100 sqm, as per applicable FAR, allowable floor area shall be 100*2.0 = 200 sqm
c. For remaining 180 sqm, as per applicable FAR, allowable floor area shall be 180*1.75 = 315 sqm
d. Hence, total allowable floor area shall be 515 sqm
The ground coverage and FAR for various use occupancies shall be as follows.
3.2.2.1 Residential – Plotted Development including EWS/ LIG/ Affordable Housing
| Sl. | Use Types | Ground Coverage (%) | Plot Area (sq.m.) | Base FAR | Max. FAR |
| 1 | Plotted Development - Single Unit/Multi-Unit (Built-up/Non-Built-up) | Max. coverage after ensuring setbacks | Up to 150 | 2.0 | 2.0 |
| >150 to 300 | 1.8 | 2.0 | |||
| >300 to 500 | 1.75 | 2.0 | |||
| >500 to 1200 | 1.5 | 2.0 | |||
| >1200 | 1.25 | 2.0 |
Note: Maximum Permissible FAR (MFAR) is calculated as per the provisions of purchasable FAR in Chapter-9.
3.2.2.2 Residential – Group Housing including EWS/ LIG/ Affordable Housing
| Sl. | Use Types | Ground Coverage (%) | Road Width (m) | Base FAR | Max. FAR |
| 2(a) | Group Housing (Built up) | Max. coverage after ensuring setbacks | 9 - 12m | 1.5 | 2.0 |
| >12 - 18m | 1.5 | 3.0 | |||
| >18 - 24m | 1.5 | 3.0 | |||
| >24 - 45m | 1.5 | 5.25 | |||
| > 45m | 1.5 | Unrestricted | |||
| 2(b) | Group Housing (Non-Built up) | Max. coverage after ensuring setbacks | >12 - 18m | 2.5 | 5.0 |
| >18 - 24m | 2.5 | 5.0 | |||
| >24 - 45m | 2.5 | 8.75 | |||
| > 45m | 2.5 | Unrestricted |
Note: Maximum Permissible FAR (MFAR) is calculated as per the provisions of purchasable FAR in Chapter-9
3.2.2.3 Commercial – Shops / Convenience Shopping / Other Commercial
| Sl. | Use Types | Ground Coverage (%) | Road Width (m) | Base FAR | Max. FAR |
|---|---|---|---|---|---|
| 3(a) | Shops / Convenience Shopping / Commercial Units (Built-up) | Max. coverage after ensuring setbacks | Up to 12m | 1.5 | 2.1 |
| >12 - 24m | 1.5 | 3 | |||
| >24 - 45m | 1.5 | 5 | |||
| >45m | 1.5 | Unrestricted | |||
| 3(b) | Shops / Convenience Shopping / Commercial Units (Non-Built up) | Max. coverage after ensuring setbacks | Up to 12m | 1.75 | 2.45 |
| >12 - 24m | 1.75 | 3.5 | |||
| >24 - 45m | 1.75 | 6 | |||
| >45m | 1.75 | Unrestricted | |||
| 4(a) | Commercial Complex (Built up) | Max. coverage after ensuring setbacks | =>12 - 24m | 1.5 | 3 |
| >24 - 45m | 1.5 | 5 | |||
| >45m | 1.5 | Unrestricted | |||
| 4(b) | Commercial Complex (Non-Built up) | Max. coverage after ensuring setbacks | =>12 - 24m | 1.75 | 3.5 |
| >24 - 45m | 1.75 | 6 | |||
| > 45m | 1.75 | Unrestricted | |||
| 5(a) | Shopping malls (Built up) | Max. coverage after ensuring setbacks | =>18 - 24m | 2 | 4 |
| >24 - 45m | 2 | 7 | |||
| > 45m | 2 | Unrestricted | |||
| 5(b) | Shopping malls (Non-Built up) | Max. coverage after ensuring setbacks | =>18 - 24m | 3 | 6 |
| >24 - 45m | 3 | 9 | |||
| > 45m | 3 | Unrestricted | |||
| 6(a) | Hotels (Built up) | Max. coverage after ensuring setbacks | =>12 - 24m | 2 | 4 |
| >24 - 45m | 2 | 7 | |||
| > 45m |
3.2.2.4 Community Facilities – Healthcare Buildings
| Sl. | Use Types | Ground Coverage (%) | Road Width (m) | Base FAR | Max. FAR |
| 1 | Non-Bedded Medical Establishments (Diagnostic Centre / OPD clinics / dispensary / Pathology Lab / Veterinary Clinics) | Max. coverage after ensuring setbacks | Up to 12m | 1.5 | 2.1 |
| >12 - 24m | 1.5 | 3.0 | |||
| >24 - 45m | 1.5 | 5.25 | |||
| > 45m | 1.5 | Unrestricted | |||
| 2(a) | Nursing Homes / Veterinary Hospitals / Maternity Hospitals / Small Hospitals (Up to 50 beds) (Built up) | Max. coverage after ensuring setbacks | =>12 - 24m | 1.5 | 3.0 |
| >24 - 45m | 1.5 | 5.25 | |||
| > 45m | 1.5 | Unrestricted | |||
| 2(b) | Nursing Homes / Veterinary Hospitals / Maternity Hospitals / Small Hospitals (Up to 50 beds) (Non-Built up) | Max. coverage after ensuring setbacks | =>12 - 24m | 2.0 | 4.0 |
| >24 - 45m | 2.0 | 7.0 | |||
| > 45m | 2.0 | Unrestricted | |||
| 3(a) | Hospital > 50 beds (Built up) | Max. coverage after ensuring setbacks | =>18 - 24m | 1.5 | 3.0 |
| >24 - 45m | 1.5 | 5.25 | |||
| > 45m | 1.5 | Unrestricted | |||
| 4(b) | Hospital > 50 beds (Non-Built up) | Max. coverage after ensuring setbacks | =>18 - 24m | 2.5 | 5.0 |
| >24 - 45m | 2.5 | 8.75 | |||
| > 45m | 2.5 | Unrestricted | |||
| 5(a) | Nursing college (Built up) | Max. coverage after ensuring setbacks | =>18 - 24m | 1.5 | 3.0 |
| >24 - 45m | 1.5 | 5.25 | |||
| > 45m | 1.5 | Unrestricted | |||
| 5(b) | Nursing college (Non-Built up) | Max. coverage after ensuring setbacks | =>18 - 24m | 2.0 | 4.0 |
| >24 - 45m | 2.0 | 7.0 | |||
| > 45m | 2.0 |
3.2.2.5 Community Facilities – Education Buildings
| Use Types | Ground Coverage (%) | Road Width (m) | Base FAR | Max. FAR | |
| 1(a) | Schools (Nursery/Primary) (Built up) | Max. coverage after ensuring setbacks | Up to 12m | 1.0 | 1.4 |
| >12 - 24 m | 1.0 | 2.0 | |||
| >24 - 45 m | 1.0 | 3.0 | |||
| > 45 m | 1.0 | 3.0 | |||
| 2(b) | Schools (Nursery/Primary) (Non-Built up) | Max. coverage after ensuring setbacks | Up to 12m | 1.2 | 1.4 |
| >12 - 24 m | 1.2 | 2.4 | |||
| >24 - 45 m | 1.2 | 3.6 | |||
| > 45 m | 1.2 | 3.6 | |||
| 3(a) | Secondary/Intercollege/Degree Colleges / Universities (Built up) | Max. coverage after ensuring setbacks | =>12 - 24 m | 1.0 | 2.0 |
| >24 - 45 m | 1.0 | 3.5 | |||
| > 45 m | 1.0 | Unrestricted | |||
| 3(b) | Secondary/Intercollege/Degree Colleges / Universities (Non-Built up) | Max. coverage after ensuring setbacks | =>12 - 24 m | 2.0 | 4.0 |
| >24 - 45 m | 2.0 | 7.0 | |||
| > 45 m | 2.0 | Unrestricted |
Note: Maximum Permissible FAR (MFAR) is calculated as per the provisions of purchasable FAR in Chapter-9
3.2.2.6 Community Facilities – Public Amenities
| Sl. | Use Types | Ground Coverage (%) | Road Width (m) | Base FAR | Max. FAR |
| 1(a) | Marriage Hall/ Banquet/ Multipurpose Hall/ Religious Building (Built up) | Max. coverage after ensuring setbacks | =>18 - 24m | 2.0 | 4.0 |
| Marriage Hall/ Banquet/ Multipurpose Hall/ Religious Building (Built up) | Max. coverage after ensuring setbacks | >24 - 45m | 2.0 | 7.0 | |
| Marriage Hall/ Banquet/ Multipurpose Hall/ Religious Building (Built up) | Max. coverage after ensuring setbacks | More than 45m | 2.0 | Unrestricted | |
| 1(b) | Marriage Hall/ Banquet/ Multipurpose Hall/ Religious Building (Non-Built up) | Max. coverage after ensuring setbacks | =>18 - 24m | 3.0 | 6.0 |
| 1(b) | Marriage Hall/ Banquet/ Multipurpose Hall/ Religious Building (Non-Built up) | Max. coverage after ensuring setbacks | =>24 - 45m | 3.0 | 10.5 |
| 1(b) | Marriage Hall/ Banquet/ Multipurpose Hall/ Religious Building (Non-Built up) | Max. coverage after ensuring setbacks | More than 45m | 3.0 | Unrestricted |
| 2 (a) | Auditorium / Convention Centre (Built-up) | Max. coverage after ensuring setbacks | =>18 - 24m | 2.0 | 4.0 |
| 2 (a) | Auditorium / Convention Centre (Built-up) | Max. coverage after ensuring setbacks | >24 - 45m | 2.0 | 7.0 |
| 2 (a) | Auditorium / Convention Centre (Built-up) | Max. coverage after ensuring setbacks | More than 45m | 2.0 | Unrestricted |
| 2 (b) | =>24 - 45m | 3.0 | 10.5 | ||
| Sl. | Use Types | Ground Coverage (%) | Road Width (m) | Base FAR | Max. FAR |
| Auditorium / Convention Centre (Non-built-up area) | Max. coverage after ensuring setbacks | More than 45m | 3.0 | Unrestricted | |
| 3 | Guest House | Max. coverage after ensuring setbacks | =>12 - 24m | 1.5 | 3.0 |
| 3 | Guest House | Max. coverage after ensuring setbacks | >24 - 45m | 1.5 | 5.25 |
3.2.2.7 Other Uses
Note: Maximum Permissible FAR (MFAR) is calculated as per the provisions of purchasable FAR in Chapter-9
| Sl. | Use Types | Ground Coverage (%) | Road width (m) | Base FAR | Max. FAR |
| Agriculture | |||||
| 1 | Farmhouse | 20% for non-farm activities | =>7 | 0.2 | 0.2 |
| 2 | Dairy Farms | 20% | =>7 | 0.2 | 0.2 |
| Industrial | |||||
| 1 | Industrial Buildings | Max. coverage after ensuring setbacks | Up to 12m | 1.5 | 1.5 |
| 1 | Industrial Buildings | Max. coverage after ensuring setbacks | >12 - 24 m | 2.5 | 5.0 |
| 1 | Industrial Buildings | Max. coverage after ensuring setbacks | >24 - 45 m | 2.5 | 8.75 |
| 1 | Industrial Buildings | Max. coverage after ensuring setbacks | > 45 m | 2.5 | Unrestricted |
| 2 | Flatted factories/ MSME | Max. coverage after ensuring setbacks | Up to 12m | 3.0 | 3.0 |
| 2 | Flatted factories/ MSME | Max. coverage after ensuring setbacks | >12 - 24 m | 3.0 | 6.0 |
| 2 | Flatted factories/ MSME | Max. coverage after ensuring setbacks | >24 - 45 m | 3.0 | 9.0 |
| 2 | Flatted factories/ MSME | Max. coverage after ensuring setbacks | > 45 m | 3.0 | Unrestricted |
| 3 | Data Centers | Max. coverage after ensuring setbacks | Up to 12m | 3.0 | 3.0 |
| 3 | Data Centers | Max. coverage after ensuring setbacks | >12 - 24 m | 3.0 | 6.0 |
| 3 | Data Centers | Max. coverage after ensuring setbacks | >24 - 45 m | 3.0 | 9.0 |
| 3 | Data Centers | Max. coverage after ensuring setbacks | > 45 m | 3.0 | Unrestricted |
| Mixed Use | As per 8.1 | As per 8.1 | As per 8.1 | As per 8.1 | |
| Recreational | |||||
| 1 | Stadium/ Sports Complex | 20% |
3.2.2.8 Exemptions from FAR calculations
| Sl. | Q: Is the structure included in FAR calculation? Key: Y= Yes, included in calculation N = No, not included in calculation NA = Not permitted thus not applicable | t i n u-ilMtu/legn<sup>i</sup>S-<sup>l</sup>i<sup>a</sup> <sup>t</sup>n diees R | g n <sup>i</sup>H<sup>sou</sup> poru G-<sup>l</sup>i<sup>a</sup> <sup>t</sup>n diees R | U<sup>es</sup> diex M/l<sub>i</sub><sup>a</sup>c e<sup>r</sup> mmo C | s <sup>g</sup>n <sup>i</sup>d <sup>l</sup><sub>i</sub>u B iffec O | l <sup>a</sup>n i<sup>o</sup> <sub>i</sub><sup>t</sup><sub>tt</sub>s<sup>u</sup> I<sup>n</sup> | l i<sup>a</sup> dtrsu I<sup>n</sup> | hter O |
|---|---|---|---|---|---|---|---|---|
| 1 | Mezzanine | Y | Y | Y | Y | Y | Y | Y |
| 2 | Pergola (if closed from three or more sides) | Y | Y | Y | Y | Y | Y | Y |
| 3a | Lift Machine Room | N | N | N | N | N | N | N |
| 3b | Lift Shafts (to be counted as covered area only once i.e. on ground floor) | Y | Y | Y | Y | Y | Y | Y |
| 3c | Lift Lobby up to 10 square meters | N | N | N | N | N | N | N |
| 4 | Meter Room (as per electricity authority norms) | N | N | N | N | N | N | N |
| 5 | Cantilever projection at any level (in setbacks) 0.75m width (no construction of any type or any material shall be permitted over projections) | N | N | N | N | N | N | N |
| 6 | Porch/ Portico (Maximum 4-meter x 8 meter). It shall not interfere with Fire tender movement. | Y | Y | Y | Y | Y | Y | Y |
| 7 | Basement(s) within the setback line, if used for: | |||||||
| 7a | Parking lot and garages | N | N | N | N | N | N | N |
| 7b | Air conditioning equipment and other machines | N | N | N | N | N | N | N |
| 7c | DG set room, meter room and electric panel room, Effluent Treatment Plant, suction tank, pump room |