Wastewater generated from residential, industrial, medical, commercial and wastewater generated from garbage shall be treated as per the guidelines given by the state pollution control board.
A wastewater recycling facility shall be installed wherever the minimum estimated water discharge from the building(s) on a plot exceeds 10,000 liters per day.
The applicant shall, along with their application for obtaining necessary development permit/ building permit, submit as part of the services plans, a plan showing the location of wastewater treatment plant, furnishing details of calculations, references, implementation, etc. This plan shall accompany the applicant’s commitment to monitor the system periodically from the date of occupation of the respective building.
Provisions of recycling system
The applicant shall along with his application submit the designs, plans, calculations and the references used for the calculations etc. to provide the system to recycle the grey water. Such system shall include the provisions to facilitate the following:
(i) Treated grey water is pumped to a separate tank on the roof from where grey water will be supplied to water closets, garden taps, car washing taps etc.
(ii) Only water from water closets should be let in to sewerage system.
(iii) Wherever arrangements for reuse of recycled water is provided, additional arrangements for carrying the excess grey water to the sewerage system may also be provided.
(iv) The recycled water shall be used for non-potable, no contact purposes within premises and shall not be connected to sewage/wastewater system of local authority. However, the waste generated by the recycle plant can be connected to local authority sewer network if it is of the accepted quality as mentioned in the guidelines of competent authority.
(v) Separation of grey water:
(a) The wastes from toilets in the premises will be separated from grey water that is of bathroom and kitchen wastes by means of separate down take discharge system.
(b) The grey water shall be recycled by providing recycling plant and shall be reused for non-potable purposes after storing the same in distinctly separate tank by means of purple coloured down take pipes.
(c) The water quality shall conform to standards of non-potable water. The recycled water shall be tested once in six months and results shall be made available to competent authority whenever demanded.
(d) The make‐up connection to the system will be done at the collection tank of the treated water, through a free fall if from Municipal water connection.
(e) Separate plumbing for grey water: Every developer/owner shall provide the newly constructed building with the provision of down take plumbing for grey water, recycling water plant, storage and reuse fitting before selling the building.
(vi) Reuse of water strictly for not potable non‐contact use.
a. The reuse of water will be strictly for not potable use by means of providing a distinctly separate reuse system coloured in purple. The non‐contact uses shall be restricted to toilet flushing, drip irrigation of trees/shrubs, sub surface irrigation of lawns and recharge of ground water.
b. There shall not be cross‐connection of fitting of the potable and not potable water at any point. The recycled water system shall be maintained at a lower operating pressure that of the potable water system. Precautions should be taken to prevent cross contamination.
Quality of Water and Treatment
(i) The water generated after treatment should be safe for its use for flushing toilets, gardening etc.
(ii) The company or the agency engaged for installation of system for recycling of wastewater shall preferably confirm ISO:14000.
(iii) Provision may be made for checking the quality of recycled water with Water testing laboratory with Municipal Corporation or Jal Nigam.
(iv) The testing of wastes and the submission of the results shall be done in a manner in accordance with the terms and conditions prescribed by the Municipal Commissioner or Uttar Pradesh Pollution Control Board (UPPCB) / Competent authority.