All buildings shall provide facilities for solid waste management with segregation of dry and wet waste at source. For waste management in residential buildings (including group housing) and all non-residential buildings with an area of more than 500 square meters, two types of dustbins (biodegradable and non-biodegradable) shall be provided on the ground floor near the entrance of the plot so that it becomes easy for the local body to collect garbage from dustbins every day, de-process it at ward or sector level and prepare fuel cake, fertilizer, paper etc.
Environmental Conditions required for buildings (amended from time to time):
Built-up area
Requirement
Category-A (5000-20000 sqm)
• Separate wet and dry bins must be provided at the ground level for facilitating segregation of waste.
Category-B (20000 -50000 sqm)
Category-C (50000-150000 sqm)
Category-C (50000-150000 sqm)
• All non-biodegradable waste shall be handed over to authorized recyclers for which a written tie-up must be done with the authorized recyclers. • Organic waste composter/vermiculture pit with a minimum capacity of 0.3 Kg/tenement/day must be installed wherein the STP sludge may be used to be converted to manure which could be used at the site or handed over to authorized recyclers for which a written tie-up must be done with the authorized recyclers.
Chapter 13Environmental Sustainability
The general principles for sustainability in buildings shall be in accordance with Part 11- ‘Approach to Sustainability’ of NBC 2016.
13.1 Water Conservation
13.1.1 Water management during construction
Water from authorized sources shall be used for construction. Where ground water is used for construction, permission from the concerned ground water authority shall be taken. Less water intensive construction methods may be employed using prefabricated members, pre-mix concrete, curing agents, etc.
On construction sites, potable water shall be used only for drinking, human activities and concrete works. Use of potable water for any other construction activity may not be allowed. Treated wastewater from appropriate sources should be used in such construction activities after complying with all the required parameters for water use.
13.1.2 Rainwater Harvesting
Rainwater harvesting shall be achieved by adopting the techniques given below:
a) storage of rainwater on surface for future use; and
b) recharge to ground water
All public open spaces and recreational area shall make provisions for rainwater harvesting.
Requirements of Layout/Sub-division Plan for Development Permission
(a) Before making a new plan, geological /hydrological /hydrogeological survey of the area should be conducted and appropriate method should be adopted as per local requirement for recharging of ground water.
(b) In the layout plans of schemes having an area of more than 10 acres (>4 hectares), reservoir(s) shall be constructed at suitable places within the land proposed for parks and open areas, wherein such area shall be a minimum 01 percent of total scheme area. Prior to building such reservoir(s) in such scheme, while identifying natural rainwater catchment areas, the size and depth of such reservoir shall be determined, after study/assessment of envisaged volume of rainwater, hydrogeological, topography, lithology, soil properties of the area, possible retention and ‘stagnation’ of rainwater in the proposed reservoir and the feasibility thereof. However, the maximum depth of the reservoir should be kept at 02 meters. Apart from this, arrangements should be made to dispose only the ‘surface-run-off’ of that scheme in the reservoir; polluted water and effluent should not be mixed in it. Recharge pit/recharge shaft should be made in one corner of the park and open area as per the prescribed standards. Such recharge pits/recharge shafts and reservoirs should be constructed in the direction of the slope in accordance with the regional hydrogeology.
(c) Concrete construction in parks should not be more than 5 percent, including concrete pavement and footpaths and tracks, and should be made using ‘permeable’ or semi-permeable perforated blocks as much as possible. Maximum underground seepage of rainwater should be encouraged in parks and open areas.
(d) Such trees and plants shall be planted on roads, parks and open spaces which require minimum water and which can absorb less water and remain green even in summer.
(e) In the layout plans of new schemes, in addition to infrastructure facilities like water supply, drainage and sewerage network, other separate networks shall be provided for collective recharge of ground water through roof-top rainwater harvesting with an arrangement for recharging pits for individual plots/ buildings and recharging structures at other suitable places.
(f) In the layout plans of new schemes, for plots of areas from 100-300 square meters, it shall not be mandatory to establish rainwater harvesting system in individual buildings if the rainwater from group of buildings flows into the network of the collective recharge of the scheme. However, in relation to buildings constructed on plots of area more than 300 square meters, then it shall be mandatory for the building owner to install rainwater harvesting system himself.
Requirements of Building Plan submitted along with application for permission.
In case of no collective recharge network, roof top rainwater harvesting system in plots of all uses of 300 square meters and more area (including group housing) except waterlogged areas. Construction of rainwater harvesting structures shall be ensured as per standard technology and rainwater shall be allowed to penetrate the soil to the minimum required depth so that the problem of pollution of ground water sources does not arise. Ground water recharging system should not be adopted in areas with water logging problem, but arrangements can be made to collect rainwater received from the roofs of buildings.
Environmental Conditions required for buildings (amended from time to time):
Built-up area
Requirements
Category-A (5000-20000 sqm)
• A rainwater harvesting plan needs to be designed where the recharge bores (minimum one per 5000 sqm of built-up area) shall be provided. The rainwater harvested should be stored in a tank for reuse in household through a provision of separate water tank and pipeline to avoid mixing with potable municipal water supply. The excess rainwater harvested be linked to the tube well bore in the premise through a pipeline after filtration in the installed filters. • The unpaved area shall be more than or equal to 20% of the recreational open spaces.
• The ground water shall not be withdrawn without approval from the competent authority. • Use of potable water in construction should be minimized. • Low flow fixtures and sensors must be used to promote water conservation. • Separation of grey and black water should be done by the use of dual plumbing system.
13.2Energy Conservation
For all public buildings or building complexes with a connected load of 100 kW or greater or having a contract demand of 120 KV or greater and intended to be used for commercial purpose, Energy Conservation Building Code (ECBC) standards, as amended from time to time, shall be applicable.
Occupancy sensors, movement sensors, lux level sensors, etc, may also be considered as switching options for lights, fans, TV, etc, for different closed spaces.
13.2.1 Energy Conservation through Efficient Lighting
A substantial portion of the energy consumed on lighting may be saved by utilization of daylight and rational design of supplementary artificial lights. In common areas, cost effective and energy saving LED/solar lights may be provided.
All exterior lighting may use solar-powered lighting and be fitted with automatic controls so that the lights do not operate during daylight hours.
13.2.2 Energy Conservation through Efficient HVAC
Maximum possible use shall be made of wind induced natural ventilation. An adequate number of circulating fans shall be installed to serve all the rooms during summer months in hot and warm regions and dry and humid conditions.
13.2.3 Solar Energy
All efforts shall be made towards optimum and efficient use of renewable energy in buildings and, thereby reduce the building’s dependency on fuels derived from conventional sources. This may be achieved by installing solar water heater and Solar Photovoltaic (SPV) systems. To facilitate the installation of such a solar system, at least 25-50 percent of roof area may be utilized for installation of solar water heater and SPV system in new buildings.
13.2.3.1 Solar Photovoltaic Power Generation System
All plots having size 500 sqm and above shall install solar photovoltaic power generation system. This should also be encouraged for plots smaller than 500 sqm. The power generated may be used for inhouse utilization or for transfer to the grid.
13.2.3.2 Solar Water Heating System
No new building in the following categories in which there is a system of installation for supplying hot water shall be built unless the system of the installation is also having an auxiliary solar assisted water heating system. Solar water heating systems shall be provided in the following buildings:
a) hotels, lodges, guest houses, service apartments;
b) institutional buildings (hospitals and nursing home);
c) schools, colleges, universities, technical institutions, training centres;
d) assembly buildings (auditorium, community halls, wedding/banquet halls, etc);
e) barracks of armed forces/paramilitary forces and police forces;
f) hostels for schools, colleges, and training centres with more than 100 students.
13.2.4 Energy Efficiency Compliance
Environmental Conditions required for buildings (amended from time to time):
Built-up area
Requirement
Category-A (5000-20000 sqm)
• In common areas, LED/ solar lights must be provided.
Category-B (20000 -50000 sqm)
• In common areas, LED/ solar lights must be provided. • At least 1% of connected applied load generated from renewable energy source such as photovoltaic cells or windmills or hybrid should be provided. • As per the provisions of the Ministry of New and Renewable energy solar water heater of minimum capacity 10 litres/4 persons (2.5 litres per capita) shall be installed. • Use of fly ash bricks: Fly ash should be used as building material in the construction as per the provisions of Fly Ash Notification of September 1999 and as amended from time to time.
Category-C (50000-150000 sqm)
Category-C (50000-150000 sqm)
• Use of concept of passive solar design of buildings using architectural design approaches that minimize energy consumption in buildings by integrating conventional energy-efficient devices, such as mechanical and electric pumps, fans, lighting fixtures and other equipment, with the passive design elements, such as building orientation, landscaping, efficient building envelope, appropriate fenestration, increased day lighting design and thermal mass. • Optimize use of energy systems in buildings that should maintain a specific indoor environment conducive to the functional requirements of the building by following mandatory compliance measures (for all applicable buildings) as recommended in the Energy Conservation Building Code (ECBC) 2007 of the Bureau of Energy Efficiency, Government of India.
13.3 Natural Drainage
Environmental Conditions required for buildings (amended from time to time):
Built-up area
Requirement
Category-A (5000-20000 sqm)
The inlet and outlet point of natural drain system should be maintained with adequate size of channel for ensuring unrestricted flow of water.