Form-A (Part A)
- (I) Name of the applicant…
(II) Current address……
-
Plot number and scheme name/locality/ward number…
-
Area of the plot (in square meters)
-
Permissible use of the building
-
(I) Date of building map approval
(II) Permit number
(III) If it is automatically approved, then along with the details of that provision, also give other relevant details so that it can be proved that this case is covered by the automatically approved provision and the prescribed conditions have been fulfilled. …
- (I) If mitigation of unauthorized construction has been done, then mention the number and date of approval of the plan map.
(II) Date/dates of mitigation pulque payment and receipt number/numbers and attach certified copy of mitigation map.
Receipt number:
Date:
- Construction status: (Give details as per builder approved map/ blast map as applicable)
| Serial number | Provision | Permissible | Construct | Accepted/Mitigated |
|---|---|---|---|---|
| 1 | 2 | 3 | 4 | 5 |
7.1 Set Bank (in Meters) (a) in front (b) behind (c) right (d) left
7.2 Basement (area in square metres)
7.3 Facilities (Yes/No) (a) water supply (b) excretion (Yes/No) (c) drainage (Yes/No) (d) power supply (Yes/No) (e) Rooftop Rainwa (f
(Yes/No)
(f) Solar water heating plant (in plots with area more than 500 sq.m.) (Yes/No)
(Yes/No)
7.4 Internal changes in the building-(a) Under building byelaws (b) if contrary to the byelaws It has been extinguished.
- Certified that the above details are true to the best of my/our personal knowledge. There is no unauthorized construction which has not been mitigated. Therefore, completion certificate should be issued for the construction done on the said building.
Attachment records
Authorized applicant for application Signature of Applicant (With Certificate of authorization)
Form-A (Part-B)
Certificate of Licensed Architect/Engineer
(for residential building)
I inspected the building number……. (including address) ……….. of Shri/Smt. (Applicant's name) ………. on date ……. The above has been found correct after investigation. The findings of my investigation are as follows.
(I) The constructed building is as per the map/approved mitigation map approved by the Development Authority.
Or
(II) Any deviation from the approved map or approved mitigation map in the constructed building is marked at number 7.
Or
(III) The part of the constructed building which was not suitable for mitigation has been demolished. The remaining construction is as per the approved map/mitigation map.
In the above situation, it is recommended to issue completion certificate.
Signature-Licensed Architect/Engineer Name/Address…
Date………
Council of Architecture Registration No. Period of Registration Validity
Form-A (Part-C) Certificate of licensed technical person regarding rainwater harvesting (For residential building)
Provision of rainwater harvesting system (Roof Top Rainwater Harvesting System) in the constructed building has been made as per the building map/applicable byelaws approved by the development authority.
Signature-……. Licensed Technical Person Name/Address …..
Registration Number
Form-A (Part-D) Development Authority's comments and completion certificate: (To be issued on the photocopy of Part 'A', 'B' and 'C' of the application form)
Plot number……… located in Ward/Scheme/Mohalla/Sector………..The above certificate given in relation to the building constructed on, has been examined by Shri…….. (Designation)……. Development Authority and has been found correct as per the map approved by the authority.
Therefore, completion certificate is issued as per Section-15A (2) of Uttar Pradesh Urban Planning and Development Act-1973.
Or
Due to the following reasons, there is no need for site inspection/verification, hence the completion certificate is issued on the basis of the certificate submitted by the architect/engineer-
Signature…………
Designation………
Seal of office…
Date………………