2.1 Land Development and Building Construction Permission
2.1.1 Development Permission
No person shall carry out any development or redevelopment on any plot or land (including subdivision) or cause to be done without obtaining a prior Development Permission of the Authority. No such permission shall be in contravention of the Master Plan/ Zonal Development Plan.
2.1.2 Building Permission
No person shall erect, re-erect or make addition/ alterations/ revisions in any plot/building or cause the same to be done without obtaining a prior building permission from the Authority.
(i) No piece of land shall be used as a site for the construction of a building, and no building shall be constructed or reconstructed, and no addition or alteration shall be made to an existing building without the self certification based declarations or the required approval in the manner specified herein, relating to the use of building sites or the construction or reconstruction of buildings.
(ii) For plots of size upto 100 square meters for residential purpose and plots of size up to 30 square meters for commercial purpose will not require any permission, except in the mela area declared under the Uttar Pradesh Melas Act, 1938 and plots in unauthoritized layouts/ colonies.
Provided the restriction shall be that all provisions of master plan, zonal plan and building byelaws, have been followed. The applicant however needs to register online with a token amount of Rs.1/- and duly self certifying his title, the size of the plot and floors, it shall also not require a completion certificate. Any plot bigger than 100 square meters cannot be split for this purpose or this provision cannot be misused for taking up constructions in government or prohibited or disputed land. An online mechanism shall be developed for submission of a self-declaration in a prescribed format and an affidavit. A certificate of acceptance shall be generated automatically on submission, which shall serve as a certification from the Authority. The onus to ensure authenticity of self-certification and compliance with the self-certification lies with the applicant, who shall be held personally accountable and liable in case of false declaration and action shall be initiated against the said person, as specified.
(iii) For Plots in layouts approved or developed by the Authority: For plots of size upto 500 square meters for residential purpose (except multi-unit) and plots of size up to 200 square meters for commercial purpose, where the plans are prepared by a licensed technical person and certified that the proposed construction/ reconstruction is as per the master plan and building bye-laws, the applicant upon furnishing all required information/details and payment of fees, shall get instant online approval. The onus to ensure authenticity of self-declaration and compliance with the Self-Certification lies on the Owner, Applicant and Licensed Technical Personnel, who shall all be held personally responsible and accountable in case of false declaration, and the Owner, Applicant and the Licensed Technical Personnel, will be liable for action as per law.
(iv) For categories of plots other than (ii) and (iii): For residential plots of size more than 100 square meters and commercial plots of size more than 30 square meters which are not part of approved layouts, residential plots of size over 500 square meters and commercial plots of size over 200 square meters which are part of approved layouts, all types of High Rise Buildings, Group Housing, Multiplexes, Community Facilties, Industrial buildings, and all other categories, etc., one common application form shall be submitted through web based online system as prescribed.
(v) The permission issued under (ii) and (iii) can be revoked by the Authority within 30 days from the date of approval if it is found that approval has been obtained by mis-representation of the facts or false statements, and/or against the building byelaws and Master Plan land use provisions.
(vi) Other exemptions from taking building permit are specified in paragraph 2.5.1. Provided that the Government may exempt certain buildings from taking building permission under this section,
as per section 53 of Uttar Pradesh Urban Planning and Development Act, 1973.
2.1.3 Pre-issued Permissions and provisions for plots allotted by Authority.
2.1.3.1 Where any development/building permit has been issued by the Authority prior to the commencement of these byelaws
(i) If land development/building construction is in progress and the work has not been completed within the validity or extended validity period of such permit, the said development/construction shall be governed by sanctioned map.
(ii) If the validity of the permit has expired and development/construction has not commenced, fresh permit shall be obtained as per the provisions of these building byelaws.
2.1.3.2 Where the plot/land has been allotted through allotment/ public auction with specific restrictions on ground coverage, FAR, setbacks, building height, lease/sale conditions, etc.
(i) In such plots where construction has not been done, any benefit accruing to the owner/developer due to relaxation in development/ construction parameters (which were restricted during auctioning) on application of these byelaws, shall be chargeable.
(ii) In such plots (except group housing) where construction has been done, but the owner/developer intends to take benefits accruing out of these byelaws, due to relaxation in development/ construction parameters (which were restricted during auctioning) on application of these byelaws, shall also be chargeable.
(iii) The benefit accruing out of the application of these byelaws shall not be applicable to those group housing projects where completion/ occupancy certificate has been issued. However, if any legal entity competent under the Uttar Pradesh Apartment Ownership Act, 2010, intends to take such benefits on chargeable basis, the Board of the Authority is competent to take a decision keeping in mind the adequacy of infrastructure provisions, subject to the compliance of relevant statutory provisions.
(iv) For calculation of charges, the allotment/auction price shall be enhanced in proportion to the increase in FAR and also enhanced according to the cost index basis, and differential amount shall be charged to the allottee.
(v) In plots where construction has been done beyond the permissible limits of previous byelaws, but is within permissible limits as per these byelaws, the variation of extra ground coverage, FAR or any other parameter, shall be charged as per compounding provisions in chatper-16. This shall be in addtion to the amount payable as per paragraph (iv) above.
(vi) On deposit of such charges by the owner/developer, consequential changes shall be made in the lease/sale deed by the authority.
Illustrative Example:
For example, for a plot size of 500 sqm (20m width x 25m depth), with reserved price Rs. 100/- auctioned in the year 2000 with ground coverage 45 percent and base FAR 1.25, at a price of Rs. 125/- the current byelaws permit a base FAR of 1.75 and maximum ground coverage after ensuring minimum setbacks. Supposing that the plot owner wants to construct up to the entire permissible ground coverage (i.e. 76 percent for the given plot dimensions), the calculation shall be as below: