11.8.1 Applicability
(i) Earthquake-proof construction requirements will be applicable to buildings with more than 3 floors including ground floor or more than 12 meters in height and all infrastructure facilities with land cover of more than 500 square meters. (Such as water works and overhead tanks, telephone exchanges, bridges and culverts, power generation centres and power sub-stations and power towers, hospitals, photo galleries, auditoriums, assembly halls, educational institutions, bus terminals, etc.)
(ii) For the development of buildings and important infrastructure facilities mentioned in paragraph (I) above, it will be mandatory to adopt 100% of the provisions of Code of Practice of BIS, National Building Code, other relevant guidelines and records mentioned in Chapter-11.1 of the byelaws.
11.8.2 Certificate required for construction permit.
(i) To get the map approved for building construction, architectural plan as per the pre-determined procedure, along with which the relevant parts of the details (related to the drawing) mentioned in the “Building Information Schedule” will be marked on the map in the form of a table on the format given in Appendix-8 and a certificate to this effect will be submitted on the format given in Appendix-9 with the joint signatures of the land owner/builder, the architect who prepared the map and the structural engineer who prepared the structural design of the foundation and superstructure of the building that in the building plan and design of foundation and superstructure, all the provisions related to earthquake resistance, the provisions of the above mentioned codes, guidelines and other relevant records have been 100 percent complied with. Apart from this, complete calculations and structural maps of the foundation and superstructure design of the building signed by the structural engineer will also be submitted along with the forms related to map approval. Also, the maps which will be sent to the authority appointed for the construction of the building, on all those plans, a certificate of earthquake resistant design will be submitted in the format mentioned in Appendix-10 with the full name and sealed signature of the land owner/builder, registered/ licensed architect as well as the structural engineer doing the structural design and the service engineer preparing the service design.
(ii) If any changes/additions are made in the building map presented for approval after testing by the designated authority, then necessary changes in the anti-earthquake provisions in the structural and services design will be made again by the structural engineer and the map will be presented again for approval.
In which the relevant part of the certificate and building information schedule will be mentioned as per above and the execution of building construction works will be ensured as per the finally approved map.
11.8.3 Conditions for construction permission
Approval for building construction will be issued subject to the following conditions:
(a) The proposed construction will be as per the design certified by the Civil Engineer and Architect in accordance with the provisions of the relevant Indian Standards Institute and National Building Code.
(b) The supervision of the construction will also be done under the supervision and responsibility of the architect/engineer and the developer so that compliance with the following safety related arrangements can be ensured:-
I. A site civil engineer with prescribed experience will be assigned to supervise the construction of the building. During supervision, it will be specifically ensured that the building is being constructed as per the design approved by the structural engineer for making all the arrangements for structural safety and anti-earthquake.
II. To ensure the quality of the main construction materials cement, steel, stone grit, brick coarse sand and mortar and concrete mix, etc. that will be used in the construction of the building, it will be necessary to have the facility to test them at the work site itself. Also, by regularly sampling the construction materials, their quality should be physically and chemically tested by authorized laboratories/institutions and their test results should be available at the site itself, so that whenever an expert goes to the site to inspect the works, so can see these test results too.
III. Random technical inspection of the construction work will also be done by an independent expert. The construction work can also be inspected from time to time by experts appointed by the buyer/allottees. In this regard, action will be taken as per the instructions issued from time to time.
(c) If any of the conditions of approval are not followed or the report of the inspecting technical expert is not satisfactory, then further construction work will be stopped and the construction work will be considered unauthorized and may also be sealed. In such a case, completion certificate will not be issued, and the builder and his assistants will be considered guilty of criminal laxity and legal action will be taken accordingly.
(d) A board of size 4 feet x 3 feet shall be installed at a prominent place at the work place. On which the name of the builder and owner, the name of the architect, structural engineer, service design engineer and supervision engineer will be mentioned in such a way that it can be clearly read from the main road adjacent to the building. The following records will also be available at the work site related to construction work: -
(I) Signed and sealed copy of the map approved by the appointed authority.
(II) Complete report of soil testing done by the approved laboratory/institute and recommendations regarding provisions of the proposed foundation.
(III) Calculations of foundation, superstructure and all maps and structural details related to structural safety to make the building earthquake resistant, signed and sealed by an authorized structural engineer.
11.8.4 Completion Certificate
(I) To obtain completion certificate from the land owner/builder, along with the application form to be submitted to the competent authority, a certificate to this effect will be given jointly by the concerned architect, site engineer, land owner/builder on Appendix-11 that the building has been constructed with
the specifications, quality and structural design approved by the structural engineer based on the Indian Standards Institute code, National Building Code and relevant guidelines mentioned in Chapter-11.1 of the byelaws as per the approved map and with all anti-earthquake provisions and the building is safe for use in every way. The officer issuing the completion certificate will ensure that along with all other formalities related to issuing the completion certificate, the security related certificate is also available in the prescribed format. Only after this, completion certificate will be issued.
(II) If any building or any part thereof is put into unauthorized use or is likely to be used without obtaining completion certificate, such construction will be sealed and strict action will be taken against the building owner/builder as per rules.
11.8.5 Determination of qualifications
a) On the basis of construction work and earthquake resistant zone, the qualifications of Structural Engineers, Site Civil Engineers for site supervision and Expert Inspectional Civil Engineers for surprise inspection of work during construction work will be as per paragraph 14.7 (Chapter-14) of these regulations.
b) Post Graduate Structural Engineer mentioned in the said Appendices means, Graduate Degree in Civil Engineering from a recognized Technical Institute/University with Graduate Civil Engineer with Post Graduate Degree in Structural Engineer means Graduate Degree in Civil Engineering from a recognized technical institute/university or equivalent recognized technical qualification. And Diploma Civil Engineering means Diploma in Civil Engineering from a recognized technical institute/university.