The plot size and requirements for various use occupancies shall be as follows.
| Sl. | Use Occupancies | Min. Plot Size (sq.m.) | Min. Existing Road width (m) |
| I | Residential | See Chapter-4 for details | |
| 1 | Plotted - Single/Multi Unit | 40 (Row Housing - Single Unit) No minimum plot size in built-up area | 7.5 (plots on one side) 9 (plots on both sides) 4.0 m (Built-up area) |
| 1 | Plotted - Single/Multi Unit | 150 (Row Housing - Multi Unit) | 9 |
| 1 | Plotted - Single/Multi Unit | 500 (Semi-detached) | 9 |
| 1 | Plotted - Single/Multi Unit | 1200 (Detached) | 9 |
| 2 | Group Housing | 1000 (Built-up) 1500 (Non-built-up) | 9 (Built-up area) 12 (Non-Built-up area) |
| II | Commercial/ Office Buildings | See Chapter-5 for details | |
| 1a | Retail Shops | >10 to 100 | 6 (Built-up) 9 (Non-built-up) |
| 1b | Convenient Shopping / Commercial Units | >100 - 300 | 12 |
| 2 | Commercial Complex | >300 - 3000 | 12 |
| 3 | Shopping mall | > 3000 | 18 |
| 4a | Hotels (<20 rooms) | Not defined | 6 (Built-up) 9 (Non-built-up) |
| 4b | Hotels (>20 rooms) | 500 | 12 |
| 5a | Single Screen Cinema | 500 | 12 |
| 5b | Miniplex | 700 | 12 |
| 5c | Multiplex | 3000 | 18 |
| 6a | Petrol Pump/ Filling Station without service station | 224 (16 x 14) -2w/3w 510 (30 x 17) | 12 (Built-up) 24 (Non-Built-up) |
| Sl. | Use Occupancies | Min. Plot Size (sq.m.) | Min. Existing Road width (m) |
| (CNG/PNG/EV) | |||
| 6b | Petrol Pump/ Filling Station with service station (CNG/PNG/EV) | 1080 (36 x 30) | 12 (Built-up) 24 (Non-Built-up) |
| 7 | LPG / Gas Godown | 520 (26 x20) | 18 |
| 8 | Service Apartment | Not defined | 12 |
| 9 | Cold Storage | 1000 | 18 |
| 10 | Warehousing/ Storage Godown | Not defined | 12 |
| 11 | Wholesale Market | Not defined | 12 |
| 12 | Office Buildings | Not defined | 12 |
| 13 | Other Commercial | Not defined | 9m (Built-up area) 12m (Non-built-up area) |
| III | Community Facilities/ PSP | See Chapter-6 for details | |
| A | Healthcare Facilities | ||
| 1 | Non-Bedded Medical Establishments (Diagnostic Centre/ OPD clinics/ dispensary/ Pathology Lab/ Veterinary Clinics) | 100 | 9 |
| 2 | Nursing Homes / Veterinary Hospitals / Maternity Hospitals/ Small Hospitals (Up to 50 beds) | 300 | 12 |
| 3 | Hospitals (> 50 beds) | 3000 | 18 |
| 4 | Nursing Institutes | 2000 | 18 |
| 5 | Medical College | As per NMC/ MCI norms | 24 |
| B | Education Facilities | ||
| 1 | Nursery | 500 | 9 |
| 2 | Primary | 1000 | 9m (Built-up area) 12m (Non-built-up area) |
| 3 | Secondary/High School/Inter College | 2000 | 12 |
| 4 | Degree College/Technical Institution | 5000 | 18 |
| 5 | Universities | 20000 | 24 |
| C | Public Amenity buildings | ||
| 1 | 750 (Built-up area) | 18 | |
| Sl. | Use Occupancies | Min. Plot Size (sq.m.) | Min. Existing Road width (m) |
| Marriage Hall/ Banquet/ Multipurpose Hall | 1000 - 3000 (Non-built up area) | 18 | |
| Marriage Hall/ Banquet/ Multipurpose Hall | >3000 | 24 | |
| 2 | Auditorium / Convention Centre | 1500 | 18 |
| 2 | Auditorium / Convention Centre | 2000 | 24 |
| D | Other Community Facilities | ||
| 1 | Religious Buildings | Not defined | 12 |
| 2 | Guest House | 400 | 12 |
| 3 | Utilities & Services | Not defined | 12 |
| 4 | Other institutional | Not defined | 12 |
| IV | Agriculture | ||
| 1 | Farmhouse | 4000 | 7 |
| 2 | Dairy Farms | 2000 | 7 |
| V | Industrial | ||
| 1 | Industrial Buildings | Not defined | 9 |
| 2 | Flatted factories | Not defined | 12 |
| 3 | Data Centers | Not defined | 12 |
| 4 | MSME | Not defined | 9 |
| VI | Mixed Use | Refer Chapter-8 | 24 |
| VII | Recreational | ||
| 1 | Stadium/ Sports Complex | Not defined | 18 |
| 2 | Amusement Park | Not defined | 18 |
| 3 | Memorial | Not defined | 9 |
| VIII | Transportation | ||
| 1 | Multi-level Parking | 800 for built-up area 1000 for non-built-up area | 12 |
| 2 | Bus Terminal | Not defined | 12 |
| 3 | Transportation Hub | Not defined | 12 |
Note: For Petrol Pump/Filling Station, in case any amendment is issued by MoPNG or any competent authority, it shall automatically prevail.
The calculation of floor area shall be conducted telescopically, beginning from one level below the area of the proposed plot.
For example, for a plot size of 100 square meters, permissible FAR is 2.0 and for plot size 100 -300 sqm, the permissible FAR is 1.75.
Calculation of FAR for a plot size of 280 square meters, shall be done as below:
a. Plot area of 280 square meters to be divided into two parts, i.e. 100 sqm + 180 sqm
b. For 100 sqm, as per applicable FAR, allowable floor area shall be 100*2.0 = 200 sqm
c. For remaining 180 sqm, as per applicable FAR, allowable floor area shall be 180*1.75 = 315 sqm
d. Hence, total allowable floor area shall be 515 sqm
The ground coverage and FAR for various use occupancies shall be as follows.
3.2.2.1 Residential – Plotted Development including EWS/ LIG/ Affordable Housing
| Sl. | Use Types | Ground Coverage (%) | Plot Area (sq.m.) | Base FAR | Max. FAR |
| 1 | Plotted Development - Single Unit/Multi-Unit (Built-up/Non-Built-up) | Max. coverage after ensuring setbacks | Up to 150 | 2.0 | 2.0 |
| >150 to 300 | 1.8 | 2.0 | |||
| >300 to 500 | 1.75 | 2.0 | |||
| >500 to 1200 | 1.5 | 2.0 | |||
| >1200 | 1.25 | 2.0 |
Note: Maximum Permissible FAR (MFAR) is calculated as per the provisions of purchasable FAR in Chapter-9.
3.2.2.2 Residential – Group Housing including EWS/ LIG/ Affordable Housing
| Sl. | Use Types | Ground Coverage (%) | Road Width (m) | Base FAR | Max. FAR |
| 2(a) |
| Group Housing (Built up) |
| Max. coverage after ensuring setbacks |
| 9 - 12m |
| 1.5 |
| 2.0 |
| >12 - 18m | 1.5 | 3.0 |
| >18 - 24m | 1.5 | 3.0 |
| >24 - 45m | 1.5 | 5.25 |
| > 45m | 1.5 | Unrestricted |
| 2(b) | Group Housing (Non-Built up) | Max. coverage after ensuring setbacks | >12 - 18m | 2.5 | 5.0 |
| >18 - 24m | 2.5 | 5.0 |
| >24 - 45m | 2.5 | 8.75 |
| > 45m | 2.5 | Unrestricted |
Note: Maximum Permissible FAR (MFAR) is calculated as per the provisions of purchasable FAR in Chapter-9
3.2.2.3 Commercial – Shops / Convenience Shopping / Other Commercial
| Sl. | Use Types | Ground Coverage (%) | Road Width (m) | Base FAR | Max. FAR |
|---|---|---|---|---|---|
| 3(a) | Shops / Convenience Shopping / Commercial Units (Built-up) | Max. coverage after ensuring setbacks | Up to 12m | 1.5 | 2.1 |
| >12 - 24m | 1.5 | 3 | |||
| >24 - 45m | 1.5 | 5 | |||
| >45m | 1.5 | Unrestricted | |||
| 3(b) | Shops / Convenience Shopping / Commercial Units (Non-Built up) | Max. coverage after ensuring setbacks | Up to 12m | 1.75 | 2.45 |
| >12 - 24m | 1.75 | 3.5 | |||
| >24 - 45m | 1.75 | 6 | |||
| >45m | 1.75 | Unrestricted | |||
| 4(a) | Commercial Complex (Built up) | Max. coverage after ensuring setbacks | =>12 - 24m | 1.5 | 3 |
| >24 - 45m | 1.5 | 5 | |||
| >45m | 1.5 | Unrestricted | |||
| 4(b) | Commercial Complex (Non-Built up) | Max. coverage after ensuring setbacks | =>12 - 24m | 1.75 | 3.5 |
| >24 - 45m | 1.75 | 6 | |||
| > 45m | 1.75 | Unrestricted | |||
| 5(a) | Shopping malls (Built up) | Max. coverage after ensuring setbacks | =>18 - 24m | 2 | 4 |
| >24 - 45m | 2 | 7 | |||
| > 45m | 2 | Unrestricted | |||
| 5(b) | Shopping malls (Non-Built up) | Max. coverage after ensuring setbacks | =>18 - 24m | 3 | 6 |
| >24 - 45m | 3 | 9 | |||
| > 45m | 3 | Unrestricted | |||
| 6(a) | Hotels (Built up) | Max. coverage after ensuring setbacks | =>12 - 24m | 2 | 4 |
| >24 - 45m | 2 | 7 | |||
| > 45m | 2 | Unrestricted | |||
| 6(b) | Hotels (Non-Built up) | Max. coverage after ensuring setbacks | =>12 - 24m | 2.5 | 5 |
| >24 - 45m | 2.5 | 8.75 | |||
| > 45m | 2.5 | Unrestricted | |||
| 7 (a) | Single Screen Cinema (Built-up/Non-built up) | Max. coverage after ensuring setbacks | =>12 - 24m | 2 | 4 |
| >24 - 45m | 2 | 7 | |||
| > 45m | 2 | Unrestricted | |||
| 7(b) | Miniplex (Built-up/Non-built up) | Max. coverage after ensuring setbacks | =>12 - 24m | 2 | 4 |
| >24 - 45m | 2 | 7 | |||
| > 45m | 2 | Unrestricted | |||
| 7(c) | Multiplex (Built up) | Max. coverage after ensuring setbacks | =>18 - 24m | 2 | 4 |
| >24 - 45m | 2 | 7 | |||
| > 45m | 2 | Unrestricted | |||
| 7(d) | Multiplex (Non-Built up) | Max. coverage after ensuring setbacks | =>18 - 24m | 3 | 6 |
| >24 - 45m | 3 | 9 | |||
| > 45m | 3 | Unrestricted | |||
| 8(a) | Petrol Filling Station w/o service station (Built up) | 10% | =>12m | 0.1 | - |
| 8(b) | Petrol Filling Station w/o service station (Non Built up) | 10% | =>24m | 0.15 | |
| 8(c) | Petrol Filling Station with service station (Built up) | 20% | =>12m | 0.2 | - |
| 8(d) | Petrol Filling Station with service station (Non-Built up) | 10% | =>24m | 0.1 | |
| 9 | LPG / Gas Go down | 25% | =>18m | 0.25 | 0.25 |
| 10(a) | Service Apartment (Built-up) | Max. coverage after ensuring setbacks | =>12 - 24m | 2 | 4 |
| >24 - 45m | 2 | 7 | |||
| > 45m | 2 | Unrestricted | |||
| 10(b) | Service Apartment (Non-Built up) | Max. coverage after ensuring setbacks | =>12 - 24m | 2.5 | 5 |
| >24 - 45m | 2.5 | 8.75 | |||
| > 45m | 2.5 | Unrestricted | |||
| 11 | Cold Storage | 18m | |||
| 12(a) | Storage/Warehousing (Built up) | Max. coverage after ensuring setbacks | 12m | 0.8 | 0.8 |
| 12(b) | Storage/Warehousing (Non-Built up) | Max. coverage after ensuring setbacks | 12m | 1.2 | 1.2 |
| 13 | Fruit & Vegetable Market | Max. coverage after ensuring setbacks | 12m | 1 | 1 |
| 14(a) | Wholesale Business (Built) | Max. coverage after ensuring setbacks | 12m | 1.2 | 1.2 |
| 14(b) | Wholesale Business (Non-Built) | Max. coverage after ensuring setbacks | 12m | 1.5 | 1.5 |
| 15(a) | Office Buildings (Built up) | Max. coverage after ensuring setbacks | =>18 - 24m | 2 | 4 |
| >24 - 45m | 2 | 7 | |||
| > 45m | 2 | Unrestricted | |||
| 15(b) | Office Buildings (Non-Built up) | Max. coverage after ensuring setbacks | =>18 - 24m | 2.5 | 5 |
| >24 - 45m | 2.5 | 8.75 | |||
| > 45m | 2.5 | Unrestricted | |||
| 16(a) | Other Commercial (Built up) | Max. coverage after ensuring setbacks | Up to 12m | 1.5 | 2.1 |
| >12 - 24m | 1.5 | 3.0 | |||
| >24 - 45m | 1.5 | 5.0 | |||
| >45m | 1.5 | Unrestricted | |||
| 16(b) | Other Commercial (Non-Built) | Max. coverage after ensuring setbacks | =>12 -24m | 1.75 | 3.5 |
| >24 -45m | 1.75 | 6.0 | |||
| >45m | 1.75 | Unrestricted |
Note: Maximum Permissible FAR (MFAR) is calculated as per the provisions of purchasable FAR in Chapter-9
3.2.2.4 Community Facilities – Healthcare Buildings
| Sl. | Use Types | Ground Coverage (%) | Road Width (m) | Base FAR | Max. FAR |
| 1 | Non-Bedded Medical Establishments (Diagnostic Centre / OPD clinics / dispensary / Pathology Lab / Veterinary Clinics) | Max. coverage after ensuring setbacks | Up to 12m | 1.5 | 2.1 |
| >12 - 24m | 1.5 | 3.0 | |||
| >24 - 45m | 1.5 | 5.25 | |||
| > 45m | 1.5 | Unrestricted | |||
| 2(a) | Nursing Homes / Veterinary Hospitals / Maternity Hospitals / Small Hospitals (Up to 50 beds) (Built up) | Max. coverage after ensuring setbacks | =>12 - 24m | 1.5 | 3.0 |
| >24 - 45m | 1.5 | 5.25 | |||
| > 45m | 1.5 | Unrestricted | |||
| 2(b) | Nursing Homes / Veterinary Hospitals / Maternity Hospitals / Small Hospitals (Up to 50 beds) (Non-Built up) | Max. coverage after ensuring setbacks | =>12 - 24m | 2.0 | 4.0 |
| >24 - 45m | 2.0 | 7.0 | |||
| > 45m | 2.0 | Unrestricted | |||
| 3(a) | Hospital > 50 beds (Built up) | Max. coverage after ensuring setbacks | =>18 - 24m | 1.5 | 3.0 |
| >24 - 45m | 1.5 | 5.25 | |||
| > 45m | 1.5 | Unrestricted | |||
| 4(b) | Hospital > 50 beds (Non-Built up) | Max. coverage after ensuring setbacks | =>18 - 24m | 2.5 | 5.0 |
| >24 - 45m | 2.5 | 8.75 | |||
| > 45m | 2.5 | Unrestricted | |||
| 5(a) | Nursing college (Built up) | Max. coverage after ensuring setbacks | =>18 - 24m | 1.5 | 3.0 |
| >24 - 45m | 1.5 | 5.25 | |||
| > 45m | 1.5 | Unrestricted | |||
| 5(b) | Nursing college (Non-Built up) | Max. coverage after ensuring setbacks | =>18 - 24m | 2.0 | 4.0 |
| >24 - 45m | 2.0 | 7.0 | |||
| > 45m | 2.0 | Unrestricted | |||
| 6(a) | Medical College (Built up) | Max. coverage after ensuring setbacks | =>24 - 45m | 1.5 | 5.25 |
| > 45m | 1.5 | Unrestricted | |||
| 6(b) | Medical College (Non-Built up) | Max. coverage after ensuring setbacks | =>24 - 45m | 2.5 | 8.75 |
| > 45m | 2.5 | Unrestricted |
Note: Maximum Permissible FAR (MFAR) is calculated as per the provisions of purchasable FAR in Chapter-9
3.2.2.5 Community Facilities – Education Buildings
| Use Types | Ground Coverage (%) | Road Width (m) | Base FAR | Max. FAR | |
| 1(a) | Schools (Nursery/Primary) (Built up) | Max. coverage after ensuring setbacks | Up to 12m | 1.0 | 1.4 |
| >12 - 24 m | 1.0 | 2.0 | |||
| >24 - 45 m | 1.0 | 3.0 | |||
| > 45 m | 1.0 | 3.0 | |||
| 2(b) | Schools (Nursery/Primary) (Non-Built up) | Max. coverage after ensuring setbacks | Up to 12m | 1.2 | 1.4 |
| >12 - 24 m | 1.2 | 2.4 | |||
| >24 - 45 m | 1.2 | 3.6 | |||
| > 45 m | 1.2 | 3.6 | |||
| 3(a) | Secondary/Intercollege/Degree Colleges / Universities (Built up) | Max. coverage after ensuring setbacks | =>12 - 24 m | 1.0 | 2.0 |
| >24 - 45 m | 1.0 | 3.5 | |||
| > 45 m | 1.0 | Unrestricted | |||
| 3(b) | Secondary/Intercollege/Degree Colleges / Universities (Non-Built up) | Max. coverage after ensuring setbacks | =>12 - 24 m | 2.0 | 4.0 |
| >24 - 45 m | 2.0 | 7.0 | |||
| > 45 m | 2.0 | Unrestricted |
Note: Maximum Permissible FAR (MFAR) is calculated as per the provisions of purchasable FAR in Chapter-9
3.2.2.6 Community Facilities – Public Amenities
| Sl. | Use Types | Ground Coverage (%) | Road Width (m) | Base FAR | Max. FAR |
| 1(a) | Marriage Hall/ Banquet/ Multipurpose Hall/ Religious Building (Built up) | Max. coverage after ensuring setbacks | =>18 - 24m | 2.0 | 4.0 |
| Marriage Hall/ Banquet/ Multipurpose Hall/ Religious Building (Built up) | Max. coverage after ensuring setbacks | >24 - 45m | 2.0 | 7.0 | |
| Marriage Hall/ Banquet/ Multipurpose Hall/ Religious Building (Built up) | Max. coverage after ensuring setbacks | More than 45m | 2.0 | Unrestricted | |
| 1(b) | Marriage Hall/ Banquet/ Multipurpose Hall/ Religious Building (Non-Built up) | Max. coverage after ensuring setbacks | =>18 - 24m | 3.0 | 6.0 |
| 1(b) | Marriage Hall/ Banquet/ Multipurpose Hall/ Religious Building (Non-Built up) | Max. coverage after ensuring setbacks | =>24 - 45m | 3.0 | 10.5 |
| 1(b) | Marriage Hall/ Banquet/ Multipurpose Hall/ Religious Building (Non-Built up) | Max. coverage after ensuring setbacks | More than 45m | 3.0 | Unrestricted |
| 2 (a) | Auditorium / Convention Centre (Built-up) | Max. coverage after ensuring setbacks | =>18 - 24m | 2.0 | 4.0 |
| 2 (a) | Auditorium / Convention Centre (Built-up) | Max. coverage after ensuring setbacks | >24 - 45m | 2.0 | 7.0 |
| 2 (a) | Auditorium / Convention Centre (Built-up) | Max. coverage after ensuring setbacks | More than 45m | 2.0 | Unrestricted |
| 2 (b) | =>24 - 45m | 3.0 | 10.5 | ||
| Sl. | Use Types | Ground Coverage (%) | Road Width (m) | Base FAR | Max. FAR |
| Auditorium / Convention Centre (Non-built-up area) | Max. coverage after ensuring setbacks | More than 45m | 3.0 | Unrestricted | |
| 3 | Guest House | Max. coverage after ensuring setbacks | =>12 - 24m | 1.5 | 3.0 |
| 3 | Guest House | Max. coverage after ensuring setbacks | >24 - 45m | 1.5 | 5.25 |
| 3 | Guest House | Max. coverage after ensuring setbacks | More than 45m | 1.5 | Unrestricted |
| 4 | Utilities & Services | 10% | 0.1 | ||
| 5 | Other institutional/ PSP | =>12 - 24m | 2.0 | 4.0 | |
| 5 | Other institutional/ PSP | >24 - 45m | 2.0 | 7.0 | |
| 5 | Other institutional/ PSP | More than 45m | 2.0 | Unrestricted |
3.2.2.7 Other Uses
Note: Maximum Permissible FAR (MFAR) is calculated as per the provisions of purchasable FAR in Chapter-9
| Sl. | Use Types | Ground Coverage (%) | Road width (m) | Base FAR | Max. FAR |
| Agriculture | |||||
| 1 | Farmhouse | 20% for non-farm activities | =>7 | 0.2 | 0.2 |
| 2 | Dairy Farms | 20% | =>7 | 0.2 | 0.2 |
| Industrial | |||||
| 1 | Industrial Buildings | Max. coverage after ensuring setbacks | Up to 12m | 1.5 | 1.5 |
| 1 | Industrial Buildings | Max. coverage after ensuring setbacks | >12 - 24 m | 2.5 | 5.0 |
| 1 | Industrial Buildings | Max. coverage after ensuring setbacks | >24 - 45 m | 2.5 | 8.75 |
| 1 | Industrial Buildings | Max. coverage after ensuring setbacks | > 45 m | 2.5 | Unrestricted |
| 2 | Flatted factories/ MSME | Max. coverage after ensuring setbacks | Up to 12m | 3.0 | 3.0 |
| 2 | Flatted factories/ MSME | Max. coverage after ensuring setbacks | >12 - 24 m | 3.0 | 6.0 |
| 2 | Flatted factories/ MSME | Max. coverage after ensuring setbacks | >24 - 45 m | 3.0 | 9.0 |
| 2 | Flatted factories/ MSME | Max. coverage after ensuring setbacks | > 45 m | 3.0 | Unrestricted |
| 3 | Data Centers | Max. coverage after ensuring setbacks | Up to 12m | 3.0 | 3.0 |
| 3 | Data Centers | Max. coverage after ensuring setbacks | >12 - 24 m | 3.0 | 6.0 |
| 3 | Data Centers | Max. coverage after ensuring setbacks | >24 - 45 m | 3.0 | 9.0 |
| 3 | Data Centers | Max. coverage after ensuring setbacks | > 45 m | 3.0 | Unrestricted |
| Mixed Use | As per 8.1 | As per 8.1 | As per 8.1 | As per 8.1 | |
| Recreational | |||||
| 1 | Stadium/ Sports Complex | 20% | 12m | 0.4 | 0.4 |
| 2 | Amusement Park | 20% | 12m | 1.0 | 1.0 |
| Transportation | |||||
| Sl. | Use Types | Ground Coverage (%) | Road width (m) | Base FAR | Max. FAR |
| 1 | Multi-level Parking/ Bus Terminal/ Transportation Hub | Max. coverage after ensuring setbacks | =>12 - 24 m | 1.5 | 3.0 |
| >24 - 45 m | 1.5 | 5.25 | |||
| > 45 m | 1.5 | Unrestricted | |||
| Parks and Open Spaces | |||||
| Open spaces (Built-up area) | 5% | 0.1* | |||
| Open spaces (Non-Built-up area) | 5% | 0.1* |
Note: Maximum Permissible FAR (MFAR) is calculated as per the provisions of purchasable FAR in Chapter-9 *Note: Only for ancillary use.
3.2.2.8 Exemptions from FAR calculations
| Sl. | Q: Is the structure included in FAR calculation? Key: Y= Yes, included in calculation N = No, not included in calculation NA = Not permitted thus not applicable | t i n u-ilMtu/legn<sup>i</sup>S-<sup>l</sup>i<sup>a</sup> <sup>t</sup>n diees R | g n <sup>i</sup>H<sup>sou</sup> poru G-<sup>l</sup>i<sup>a</sup> <sup>t</sup>n diees R | U<sup>es</sup> diex M/l<sub>i</sub><sup>a</sup>c e<sup>r</sup> mmo C | s <sup>g</sup>n <sup>i</sup>d <sup>l</sup><sub>i</sub>u B iffec O | l <sup>a</sup>n i<sup>o</sup> <sub>i</sub><sup>t</sup><sub>tt</sub>s<sup>u</sup> I<sup>n</sup> | l i<sup>a</sup> dtrsu I<sup>n</sup> | hter O |
|---|---|---|---|---|---|---|---|---|
| 1 | Mezzanine | Y | Y | Y | Y | Y | Y | Y |
| 2 | Pergola (if closed from three or more sides) | Y | Y | Y | Y | Y | Y | Y |
| 3a | Lift Machine Room | N | N | N | N | N | N | N |
| 3b | Lift Shafts (to be counted as covered area only once i.e. on ground floor) | Y | Y | Y | Y | Y | Y | Y |
| 3c | Lift Lobby up to 10 square meters | N | N | N | N | N | N | N |
| 4 | Meter Room (as per electricity authority norms) | N | N | N | N | N | N | N |
| 5 | Cantilever projection at any level (in setbacks) 0.75m width (no construction of any type or any material shall be permitted over projections) | N | N | N | N | N | N | N |
| 6 | Porch/ Portico (Maximum 4-meter x 8 meter). It shall not interfere with Fire tender movement. | Y | Y | Y | Y | Y | Y | Y |
| 7 | Basement(s) within the setback line, if used for: | |||||||
| 7a | Parking lot and garages | N | N | N | N | N | N | N |
| 7b | Air conditioning equipment and other machines | N | N | N | N | N | N | N |
| 7c | DG set room, meter room and electric panel room, Effluent Treatment Plant, suction tank, pump room | N | N | N | N | N | N | N |
| 7d | Storage of household goods or other goods or ordinarily non-combustible material incidental to principal use | N | N | N | N | N | N | N |
| 7e | Storage not incidental to principal use. | Y | Y | Y | Y | Y | Y | Y |
| 7f | Non-combustible storage rooms (stacking rooms) of libraries | Y | Y | Y | Y | Y | Y | Y |
| 7g | Strong rooms, bank lockers, safe deposit vaults, laundry room, radio/laser therapy, post-mortem room, mortuary, medical shop and cold storage for hospital building etc. | Y | Y | Y | Y | Y | Y | Y |
| 7h | Offices and commercial uses (if air-conditioned) | Y | Y | Y | Y | Y | Y | Y |
| 7i | Commercial use in first basement in case of shopping center/ shopping malls. | Y | Y | Y | Y | Y | Y | Y |
| Sl. | Q: Is the structure included in FAR calculation? Key: Y= Yes, included in calculation N = No, not included in calculation NA = Not permitted thus not applicable | t i n u-ilMtu/legn<sup>i</sup>S-<sup>l</sup>i<sup>a</sup> <sup>t</sup>n diees R | g n <sup>i</sup>H<sup>sou</sup> poru G-<sup>l</sup>i<sup>a</sup> <sup>t</sup>n diees R | U<sup>es</sup> diex M/l<sub>i</sub><sup>a</sup>c e<sup>r</sup> <sup>m</sup><sub>m</sub>o C | s <sup>g</sup>n <sup>i</sup>d <sup>l</sup><sub>i</sub>u B iffec O | l <sup>a</sup>n i<sup>o</sup> <sub>i</sub><sup>t</sup><sub>tt</sub>s<sup>u</sup> I<sup>n</sup> | l i<sup>a</sup> dtrsu I<sup>n</sup> | hter O |
| 7j | Nursing quarters as ancillary use to hospital in first basement, if proper ventilation is ensured. | Y | Y | Y | Y | Y | Y | Y |
| 7k | Any other use related to ancillary use, e.g. toilets, if proper requirements of lighting, ventilation and fire safety are adhered to | Y | Y | Y | Y | Y | Y | Y |
| 7l | In mixed use buildings, uses other than ancillary uses shall also be allowed after meeting lighting, ventilation and fire safety requirements. | Y | Y | Y | Y | Y | Y | Y |
| 8a | Stilt floor used for parking | N | N | N | N | N | N | N |
| 8b | Stilt Floor used for any purpose other than parking | Y | Y | Y | Y | Y | Y | Y |
| 9 | Podium Parking (with max. 10% of permissible land cover utilized for Driver Restroom, Store, Sanitary Block and other similar services) | N | N | N | N | N | N | N |
| 10 | Separate Parking Block for Plot Area above 4000 sqm. | N | N | N | N | N | N | N |
| 11 | Locked Garages in Rear Setback | N | Y | Y | Y | Y | Y | Y |
| 12a | Balconies up to 2.0 metres | N | N | Y | Y | Y | Y | Y |
| 12b | Balconies beyond 2.0 metres | Y | Y | Y | Y | Y | Y | Y |
| 13a | Staircase | Y | Y | Y | Y | Y | Y | Y |
| 13b | Fire Escape/ External Staircase | N | N | N | N | N | N | N |
| 14 | Planters and Sun Control Devices | N | N | N | N | N | N | N |
| 15 | Jali of any material to cover AC/cooler units | N | N | N | N | N | N | N |
| 16 | Rockery, well & well structures, water pool, uncovered swimming pool, tree platform, tank, fountain, bench, open-top & unenclosed chabutra, compound wall, gate, slide, swing, underground water tanks, overhead water tanks on top of buildings, open shafts, culverts on drain | N | N | N | N | N | N | N |
| 17 | Open ramps with no area enclosed below it of usable height. If used for approach to the entrance of the building, then the height as per requirement may be considered. The space under the ramp shall not be used for any commercial purpose, however it can be landscaped with approval of the Authority on case-to-case basis. | N | N | N | N | N | N | N |
| 18 | Open ramps for movement of vehicles in side setback only | N | N | N | N | N | N | N |
| 19a | Atriums in Commercial/ Office & PSP above 3000 sqm Plot Area | NA | NA | N | N | N | NA | NA |
| 19b | Temporary Counters maximum up to 20% of the area of Atrium | NA | NA | N | N | N | NA | NA |
| 20 | Service Floors (max. up to 3 floors), allowed on every 4<sup>th</sup> floor in a multistorey building | NA | NA | N | N | N | N | N |
| 21 | Any other feature purely ornamental in nature and not enclosing or covering space of commercial use may be permitted by Vice Chairman on case-to-case basis. | NA | N | N | N | N | N | N |
| 22 | Loft up to 30% of room area (max. 1.5 metre height) | N | N | N | N | N | N | N |
| 23 | Mumty | N | N | N | N | N | N | N |
| 24 | Bay Windows and Almirahs/ Niche | N | N | N | N | N | N | N |
| 25 | Refuge Area (As per fire norms) | N | N | N | N | N | N | N |
| Sl. | Q: Is the structure included in FAR calculation? Key: Y= Yes, included in calculation N = No, not included in calculation NA = Not permitted thus not applicable | t i n u-ilMtu/legn<sup>i</sup>S-<sup>l</sup>i<sup>a</sup> <sup>t</sup>n diees R | g n <sup>i</sup>H<sup>sou</sup> poru G-<sup>l</sup>i<sup>a</sup> <sup>t</sup>n diees R | U<sup>es</sup> diex M/l<sub>i</sub><sup>a</sup>c e<sup>r</sup> <sup>m</sup><sub>m</sub>o C | s <sup>g</sup>n <sup>i</sup>d <sup>l</sup><sub>i</sub>u B iffec O | l <sup>a</sup>n i<sup>o</sup> <sub>i</sub><sup>t</sup><sub>tt</sub>s<sup>u</sup> I<sup>n</sup> | l i<sup>a</sup> dtrsu I<sup>n</sup> | hter O |
| 26 | Service Duct | N | N | N | N | N | N | N |
| 27 | Services such as air conditioning equipment and other machines, DG set room, meter room and electric panel room, Effluent Treatment Plant, suction tank, pump room - maximum up to 5% of permissible FAR or 50sqm (incase of Plot Area <= 4000 sqm) / 100 sqm (in case of Plot Area > 4000 sqm) | N | N | N | N | N | N | N |
Note: A maximum of 5.0 percent of the permissible FAR shall be availed for various types of services like airconditioned plants, in front of the lift (except corridor outside the lift), up to10 square meters shall be allowed for lobby, machine room for lift, Mumty, shelves and windows (maximum 0.60-meter depth and 1.80-meters length), refuse area (as per NBC), service duct and community centre.
The maximum building height for various use occupancies shall be as follows.
| Sl. | Use Occupancies | Max. Building Height (m) |
|---|---|---|
| I | Residential (Built-up/ Non-Built-up) | |
| 1 | Plotted - Single-Unit | 15 |
| 2 | Plotted - Multi-unit | 17.5 |
| 3 | Group Housing | No Restriction |
| II | Commercial | |
| 1 | Shops / Convenient Shopping / Commercial Units | No Restriction |
| 2 | Commercial Complex | No Restriction |
| 3 | Shopping mall | No Restriction |
| 4 | Hotels | No Restriction |
| 5 | Single screen cinema/ Miniplex/ Multiplex | No Restriction |
| 6 | Petrol Pump / Filling Station | 6 |
| t7 | LPG / Gas Go down | 6 |
| III | Community Facilities | |
| A | Healthcare Buildings | |
| 1 | Non-Bedded Medical Establishments (Diagnostic Centre / OPD clinics / dispensary / Pathology Lab / Veterinary Clinics) | No Restriction |
| 2 | Nursing Homes / Veterinary Hospitals / Maternity Hospitals / Small Hospitals (Up to 50 beds) | No Restriction |
| 3 | Hospitals (> 50 beds) | No Restriction |
| 4 | Nursing Institutes | No Restriction |
| 5 | Medical College | No Restriction |
| B | Educational Buildings | No Restriction |
| 1 | Nursery | No Restriction |
| 2 | Primary | No Restriction |
| 3 | High School | No Restriction |
| 4 | Technical Institution | No Restriction |
| 5 | Universities | No Restriction |
| C | Public Amenity buildings | |
| 1 | Marriage / Festival Hall | No Restriction |
| 2 | Auditorium / Convention Centre | No Restriction |
| IV | Agriculture | |
| 1 | Farmhouse | No restriction |
| 2 | Dairy Farms | No restriction |
| V | Industrial | |
| 1 | Industrial buildings | No Restriction |
| 2 | Flatted factories | No Restriction |
| 3 | Data Centers | No Restriction |
| VI | Mixed Use | No Restriction |
| VII | Recreational | |
| 1 | Stadium/ Sports Complex | No Restriction |
| 2 | Amusement Park | No Restriction |
| 3 | Memorial | No Restriction |
| VIII | Transportation | |
| 1 | Multi-level Parking | No Restriction |
| 2 | Bus Terminal | No Restriction |
| 3 | Transportation Hub | No Restriction |
Note:
(i) The maximum height of buildings shall be measured above the surrounding average road level and following supporting structures shall not be included in the height of the building: -
(ii) Rooftop tanks and their supporting structures not exceeding 2.0 m in height, rooftop structures required to capture alternative solar energy, ventilation, air conditioning equipment, lift rooms not exceeding 4.5 m in height and such other service equipment, ladders covered by mumty slab and not exceeding 3.0 m in height. Chimney, parapet wall and structures for enhancing the aesthetics of the building which are not more than 1.5 m height provided the total area of such structures including the ‘barsati’ do not exceed one third of the area of the roof of the building
on which it is constructed.
(iii) The height of buildings adjacent to the aerodrome/air-force stations shall be in accordance with the orders issued by the Government of India/ Ministry of Civil Aviation/ Ministry of Defence, Airport Authority of India, from time to time.
(iv) The maximum height of the building shall also be governed by the distance from the protected monument / heritage site, airport funnel zone and other statutory restrictions.
3.2.4.1 Residential – Plotted Development (Single/Multi-units up to 15-meter height)
Under plotted development, for all single/multi-units less than 300 square meters plot size, three floors with stilts up to 15 meter is allowed and on plots above 300 square meters, four storeys with stilts up to 17.5-meter height is allowed. The set-back shall be as follows:
| Plot Area (sqm) | Setback (meter) | |||
| Front | Rear | Side-1 | Side-2 | |
| (a) Row-housing | ||||
| Up to 150 | 1 | 0 | 0 | 0 |
| >150 to 300 | 3 | 1.5 | 0 | 0 |
| >300 to 500 | 3 | 3 | 0 | 0 |
| (b) Semi-detached | ||||
| >500 to 1200 | 4.5 | 4.5 | 1.5 | 0 |
| (c) Detached | ||||
| >1200 | 6 | 6 | 1.5 | 1.5 |
Note-1: Construction shall be permitted on 40 percent of the rear setback up to 7 meter height, in semi-detached buildings. But in corner plots the said covering shall be permissible only after leaving the side set back. In case of stilt floor, construction on 40 percent area of the rear setback shall not be allowed.
Note-2: The side setback in a corner plot in the new layouts shall be the same as the front setback of the concerned plot. In already approved layouts, if setback is not prescribed in the layout plan, the minimum side set-back in corner plots up to 500 square meters shall be 1.5 meters and in corner plots having area more than 500 square meters, the side set-back shall be as per the above table.
Note-3: If the number of plots in a block is odd, then in view of the need to leave a setback on both sides, in plots larger than 1200 square metres, the width of the corner plot shall be kept larger accordingly. The front and rear setbacks for corner plots shall be the same as prescribed for other plots in that scheme so that there is uniformity in the 'building block'.
Note-4: In case sub-division of any plot is permissible in a planned developed area/scheme, the set-back in the sub-divided plots shall be as per the original plot.
Note-5: The setbacks specified in the table at paragraph 3.2.4.1 shall be applicable in the new subdivision/layout plan. But in non-built up areas, the residential plots within layouts in which set-back is not prescribed shall also have set-back as per the above paragraph 3.2.4.1.
3.2.4.2 Residential – Group Housing up to 15-meter height
| Building Height (m) | Setback (meter) | |||
| Front | Rear | Side-1 | Side-2 | |
| Group Housing up to 15-meters | 5 | 5 | 5 | 5 |
3.2.4.3 Commercial – Shops/commercial units, Mixed use buildings up to 15-meter height
| Plot Area (sqm) | Setback (meter) | |||
| Front | Rear | Side-1 | Side-2 | |
| Up to 100 | 1.5 | - | - | - |
| >100 - 300 | 3 | - | - | - |
| >300 - 1000 | 4.5 | 3 | 1.5 | 1.5 |
| >1000 - 3000 | 6 | 3 | 3 | 3 |
| >3000 | 12 | 6 | 6 | 6 |
Note-1: In commercial building with covered area on ground floor up to 500 sqm, if lighting and ventilation requirements are ensured, then setbacks shall not be mandatory along the rear and the side edges, whereas in the corner plots, side setback equal to the front set-back shall be mandatory.
Note-2: Under plot development, sector / neighbourhood / local level shopping centres shall be allowed in the form of lined shops, in which provision of a maximum 3-meter-wide covered corridor (arcade) in the front shall be allowed.
Note-3: The permissible front setbacks for buildings on bazaar street shall be as follows (also defined in Chapter-5).
| Proposed width of road (metres) | Minimum open space in front (metres) |
|---|---|
| 12 | 3.0 |
| 18 | 4.5 |
| 24 | 6.0 |
| 30 | 6.0 |
| 36 | 7.5 |
| 45 | 7.5 |
| 76 | 9.0 |
Note-4: The side setback in a corner plot in the new layouts shall be the same as the front setback of the concerned plot. In already approved layouts, if setback is not prescribed in the layout plan, the minimum side set-back in corner plots up to 500 square meters shall be 1.5 meters and in corner plots having area more than 500 square meters, the side set-back shall be as per the above table.
3.2.4.4 Other Commercial – building height up to 15-meters
| Building Height (m) | Setback (meter) | |||
| Front | Rear | Side-1 | Side-2 | |
| Hotels/ Single screen cinema/ Miniplex | 5 | 3 | 3 | 3 |
| Multiplex/ Shopping Malls | 9 | 6 | 6 | 6 |
| Petrol filling station w/o Service Station | 3 | - | - | - |
| Petrol filling station with Service Station | 6 | - | - | - |
| LPG Gas Godown | 6 | 3 | 3 | 3 |
3.2.4.5 Community Facilities – Healthcare buildings height up to 15-meters
| Plot Area (sqm) | Setback (meter) | Setback (meter) | Setback (meter) | Setback (meter) |
| Plot Area (sqm) | Front | Rear | Side-1 | Side-2 |
| =>100 - 300 | 3 | 1.5 | 0 | 0 |
| >300 - 1000 | 4.5 | 3 | 3 | 0 |
| >1000 - 2000 | 6 | 3 | 3 | 3 |
| >2000 - 4000 | 7.5 | 4.5 | 4.5 | 4.5 |
| > 4000 | 9 | 6 | 6 | 6 |
3.2.4.6 Community Facilities – Educational buildings height up to 15-meters
| Plot Area (sqm) | Setback (meter) | |||
| Front | Rear | Side-1 | Side-2 | |
| Up to 1000 | 6 | 3 | 3 | - |
| >1000 - 2000 | 6 | 3 | 3 | 3 |
| >2000 - 4000 | 9 | 3 | 3 | 3 |
| >4000 - 30000 | 9 | 4.5 | 3 | 3 |
| > 30000 | 15 | 6 | 6 | 6 |
3.2.4.7 Community Facilities – Public Amenity buildings height up to 15-meters
| Plot Area (sqm) | Setback (meter) | |||
| Front | Rear | Side-1 | Side-2 | |
| Marriage/ Banquet/ Multipurpose Hall | ||||
| 1000 - 3000 | 12 | 4.5 | 4.5 | 3 |
| More than 3000 | 12 | 5 | 5 | 5 |
| Auditorium / Convention Centre | ||||
| 1500 - 3000 | 12 | 4.5 | 4.5 | 3 |
| More than 3000 | 12 | 6 | 6 | 6 |
3.2.4.8 Industrial Buildings – height up to 15-meters
| Plot Area (sqm) | Setback (meter) | |||
| Front | Rear | Side-1 | Side-2 | |
| Up to 150 | 3 | 0 | 0 | 0 |
| >150 -300 | 3 | 3 | 0 | 0 |
| >300 - 500 | 4.5 | 3 | 3 | 0 |
| >500 - 2000 | 6 | 3 | 3 | 3 |
| >2000 - 6000 | 7.5 | 6 | 4.5 | 4.5 |
| >6000 | 9 | 6 | 6 | 6 |
For use occupancies with building height more than 15m (other than single/multi units), the minimum setback requirement shall be as follows.
| Building Height (in meters) | Front (m) | Rear (m) | Side-1 (m) | Side-2 (m) |
|---|---|---|---|---|
| >15 - 17.5 | 5 | 5 | 5 | 5 |
| >17.5 - 21 | 6 | 6 | 6 | 6 |
| >21 - 27 | 7 | 7 | 7 | 7 |
| >27 - 33 | 8 | 8 | 8 | 8 |
| >33 - 39 | 9 | 9 | 9 | 9 |
| >39 - 45 | 10 | 10 | 10 | 10 |
| >45 - 51 | 11 | 11 | 11 | 11 |
| >51 | 15 | 12 | 12 | 12 |
Note-1: For buildings situated on two or more roads of different road widths, then the side of the building towards the wider road shall be considered as the front.
Note-2: In alternative to the above-mentioned table of paragraph 3.2.4.9, following setbacks shall be allowed.
a. Up to height of 33m, with one setback on the subsequent floors, the minimum setback on all fours sides on ground floor shall be 6m.
b. For building height between 33m to 45m, with one setback on subsequent floors, the minimum setback on all four sides on ground floor shall be 8m.
c. For building height more than 45m to 51m, with two setbacks on subsequent floors, the minimum setback on all four sides on ground floor shall be 10m.
d. The shortfall of setbacks mentioned in the table of paragraph 3.2.4.9 shall be compensated by the setback provided on the subsequent floors.
Note-3: The margin between two blocks shall be the required setback based on the height of the higher block or 6m whichever is higher. Here 'Block' means a building structure which is divided into different rooms, flats / apartments or offices are in continuity, wherein the block length shall be a maximum of 100 meter and shall also cover total length of built structures joined through expansion joint.
Note-4: In plots comprising of building block of varying heights, the setbacks to be left along the edges of the plots shall be based on the height of the higher building block along that edge.
Following relaxations in the setbacks are provided.
(i) In residential buildings, terrace / balcony of maximum width up to 2.0 meters can be constructed in the setback open space, which shall not be more than the half of the width of the setback open space, which shall not be counted in the FAR. Above mentioned terrace / balcony shall be permissible to a maximum extent of 10% of the area of the entire open space. No construction of any kind shall be allowed on the mentioned terrace / balcony.
(ii) Construction of maximum 6m length and 3m wide portico either projected or supported on pillars shall be permitted on the driveway near the entrance in the setback area. No construction shall be allowed above the portion covered by the Portico.
(iii) Pergola of maximum 6 sqm area and height 2.3m, with the minimum open space area of 40% shall be permitted.
(iv) In case of island plot, the front of the plot will be the side abutting the widest approach road. The setbacks shall be as applicable for normal plot. Entrance for such plot shall be allowed through widest approach road as defined above.
(v) In special circumstances, the side set-back of a corner plot may be relaxed by the Authority Board.
(vi) Fire escape shall be permissible in the set-back area provided the fire prevention norms are adhered to.
(vii) Construction of ramp in slope is allowed for basements and podium in setbacks provided that unhindered movement of fire tender is not blocked.