The general principles for sustainability in buildings shall be in accordance with Part 11- ‘Approach to Sustainability’ of NBC 2016.
13.1 Water Conservation
13.1.1 Water management during construction
Water from authorized sources shall be used for construction. Where ground water is used for construction, permission from the concerned ground water authority shall be taken. Less water intensive construction methods may be employed using prefabricated members, pre-mix concrete, curing agents, etc.
On construction sites, potable water shall be used only for drinking, human activities and concrete works. Use of potable water for any other construction activity may not be allowed. Treated wastewater from appropriate sources should be used in such construction activities after complying with all the required parameters for water use.
13.1.2 Rainwater Harvesting
Rainwater harvesting shall be achieved by adopting the techniques given below:
a) storage of rainwater on surface for future use; and
b) recharge to ground water
All public open spaces and recreational area shall make provisions for rainwater harvesting.
Requirements of Layout/Sub-division Plan for Development Permission
(a) Before making a new plan, geological /hydrological /hydrogeological survey of the area should be conducted and appropriate method should be adopted as per local requirement for recharging of ground water.
(b) In the layout plans of schemes having an area of more than 10 acres (>4 hectares), reservoir(s) shall be constructed at suitable places within the land proposed for parks and open areas, wherein such area shall be a minimum 01 percent of total scheme area. Prior to building such reservoir(s) in such scheme, while identifying natural rainwater catchment areas, the size and depth of such reservoir shall be determined, after study/assessment of envisaged volume of rainwater, hydrogeological, topography, lithology, soil properties of the area, possible retention and ‘stagnation’ of rainwater in the proposed reservoir and the feasibility thereof. However, the maximum depth of the reservoir should be kept at 02 meters. Apart from this, arrangements should be made to dispose only the ‘surface-run-off’ of that scheme in the reservoir; polluted water and effluent should not be mixed in it. Recharge pit/recharge shaft should be made in one corner of the park and open area as per the prescribed standards. Such recharge pits/recharge shafts and reservoirs should be constructed in the direction of the slope in accordance with the regional hydrogeology.
(c) Concrete construction in parks should not be more than 5 percent, including concrete pavement and footpaths and tracks, and should be made using ‘permeable’ or semi-permeable perforated blocks as much as possible. Maximum underground seepage of rainwater should be encouraged in parks and open areas.
(d) Such trees and plants shall be planted on roads, parks and open spaces which require minimum water and which can absorb less water and remain green even in summer.
(e) In the layout plans of new schemes, in addition to infrastructure facilities like water supply, drainage and sewerage network, other separate networks shall be provided for collective recharge of ground water through roof-top rainwater harvesting with an arrangement for recharging pits for individual plots/ buildings and recharging structures at other suitable places.
(f) In the layout plans of new schemes, for plots of areas from 100-300 square meters, it shall not be mandatory to establish rainwater harvesting system in individual buildings if the rainwater from group of buildings flows into the network of the collective recharge of the scheme. However, in relation to buildings constructed on plots of area more than 300 square meters, then it shall be mandatory for the building owner to install rainwater harvesting system himself.
Requirements of Building Plan submitted along with application for permission.
In case of no collective recharge network, roof top rainwater harvesting system in plots of all uses of 300 square meters and more area (including group housing) except waterlogged areas. Construction of rainwater harvesting structures shall be ensured as per standard technology and rainwater shall be allowed to penetrate the soil to the minimum required depth so that the problem of pollution of ground water sources does not arise. Ground water recharging system should not be adopted in areas with water logging problem, but arrangements can be made to collect rainwater received from the roofs of buildings.
Environmental Conditions required for buildings (amended from time to time):
| Built-up area | Requirements |
| Category-A (5000-20000 sqm) | • A rainwater harvesting plan needs to be designed where the recharge bores (minimum one per 5000 sqm of built-up area) shall be provided. The rainwater harvested should be stored in a tank for reuse in household through a provision of separate water tank and pipeline to avoid mixing with potable municipal water supply. The excess rainwater harvested be linked to the tube well bore in the premise through a pipeline after filtration in the installed filters. • The unpaved area shall be more than or equal to 20% of the recreational open spaces. |
| Category-B (20000 -50000 sqm) | |
| Category-C (50000-150000 sqm) | |
| Additional Conditions Category-C (50000-150000 sqm) | • The ground water shall not be withdrawn without approval from the competent authority. • Use of potable water in construction should be minimized. • Low flow fixtures and sensors must be used to promote water conservation. • Separation of grey and black water should be done by the use of dual plumbing system. |