16.1 Introduction
The public participation process and stakeholder consultation for DP 2035 SUDA has been conducted. The level of participation and involvement of different stake holders has been detailed in this chapter. Different discussions and various meeting were held to understand the view and opinion of stakeholders for revision of development plan.
The stakeholders' participation included experts' consultation, in which the stakeholders were involved through focus group discussions to review and assess the existing situation and needs for the future. These experts were invited to join various sub committees formed by SUDA. The consultation was more participatory and collaborative. As series of working group meetings were held and stakeholders were involved in making more specific suggestions for improving the existing conditions.
16.2 Stakeholders Consultation Process
The aim of conducting consultations is to articulate stakeholder expectations so as to be able to formulate a vision for the revised development plan, prioritize city development issues, strategy / action consensus and choice of strategy options. The methodology for consultation included following sequential tasks:
-
Identification of stakeholders
-
Conducting consultations
-
Documentation of consultations
-
Integrating consultation findings into project related decision-making
16.3 Stakeholder Groups
Various stakeholder groups were identified during the consultation program to represent views of a wide cross-section of society. Two core groups of stakeholders were identified:
16.3.1 Primary Stakeholders
Beneficiaries of a development intervention or those directly affected (positively or negatively) by it. The following stakeholder groups were included:
• Village Sarpanchs (95 villages)
• Institutes such as Chamber of Commerce, South Gujarat
• Institute of Architecture and Civil engineering etc.
• Non-Government Organizations
• Renowned Architects, Engineers and Town Planners
• Private Developers
• Subject Professors
Consultations with Village Sarpanch: Meeting was held with the village Sarpanchs, of all 95 villages from 4 talukas included in area of SUDA. Their suggestions were invited for over
SURAT URBAN DEVELOPMENT AUTHORITY |
Page
- 2023年1月1日
2017
development of SUDA area. Particular requirement of Sarpanch was invited through written applications at the authority office and were considered during planning.
Consultations with Institutions: Representatives of the following institutions were consulted to get their views on urban services and infrastructure situation, economic development, housing requirement, Transportation and other component of Development plan.
• Chamber of Commerce
• Indian Institute of Architects
• Gujarat institute of Civil Engineering and Architecture
• Members from GIDC estate.
• SVNIT
16.3.2 Secondary Stakeholders
Consultations with Committees
Following committees were formed that included internal as well as external members from all fields, to focus on key areas. Consultation meetings with the committees were held at regular intervals. Some of the committees were consulted and series of meetings were held to find out the issues and probable solutions for the same. The committees formed are listed below:
Core Committee
• SC-1: Basemap Preparation
• SC-2 : Demographical Projection and data collection
• SC-3 : Simplification of GDCR
• SC-4 : Affordable Housing and Socio economic studies
• SC-5 : Traffic and Transportation proposals
• SC-6 : Infrastructure Planning & ORR Implications
• SC-7 : Tapi River Alignment, CRZ Environmental Regulations
• SC-8 : Industry Trade & Commerce
Approximately 60 meetings were held in totality for over development plan preparation. The suggestions received from the stakeholders are listed below:
Consultation with MPs and MLAs
All MP, MLA, Surat Zilla Panchayat President and Mayor (SMC) were invited on 22.04.2016 for detailed discussion on Development Plan 2035. Discussion on various issues were carried out and their suggestions on the same were invited.
SURAT URBAN DEVELOPMENT AUTHORITY |
Page
|166
C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C
2017
| Zoning | Road | Reservation | GDCR | SUDA Extension | Others | Total | |
|---|---|---|---|---|---|---|---|
| Suggestions Received | 42 | 39 | 23 | 16 | 7 | 9 | 136 |
16.4 Stakeholders Suggestions
16.4.1 SC4 : Housing and Socio Economic Studies
Katargam + Varachha and Udhna + Limbayat zones can be considered for proposing Affordable Housing
➢ Residential Housing for workers should be made compulsory for industrial development in GDCR
The provision of affordable housing at present is based more on land availability. It should be well distributed in areas as per necessity rather than availability
➢ Need for Housing projects with public-private partnerships or Regulatory Policy. SMC can introduce various Housing Schemes with Private partnership so as to provide innovative options for all masses. This may include implementation of Policy measures such as to make mandatory for builders to provide 10 % of EWS houses in all housing schemes introduced into the city
➢ Encourage New Township development
16.4.2 SC5: Traffic and Transport
➢ Public Transport should be the main vision for development plan and land use should be proposed in accordance and integration along the public transport
The following hierarchy was suggested
• LRT/MRT along ORR
• BRTS along radials
• City Bus as feeders on through roads
• Auto as feeders on through roads
➢ Metro should be proposed on the 66 km long Outer Ring Road but it should suffice to future expansion of authority area hence a radial should also be proposed along the NE-SW radial. Canal Road can be the radial along which metro can be proposed
A multimodal transport hub to be proposed on outer ring road and Kadodara road intersection which will serve as a central place of connectivity where multiple forms of transit
To develop a logistics park between expressway and national highway on the Palsana road
Roads to be developed along all existing canals
SURAT URBAN DEVELOPMENT AUTHORITY |
Page
16.4.3 SC 6: Infrastructure & Outer Ring Road Implication
1. Water Supply
There is an underprovision of water supply network in the part of the developing areas of Kamrej, Palsana, Vav, Navagam, Kholvad, Sachin, Talangpore, Vanz, Ichhapore, Bhatha etc. These areas to be divided into clusters and provision of infrastructure on priority basis for these area
Due to high rainfall water should be compulsorily recharged
7% of the municipal corporation is yet to be provided with network for water supply. By 2015, 100% coverage in SMC area shall be done. Out of 95 only 25 villages are provided with GWSSB water remaining 70 villages do not have conventional water supply network. To increase network and supply to save ground water depletion