4.2.1 Development Plan
After the constitution of SUDA in 1978, the first development Plan; as per the provisions of the Gujarat Town Planning and Urban Development Act, 1976 was sanctioned by the State Government in 1986 which came into force from 3rd March, 1986. As per the provisions of section 21 of the Act, the development plan is to be revised once in 10 years. SUDA started the process of revision of this principal development plan and accordingly published the draft of the first development plan in 1996 within 10 years. The draft development plan was ultimately sanctioned by the State Government in 2004 which came into force form 15th September, 2004. This is the DP which is under implementation and refereed as DP -2004 hence onward.
The proposals of DP-2004, was based on the following broad principles.
-
To minimize the spread of urbanization in agriculturally rich fertile irrigated area and to utilize the maximum khar land for future urbanization.
-
Urban growth along the main corridors.
-
Identify new development areas to ease the pressure on Surat city.
-
Better environmental living condition by maximum utilization of existing infrastructure.
The main objective of the DP-2004 was to achieve efficient functioning by restructuring the city, by means of conservation, redevelopment or new development with long term perspective to guide future development. One of the important considerations while formulating the DP-2004 proposals was to protect the best of existing character of Surat and to develop its structure and suggest appropriate measures to overcome remedies obstructing the healthy growth of city. The DP-2004 had identified following 9 objectives that focused on various aspects of creating good living environment, providing effective infrastructure, augmentation of financial resources, coordination of various developmental activities, etc.
SURAT URBAN DEVELOPMENT AUTHORITY |
Page
-
To create definite urban form.
-
To establish supportive transport network with regards to existing city and regional network with which effective mass-transportation system can be developed.
-
To develop residential (hub) nodes with self-sufficient infrastructure and amenities to ease the pressure on the main city.
-
To aim for evolving poly-nucleated structure for the area as against the present mono centre structure keeping in view development in urban fringe area.
-
To identify and suggest possible water resources and indicate possible drainage disposal system for over all urban area.
-
To take into consideration the impact of the heavy industrial growth in HADA area, increasing port activities, development activity like O.N.G.C., KRIBHCO, etc. in Ichchhapore and to identify the activities in the vicinity of these planned area.
-
To develop environmental balanced planning with provision of open spaces, recreational areas, amusements parks catering to the regional needs as a whole.
-
To identify and suggest preservation of historical monuments and architectural heritage.
-
To regulate and control the development in the planned manner.
Considering need for economical use of urban land, the overall density of 240 PPH was envisaged for future development of SMC area and 80 PPH for SUDA area excluding SMC area. Approximately 187 sq.km. area from SUDA limit along with 112.28 sq.km. of SMC area totalling approximately 300 sq.km. area was proposed for future urbanization for the projected population of 2011 in the DP – 2004. The proposed urbanization area of SUDA was broadly divided in Residential, Commercial, Industrial, Educational and Recreational zones.
In the past decade, significant work has been done towards achieving these aims and objectives. Below is an assessment of the work and the projects that have taken place since 2004.
4.2.2 Growth and Distribution of Population in Urban and Rural
Area for 2011
During preparation of the proposal for the DP in 1996, the official census data of 1991 was considered according to which the population of whole SUDA area was only 18 lakhss. All the projections and proposals were made on the basis of census data of 1971, 1981 and 1991. After the epidemic plague in 1994, major initiatives for development were taken in SMC area and employment opportunities were generated leading to population explosion particularly in the municipal corporation area. The projected population fell short of the actual population as per 2001 census for both the areas of SMC as well as the area of SUDA excluding SMC. The census of 2001 recorded the population of SUDA at more than 31 lakhss although in the DP -2004 had projected only 27.50 lakhss. In the subsequent decade, the population of SMC increased dramatically. The total population of SUDA as projected in DP-2004 for 2011 was only 42 lakhss and actual as per census 2011, it is about 6 lakhss more than what was projected. Thus, the population projections in the sanctioned DP of 2004 fall short of the actual population growth in the last two decades.
Page |24
|25
DEVELOPMENT PLAN 2035
2017
| Year | As Projected In RDP 2004 (Pop. in lakhss) | As Per Census (Pop. in lakhss) |
|---|---|---|
| 1961 | - | 3.55 |
| 1971 | - | 5.58 |
| 1981 | - | 11.20 |
| 1991 | - | 17.80 |
| 2001 | 27.50 | 31.05 |
| 2011 | 42.00 | 48.05 |
4.2.3 Development of Green Spaces, Open Spaces and Places of
Public Activities and Recreation
| Sr. No. | Zone | Gardens (A) | Shantikunj/ Shantivan(B) | Area (ha) |
| 1 | Central | 12 | 1 | 4.11 |
| 2 | West | 24 | 6 | 31.43 |
| 3 | Southwest | 18 | 2 | 18.34 |
| 4 | South | 10 | 5 | 14.04 |
| 5 | Southeast | 4 | 6 | 0.54 |
| 6 | East | 8 | 6 | 11.33 |
| 7 | North | 14 | 3 | 10.55 |
| Sub Total | 90 | 29 | ||
| SMC Total | (A+B)=119 | 90.36 | ||
| SUDA | 40 | 21.24 | ||
| Total | 159 | 111.60 | ||
Total Parks and gardens in SUDA region area 159 out of which 119 are developed in SMC area and remaining are the existing gardens in area outside SMC within SUDA limits.
4.2.4 Public Participation for Comprehensive Development of
Urbanisable Area
As per the provisions of the Act, the Development Plan proposals are implemented through the mechanism of Town Planning Schemes where public participation is extensively involved at each and every stage of planning. As per the Sanctioned Development Plan-2004 the total Urban area proposed i.e. 365.11 sq.km. was comprised of different land uses such as Residential, Commercial, Industrial and recreational uses. Town Planning schemes were prepared for these zones.
Page
Before the extension of SMC boundary in 2006, SUDA had prepared 45 TP Schemes, then all these planned area were merged in the SMC limit and now SMC is implementing these schemes. The details of area under TP scheme and percentage of urban area developed are shown in the Table below. Under the Development Plan -2004, total 129 TP schemes were prepared for the area under SMC and a total of 23 TP schemes were prepared for area under SUDA.
| Authority Area | Total Area (sq.km.) | Total Urban Area Proposed | No of TP Scheme | Area Under TPs (sq.km.) | Implementation (%) |
|---|---|---|---|---|---|
| SMC | 326.51 | 239.80 | 129 | 179 | 75 |
| SUDA (Outside SMC) | 388.64 | 125.31 | 23 | 48 | 39 |
| Total SUDA | 715.12 | 365.11 | 152 | 227 | 62.1 |
4.2.5 Effective Transportation Network
With a view to have efficient transportation system as well as to avoid the congestion at important road junctions various new roads, bridges, flyovers, underpasses in SUDA were proposed in the Development Plan - 2004. Surat is known as city of flyovers. The implementation status is shown in the following table no. 12.
| Sr.No. | Criteria | Status | SMC | SUDA(Excluding SMC) | SUDA Total |
| 1 | Bridges | Proposed in DP 2004 | 3 | 3 | |
| Implemented | 2 constructed1 under construction23 creek bridges constructed | 2 constructed1 under construction23 creek bridges constructed | |||
| 2 | R.O.B | Proposed in DP 2004 | 2 | 1 | 3 |
| Implemented | 3 | - | 3 | ||
| 3 | Flyovers | Proposed in DP 2004 | Not proposed | ||
| Implemented | 11 flyovers2 BRTS flyovers6 BRTS Flyovers under progress | 1 flyover at Sachin | 14 flyovers6 under progress | ||
-
2017
4.2.6 90 M Wide Outer Ring Road
As discussed earlier, the Development Plan which is in force as of now was based on the census data of 1991 and population projected for 2011 was only 42 lakhss which has now reached to about 50 lakhss as per 2011 census. In this revised Development Plan -2004, the ring road was not envisaged when it was sent to the State Government for sanction in 1996.
The increasing population has generated lot of industrial, commercial, recreational educational and other activities. The demand for residential areas has also increased to cater to the fast growing population. Considering the traffic and transportation need of the rapidly growing Surat city the need for the comprehensive and integrated approach toward traffic and transportation planning was strongly felt. Keeping the future expansion of the fast growing city of Gujarat in mind, SUDA planned, a 90 m wide 66-km long outer ring road on the periphery of the city. This road will provide easy access to all parts of the mega city and also in the future to the twin city of Surat and Navsari. The land use along this outer ring road is conceptualized so that the city gives the look of the mega city with sky line giving competition to the developed cities of India as well as the world.
Out of the 66 Km length of this road, 29 km is proposed in the SMC area while rest of the 37 km passes through 27 villages of the SUDA area. The alignment of 90 m wide outer ring broad is proposed in such a manner that about 37 km is proposed on the existing National Highway (20 km) and State Highway (17 km) which are in fact part of the 60m wide road proposed in revised Development Plan. The rest of the 29 km north – south stretch on the eastern side of SUDA area is proposed as new alignment in the Agricultural Zone. SUDA decided to develop the 29 km of the proposed 90 m wide outer ring road which is passing through the agricultural zone in the First phase so that the ring can be completed with the 37 km of the existing portion of the NH and SH by means of preparing 11 TP Schemes. For preparing the TP Schemes, 500 m on both the sides of the ring road alignment is converted to the special residential zone so that the TP schemes can be prepared as per the provisions of the Act, 1976. The draft TP Schemes have been prepared and submitted to Govt for sanction. The eight draft schemes of SUDA and draft schemes of SMC were sanctioned by the State Government in March, 2016.
SUDA decided to get the possession of road by virtue of TP schemes and for developing the world class infrastructure, major portion of the finance to be generated by charging the developer 40 percent of the prevailing Jantri rate for the F.S.I. to be used more than 0.6 and up to 4. Some finance could also be generated by selling the plots allotted to the appropriate authority for the purpose of sale and also by the way of incremental contribution.
4.2.7 Reservation Developed
After the DP -2004 came into force, as per the provision of section 19 of the Act, variations in this sanctioned development plan proposals were made at different point of time in the public interest by the State Government as indicated in the list below:
Page |27
Page
2017
| Total no of Reservations | No. | 285 |
|---|---|---|
| Area | 59.82 sq.km. | |
| Reserved for SMC | No. | 208 |
| Area | 17.04 sq.km. | |
| Reserved for SUDA | No. | 24 |
| Area | 9.66 sq.km. | |
| Reserved for Others | No. | 53 |
| Area | 33.22 sq.km. | |
| No. of reservations Acquired | No. | 99 |
| Area | 15.35 sq.km. | |
| Deleted Reservations u/s 19 | No. | 13 |
| Area | 0.66 sq.km. | |
| No. of Reservations Still Existing | No. | 173 |
| Area | 43.91 sq.km. |
Total 285 number of reservations were proposed in DP 2004. Out of these 285, 13 reservations with an area of 0.66 sq.km. were deleted.