11.2.1 Water Supply Current Scenario
Water Supply is one of the primary infrastructure services a city needs. The sources of water supply for the entire SUDA region are surface water and ground water. Tapi is a major source of Surface Water. Surface water is drawn by intake wells from perennial channel throughout the year. Ground water is drawn via bores. The entire water supply process takes place through various steps and water is received through the source in the treatment plant where it is treated. The treated water is stored in the storage reservoirs and then supplied to the city areas. The following sections describe how the water supply system in the city has developed from past to present.
The situation with regard to water supply in Surat Municipal Corporation has been analyzed in terms of "Source Sustainability", apart from "Service Levels", "Service Coverage" and "Service Efficiency". These indicators are analyzed for assessing the existing service levels, coverage and efficiency.
11.2.1.1 Evolution of Water Supply
The water supply system for Surat city evolved over a period of more than hundred years.
| Year | Event |
|---|---|
| 23 April 1852 | Surat municipality was established but there was no provision of public water supply at that time |
| 1864 | Sir Kawasji Jahangir of Surat had donated Rs.1.25 Lacs to construct a water works for the city |
Page | 97
| Year | Event |
|---|---|
| 1867 | Mr. Gragery prepared a plan to draw water from river Tapi near Kamrej and bring the same up to Delhi Gate by a pipeline |
| 1894 | Fardunji Taraporewala was appointed as an Executive Engineer in Surat by the British Government, who planned to build Infiltration wells in the river. In the same year, work for first water supply pipeline was started near Surat railway station by Mr. George Harrison, then Governor of Mumbai |
| 1898 | Varachha Water Works was inaugurated. It was then known as Lely Water Works in the name of Mr.Lely, then Collector of Surat. Rander municipal area also got water from this plant as Sheth Haji Yusuf from Rander shared one tenth of the expenditure. |
| 1931 | chlorination was used in Surat city water supply for the first time |
| 1950 | New Engine House & new overhead tank were started |
| 1952 | First surface water treatment plant was commissioned at Varachha |
| 1984 | 20 new tube wells were constructed at Varachha & Sarthana to increase the water supply capacity |
| 1985 | Radial collecting wells (2 No.) were constructed at Sarthana and water distribution stations were constructed at Khatodara, Umarwada & Katargam |
| 1995 | gross average daily water supply was 180 MLD to a population of about 18 Lacs resulting in an acute shortage of water supply |
| 1995 | A weir-cum-causeway was constructed across river Tapi. Due to the construction of weir, a reservoir of about 31000 TCM (Thousand Cubic Meter) capacity became available for drawing surface water. |
Source: Water Supply Master Plan 2041, SMC
| Year | Event |
|---|---|
| 1997 | New water works for the city was commissioned at Katargam |
| 1997 | 120 MLD capacity water treatment plant was commissioned and increased to total 240 MLD in 1999. Raw water at this water treatment plant was fed by the intake well constructed in the river Tapi. |
| 2001 | 240 MLD capacity raw water Intake Well & 120 MLD capacity Water Treatment Plant were commissioned at Sarthana Water Works |
| 2003 | 200 MLD capacity Water Treatment Plant & 360 MLD capacity raw water Intake Well were commissioned at Rander Water Works |
| 2006 | City limit was extended from 112.27 sq.km. to 326.51 sq.km. area, merging 27 Grampanchayats & 8 Nagarpalikas into city. |
| 2007 | 200 MLD capacity fully automatic water treatment plant with SCADA was commissioned at Sarthana Water Works |
| 2009 | two fully automatic water treatment plants with SCADA of 150 MLD capacity each were commissioned and inaugurated by Honorable Chief Minister of Gujarat, Shri Narendrabhai Modi at Katargam & Sarthana Water Works |
| 2011 | 50 MLD water treatment plant was commissioned at Rander water works under |
2017
| Year | Event |
|---|---|
| JnNURM | |
| 2012 | Water Supply Scheme (part) for Amroli, Kosad, Chhaprabhatha area of New North Zone of Surat was commissioned and inaugurated by Honorable Chief Minister of Gujarat, Shri Narendrabhai Modi |
| 2012 | 360 MLD Intake well at Sarthana water works and 263 MLD Intake well at Katargam water works commissioned |
| 2013 | 90 MLD capacity fully automatic water treatment plant with SCADA was commissioned at Kosad Water Works |
| 2013 | 3 Nos. of UGSR of total 245 Lacs Liters capacity with booster house for water supply scheme for Puna-Simada area of Surat under “Swarnim Jayanti Mukhya Mantri Shaheri Vikas Yojna” |
Source: Water Supply Master Plan 2041, SMC
11.2.1.2 Current Service Level(year 2014)
Presently, there is an availability of 1463 MLD of surface water from different sources for SMC area against the total treatment capacity of 1268 MLD. Water from all these sources is taken to treatment plants supplying water to the SMC region. SMC has developed well established, networked water supply system to supply the drinking water to the Citizens of Surat City. Present gross average daily water supply to the citizens of Surat City is 980 MLD with net per capita water supply of 150 Liters per day. Present water supply components like water works, booster house and water distribution stations are connected with water supply GRID network which helps to address water quantity and quality issues. Present population coverage of Surat city (including the extended city limit area in year 2006) is about 93% and it is planned to achieve the target of 100% population coverage by the end of year 2014.
| No | Surface Water Source | Intake WellInstalled capacity (MLD) | Water Treatment Plant Installed capacity (MLD) | Percentage Treatment plant installed from intake |
|---|---|---|---|---|
| 1 | Sarthana Water Works | 600 | 470 | 78.33 |
| 2 | Varachha Water Works | 0 | 68 | |
| 3 | Katargam Water Works | 503 | 390 | 77.53 |
| 4 | Rander Water Works | 360 | 250 | 69.44 |
| 5 | Kosad Water Works | 0 | 90 | |
| Total | 1463 | 1268 | 86.67 |
Source: Water Supply Master Plan 2041, SMC
Other than these, the villages in the SUDA area receive water through GWSSB from Tapi river and private bore wells. GWSSB supplies to only 14 villages about 1.6 MLD of water the rest of the villages are dependent on private bores and there are about 223 bores in these villages.
SURAT URBAN DEVELOPMENT AUTHORITY |
Page
| No. | Village | Water Supply ( Litres) |
|---|---|---|
| 1 | Ambetha | 139991 |
| 2 |