From: The Chief Executive Officer, State Industrial Development Authority (SIDA) Dehradun, Uttarakhand.
With reference to your application no……………dated…………for grant of permit for the erection / re-erection / material alteration / demolition in / of building on Plot No……….in Estate… ….in Sector .I have to inform you that the sanction has been granted / refused by the SIDA on the following conditions for the following-
Signature …
Name of the Officer:
Designation: …..
Date: …
Office Stamp: …
Comprehensive Document Checklist
Consent to Operate / Occupancy-cum-Completion Process
The following set of documents is to be attached during online application for CTO process along with online payment.
i) Soft copies of Architectural drawings in Pre DCR format (Site Plan, section, Elevation and Building Plan in one file)
ii) Online payment of completion fees through payment gateway
iii) Valid time extension certificate, if applicable
iv) Photographs of the building from front, Rear and side setbacks
v) Scanned copy of registration Membership certificate of technical person
vi) NOC from Chief Fire Officer, wherever applicable
vii) NOC from Explosive Department, wherever applicable
viii) NOC from Pollution Department, wherever applicable
ix) NOC from Other Department, wherever applicable
x) Download Appendix 7 / 8 / 10 for completion Certificate from owner, Engineer / Architect
xi) Download Appendix 9 for Completion Certificate to be issued by Third Party Empanelled Architect, accredited in the online system
xii) Scanned Copy of receipt of fees deposited for Power Connection
xiii) Scanned Copy of receipt of payment of water / sewer connection charges, Meter charges if not submitted at the time of plan approval