a. For reducing consumption of total energy, fresh potable water and reduction in total waste generation by modern buildings, the green building measures are to be adopted by all building on various plot sizes.
b. The applicant shall be awarded benefits of additional Floor Area Ratio (on plot area) by getting his building / site / project certified from Green Rating for Integrated Habitat Assessment (GRIHA) / Leadership in Energy & Environmental Design (LEED) / Indian Green Building Council (IGBC) / Bureau of Energy Efficiency (BEE) or the Architects empanelled by these institutions to examine and certify green buildings.
9.1 Rain Water Harvesting
(i) Except areas affected by high-water table problems, all areas under different land-use having plot area more than 100 sq. mt. in which construction works is admissible, rain water harvesting / collection provisions shall be mandatory.
(ii) The standard for rain water collection:
| S. No. | Total Built-Up Areaof Buildings | Rain Water Harvesting Collection Norms |
|---|---|---|
| 1 | upto 250 sq. mt. | minimum 2.0 cubic mt. |
| 2 | more than 250 sq. mt. and upto 400 sq. mt. | minimum 3.5 cubic mt. |
| 3 | more than 400 sq. mt. | for every increase in 50 sq. mt. plot area or partial area thereof, additional provision of minimum 0.5 cubic mt. |
Table 15: Standards for rain water collection
(iii) For the effective implementation of rain water harvesting, the building plan shall be sanctioned only if appropriate provisions are made in the plan and the occupancy certificate shall be issued after the onsite verification of the same.
(iv) All the construction work related to rain water harvesting shall not be calculated in the F.A.R.
(v) The detailed proposal of the system comprising collection, conveyance and dispersion of rainwater harvesting well / tube well shall have to be shown on the building plan submitted for approval.
(vi) An Architect / Engineer duly engaged for supervision and execution of the construction of the building shall submit the certificate stating that the rain water harvesting system is functional at site and same conforms to the provisions of these byelaws.
(vii) However, if the Architect / Engineer found guilty of misrepresentation of the facts, penal proceedings shall be initiated along with debarring the concerned Architect / Engineer from practicing in the State of Uttarakhand
9.2 Ground Water Recharge:
(i) Recharging of ground water shall be mandatory not only for residential buildings but for all types of buildings, including Group Housing Societies having a plot area more than 500 sq. mt. and above.
(ii) The Ground Water Recharge shall be mandatory for open spaces like parks, parking, plazas, playgrounds and other common areas.
(iii) The recharge well shall be located at a distance of not less than 10 mt. away from any structure handling sewage or industrial waste water (such as septic tank or effluent treatment plant etc.). This minimum distance of 10 mt. shall not be applicable to manholes or sewer lines although it shall be ensured that they are leak proof.
9.3 Provision of Rooftop Solar Photo Voltaic Power Plant
(i) No new building in the following categories in which there is a system of installation for supplying hot water shall be built unless the system of the installation is also having an auxiliary solar assisted water heating system:
a. Hospitals and Nursing Home.
b. Hotels, Lodges, Guest Houses
c. Group Housing with a plot area of 2000 sq. mt.
d. Hostels of Schools, Colleges and Training centers with more than 100 Students.
e. Barracks of armed forces, paramilitary forces and police.
f. Individual residential buildings having more than 150 sq. mt. plinth area.
g. Functional Buildings of Railway Stations and Air Ports like waiting rooms, retiring rooms, rest rooms, inspection bungalows and catering units.
h. Community centers, Banquet Halls, Baarat Ghars, and Buildings for similar use.
(ii) Definitions
| S. No. | Term | Definition |
|---|---|---|
| 1 | "Solar Assisted Water HeatingSystem" | A device to heat water using solar energy as heat source |
| 2 | "Auxiliary back-up" | Electricity operated or fuel firedboilers / systems to heat water coming out from solar water heating system to meet continuous requirement of hot water |
| 3 | "New Building" | Such buildings of above said categories for which construction plans have been submitted to the Authority for clearance |
| 4 | "Existing building" | Such buildings, which are approved to perform their respective business |
(iii) Installation of Solar Water Heating System
a. New Buildings: Clearance of plan for the construction of new buildings of the aforesaid categories shall only be given if they have a provision in the building design itself for an insulated pipeline from the rooftop in the building to various distribution points where hot water is required. The building must have a provision for continuous water supply to the solar water heating system. The building should also have open space on the rooftop, which receives direct sun light. The load bearing capacity of the roof should at least be 50 kg. per sq. mt. All new buildings of above said categories must complete installation of solar water heating systems before obtaining necessary license to commence their business.
b. Existing Buildings: Installation of Solar Assisted Water Heating Systems in the existing building shall be made mandatory at the time of change of use to above said category provided there is a system or installation for supplying hot water.
(iv) Capacity: The capacity of solar water heating system to be installed on the building of different categories shall be decided in consultation with the local bodies. The recommended minimum capacity shall not be less than 25 liters per day for each bathroom and kitchen subject to the condition that maximum of 50% of the total roof area is provided with the system.
9.4 Sustainable Waste Management
(i) Zero Waste is a concept of waste management and planning approaches that emphasize waste prevention as opposed to end waste management.
(ii) Zero Waste / land-fill can be achieved by adopting systematic approach of segregation at source by planning, by collection facilitation and most importantly by creating public awareness.
(iii) The green waste can be converted into fuel cakes, kitchen waste into manure, construction & demolition waste into bricks, plastic waste into oil, paper, glass and steel back into the same and all residual inert materials can also be converted into bricks. Achieving zero land-fill is more conveniently possible, if
a. The collection is made from house to house and some segregation is done at household level and
b. Separate wet and dry bins must be provided at the ground level.
c. The recycling is done at decentralized, say, ward or even lower levels.
9.5 Provisions for Green Rating systems
(i) All Government / State Government / Semi-Government buildings including those belonging to autonomous bodies like boards, corporations, public sector undertakings shall confirm to minimum 4-star GRIHA rating OR GOLD IGBC LEED to propagate green building construction. The concerned Architect shall submit affidavit for the implementation of the above provision.
(ii) Other buildings which comply to rating systems and which successfully secure ratings from GRIHA / LEED / IGBC / BEE shall be eligible to receive extra F.A.R free of cost as stipulated below:
| S. No. | Rating | F.A.R | |
| IGBC | GRIHA | ||
| 1 | Silver | 3 star | 0.1 |
| 2 | Gold | 4 star | 0.2 |
| 3 | Platinum | 5 star | 0.3 |
Table29: Eligibility for extra FAR based on Green Ratings Systems
(iii) The applicant has to submit a rating certificate for the proposed green building issued by GRIHA / LEED / IGBC / BEE or the architects empanelled with them at the time of submission of the
plans for availing free F.A.R. At the time of submission of completion notice, the concerned Architect shall submit affidavit regarding the compliance and the rating of building, failing which the Authority shall give notice of three months and after that may charge compounding fee for the extra FAR which shall be twice the cost of the purchasableFAR.
(iv) The certificate of compliance is to be submitted after every five years failing to which the Authority shall give notice of three months and after that may charge compounding fee for the extra FAR which shall be twice the cost of the purchasable FAR.
(v) Procedure for availing incentive:
a. The applicant is required to submit provisional rating from GRIHA / LEED / IGBC / BEE or the architects empanelled with them at the time of submission of building plan application to the Competent Authority for claiming incentive of additional FAR stated at Clause- 10.5 (2).
b. At the time of applying for Occupancy Certificate of building, the applicant is required to submit final rating from GRIHA / LEED / IGBC / BEE or the architects empanelled with them.
9.6 Energy conservation
(i) ECBC shall be applicable to building complexes as follows:
a. Buildings having conditioned area more than 500 sq. mt.
b. All commercial and non-residential buildings whose built-up area is more than 2000 sq. mt. or plot area more than 1000 sq. mt.
c. Buildings such as multiplex, malls, hospitals, hotels and convention centers whose total floor area is less than 2000 sq. mt.
d. All buildings that have connected load of 100kW or greater or have contract demand of 120 kVA or greater;
(ii) At the time of application, the owner / applicant shall submit an initial evaluation / analysis report on complied ECBC parameter prepared by architect (empanelled with BEE). Thereafter, upon completion of the building the consultant shall submit completion certificate with final evaluation report in compliance to initial evaluation report.
(iii) Authority based on receipt of relevant documents submitted by the architect shall award occupancy certificate to the owner.
(iv) The certificate of compliance is to be submitted after every five years failing to which the Authority shall give notice of three months and after that may charge compounding fee annually till the time compliance is done.
9.7 Water Re-Use and Recycling
(i) All buildings having a minimum discharge of 50,000 liters and above per day shall incorporate waste-water recycling system. The recycled water shall be used for horticultural, flushing and cooling tower purposes.
(ii) The dual pipe system shall be adopted for these buildings.
9.8 Provisions for City and Site level greening
In alignment with National Sustainable Habitat Mission, the Authority shall encourage augmentation of green cover in the city / plot, by adopting The Urban Greening Guidelines, 2014 and other provisions as given below. The approval of landscape plan shall be essential.
(i) Provision of minimum 1 tree / every 80sq. mt. of plot area for plot sizes > 300sq. mt. and planted within the plot.
(ii) In residential layout plans/ group housings (plotted and flatted) minimum 15 percent land of total area of layout shall be reserved as park and sports ground.
(iii) In the non-residential plans, 10 percent land of total area shall be reserved and be proposed as park
(iv) In the industrial development map, Trees shall be planted at the rate of 125 trees per hectare.
(v) Large industry shall be separated from residential area by dense tree plantation which shall be 15 percent of the total industrial plot.
(vi) In the commercial schemes of above 2500 sq. mt. plot area, minimum 10 percent part of the reserved open space shall have ‘greenery’ (soft surface) with tree plantation at the rate of 25 trees per hectare.
(vii) For economically weaker and slum improvement schemes,trees shall be planted in cluster on minimum 100sq. mt. area for every 50 families.
(viii) Norms of open space
a. The minimum width of open space shall be 7.5 mt.
b. The green space shall be minimum 3.0 mt. away from the building and this 3.0 mt. pathway can be included in the open space calculation.
(ix) The unpaved area shall be more than or equal to 20% of the recreational open spaces.
(x) Compensatory Plantation for felled / transplanted tress in the ratio 1:3 within the premises under consideration.
(xi) Choice of species for plantation in site and abutting the road may be adopted as per Section 8 of the Urban Green Guidelines, 2014.
9.9 Sustainable Building Materials
The following supplementary building materials (derived or processed waste) may be suitably used while constructing building in combination with conventional resources:
(i) Panels, hollow slabs, hollow blocks - Conservation of materials, less water requirement.
(ii) Fly Ash bricks, Portland Pozzolana cement, Fly ash concrete, phosphor gypsum based walling & roofing panels, particle wood – Recycled use of industrial / agricultural by-products.
(iii) Fly ash / AAC (Autoclaved Aerated light weight Concrete) panels / CLC (Cellular Light weight Concrete) panels- Ensures thermal comfort (significant reduction in air-conditioning requirement)
(iv) Use of bamboo & rapidly growing plantation timbers- Environmental benefits.
(v) Compressed Soil Earth Block and Rammed Earth Walls