5.1 Use of site, type and character of building
No building shall be constructed on any site, on any part of which there is deposited refuse, excreta or other offensive matter objectionable to the Authority, until such refuse has been removed there from and the site has been prepared or left in a manner suitable for building purposes to the satisfaction to the Authority.
5.2 Restrictions of Building Activity
(1) Roadside Land Control Act 1945:No objection Certificate shall be required from the concerned department before the permission for construction on plots situated on scheduled roads for which Road Side Land Control Act, 1945 is applicable.
(2) Airport / Airbase / Airstrip
(i) Buildings:
a. For building activity within the Restricted Zone / Air Funnel Zone near the airport, necessary clearance from the concerned Airport Authority shall be obtained. No structure shall be constructed or erected on any land within a radius not exceeding twenty kms. from the civil and defense aerodromes, without obtaining a No Objection Certificate.
b. The building heights and other parameter shall be regulated as per the stipulations of the Airport Authority of India as notified in Gazette of India Extraordinary (S.O.1589) dated 30-06-2008 and as amended from time to time by Ministry of Civil Aviation, Government of India.
c. Irrespective of their distance from the aerodrome, even beyond 20km limit from the Aerodrome Reference Point, no radio masts or similar installation exceeding 152m in height shall be erected except with the prior clearance from Civil Aviation Authorities.
(ii) Other Structures:
a. Within a 5km radius of the Aerodrome Reference Point, every structure / installation building shall be designed so as to meet the pigeon / bird proofing requirement of the Civil Aviation Authorities. Such requirement may stipulate the prohibition of any cavity, niche or other opening on the exterior of such building / installation / structure so as to prevent the nesting and habitation of pigeon or other birds.
b. No chimneys or smoke producing factories shall be constructed within a radius of 8km from the Airport Reference Point
c. Slaughter House, Butcheries, Meat shops and Solid Waste Disposal Sites and other areas for activities like depositing of garbage which may encourage collection of high flying birds, like eagles and hawks, shall not be permitted within 10 km from the Airport Reference Point.
(3) Defense Establishments
In case of Sites within 500m distance from the boundary of Defense Areas / Military Establishments, prior clearance of Defense Authority shall be obtained.
(4) Electrical Lines
(i) No building or part of a building shall be constructed or re-constructed and no additions or alterations to any existing building shall be made in the intervening spaces between the building and any overhead electric supply line unless as described in Table below and specified in the Indian Electricity Regulations as amended from time to time.
| Sl.No. | Type ofElectrical Supply Line | Minimum Vertical Clearance(m) | Minimum Horizontal clearance(m) |
|---|---|---|---|
| 1 | Low and Medium Voltage lines and service lines | 2.5 | 1.2 |
| 2 | High Voltage lines up to and including 11000 volts | 3.7 | 1.2 |
| 3 | High Voltage lines above 11000V and up to including 33000 volts | 3.7 | 2.0 |
| 4 | Extra High Voltage lines above 33000 volts | 3.70 plus 0.30mfor every additional 33000 volts or part thereof | 2.00 plus 0.30m for every additional 33000 volts or part thereof |
Table 3: Clearance from Overhead Electric Lines
(5) Distance from water sources:
Plot boundary shall be determined after leaving the following distance from water source:
| S. No. | Water Source | Distance to be left |
|---|---|---|
| 1 | River Bank | 30.0 mt. |
| 2 | Underground Water Source / Natural Springs | 10.0 mt. |
| 3 | Nallah / Natural Water Channel / Rivulet | 5.0 mt. |
| 4 | Lake Boundary / From Full Tank Level | 30.0 mt. |
Table 1:Water Source and respective distances to be left
The Competent Authority may permit construction of infrastructure related to public services in special circumstances.The directions issued by Hon’ National Green Tribunal shall supersede the above norms.
(6) Heritage Structures / Geo Heritage Sites
(i) In case of Sites located within the distance up to 100m from protected monuments as notified under Archeological Monuments and Ancient Sites and Remains Act 1955 and as amended as well as such sites / streets / area earmarked in Master Plans / Zonal Plans, no construction shall be allowed.
(ii) For the Sites located within distance of above 100m and up to 200m from the protected monuments, the construction is allowed only after obtaining prior permission from the National Monument Authority in case of listed buildings under the AMASR Act.
(iii) For the Sites located within the vicinity of any Heritage Structure / Geo Heritage Sites notified as per the respective law, the prior clearance from the concerned authority shall be obtained.
(iv) For the development / redevelopment of any notified Heritage Structure / Geo Heritage Sites the stipulations as prescribed by the respective authority shall be followed.
(7) Oil / Gas Pipelines
In case of Sites in the vicinity of Oil / Gas pipelines, clearance distance and other stipulations of the Respective Authority shall be complied with. The Oil / Gas Authorities shall also specify the clearances required stretch wise to Local Body.
(8) Railways
The distance between the Railway Property Boundary and the edge of the building shall be 30m as per Indian Railways Works Manual or as per No Objection Certificate (NOC) given by the Railway Authorities.
(9) Vicinity of important buildings
Within 500m radius from the boundary of the Governor’s House, State Secretariat, Legislative Assembly, Official Residences of Chief Justice of High Court, Chief Minister, Heads of Legislature and such other buildings as jails, etc. as may be notified by the ULB / Government from time to time, any building upto only 10m height may be permitted on case to case basis as decided by the Competent Authority.
(10) Distance from solid waste landfill sites
No plan shall be sanctioned within 500mt. distance from the boundary of sanitary landfill site. Only agriculture activity shall be permitted in such buffer area.
(11) Construction on Slopes
No construction shall be permissible at places where the natural slope of the proposed site without cut and fill of more than 30.0 degrees (in case of Nainital Municipal Area, it shall not be more than 26.5 degrees).
No construction shall be permissible at places where there is a possibility and tendency of landslide within 250 mt. radius of the proposed site. Such cases which are susceptible to landslides and instability, NOC shall be obtained from Geological & Mining unit of Department of Industries.
However, construction on slopes more than 30 degrees, related to public utilities / infrastructure which are important for the development of the area, may be considered at Government level after obtaining certificate from the geologist in respect of safety, suitability and geological stability of the project on the given slope.
5.3 Approach Road
(1) The approach road to the site shall be determined by theMinimum Existing Authorized Width or Width as per Master Plan on which the plot abuts
| S. No. | Category of Construction | Type of Buildings / Projects | Minimum right of way in mt. | Minimum right of way in mt. |
| S. No. | Category of Construction | Type of Buildings / Projects | Plains | Hills |
| (i) | la it ne d is e R | Single residential plot | 7.5* | 2.0 |
| (i) | la it ne d is e R | Multiple units on Single residential plot | 9.0 | 4.5 |
| (i) | la it ne d is e R | Residential-Plotted development | 9.0 | 6.0 |
| (i) | la it ne d is e R | Residential-Group Housing | 9.0 | 7.5 |
| (i) | la it ne d is e R | Affordable Housing | 9.0** | 6.0** |
| (i) | la it ne d is e R | EWS & rehabilitation housing schemes | 9.0** | 6.0** |
| (ii) | la ic re m m o C | Commercial / office spaces- individual sites less than 100 sq. mt. | As approved by Competent Authority keeping in view the site conditions. | As approved by Competent Authority keeping in view the site conditions. |
| (ii) | la ic re m m o C | >100-200 sq. mt. | 9.0 | 4.5 |
| (ii) | la ic re m m o C | >200&<2000 sq. mt. | 12.0** | 6.0** |
| (ii) | la ic re m m o C | >=2000 sq. mt. | 18.0 | 7.5 |
| (iii) | Public/Semipublic | Public/Semipublic | ||
| a. | Educational | Nursery / crèche | 7.5 | 3.0 m |
| a. | Educational | Nursery / Primary Schools upto 4000sq. mt. | 9.0 | 4.5** |
| a. | Educational | Middle and Senior Secondary | 12.0** | 6.0** |
| a. | Educational | Colleges and university | 18.0** | 7.5** |
| b. | Health | Laboratory / Clinics upto 750 sq. mt. | 9.0 | 6.0 |
| S. No. | Category of Construction |
5.4 Minimum Plot Area
| Types of Buildings / Project | Minimum Net Plot Size (sq. mt.) | ||
| Plains | Hills | ||
| (I) Residential | |||
| Residential- standalone single plots | 30 (on roads less than 18.0 mt.) | 30 | |
| 250 (on roads more than equal to 18.0 mt.) | |||
| Residential- Multiple units | 500 | 250 | |
| Residential- Group Housing [ flatted/ plotted] | 2000 | 1000 | |
| Affordable Housing / EWS & Rehabilitation housing | 4000 | 2000 | |
| EWS & rehabilitation housing schemes | Plotted unit size | 30-45 | 30-45 |
| Flatted unit size | 25-35 | 25-35 | |
| (II) Commercial | |||
| Convenience shops / kiosks* | 15 | 10 | |
| Commercial / office spaces | 125 | 75 | |
| Mall / multiplex | 2500 | 1500 | |
| Serviced apartment | 1000 | 750 | |
| Wedding points | 2000 | 1000 | |
| Hotels | 1000 | 750 | |
| Motel & Resorts | 4000 | 2500 | |
| Eco resorts | 10,000 | 7,500 | |
| Hostel / guest house | 750 | 500 | |
| (III) Public / Semi Public | |||
| Educational | |||
| Nursery / Crèche | 750 | 500 | |
| Primary Schools | 4000 | 3000 | |
| Middle school | 8000 | 6000 | |
| Types of Buildings / Project | Minimum Net Plot Size (sq. mt.) | |
| Plains | Hills | |
| High School | 18,000 | 13,500 |