b) “Empanelled Architect” – A person empanelled by the Authority as per rules under these bye-laws as authorized person to sanction building plans of low risk buildings .
c) “Person Authorized” – means a qualified and duly registered Architect having a degree in Architecture or equivalent qualification and registered with the Council of Architects, India with minimum 5 years of experience. d) “Sanctioned Building Plan” means a building plan of a building/premises to be constructed on a plot and approved by the Competent Authority/ Architect in accordance with the provisions of Master Plan/Zonal development plan and Building Bye-laws.
e) “Fee” means a fee to be charged by the Authority/Architect for sanction of building plans. (Design and consultations fees agreed between the architect and his/her client is independent of this ‘Fee’)
For the empanelment, the qualified Architect shall submit list of projects handled with proof and credentials along with recommendations from Council of Architecture, India.
Authority should obtain security deposit/professional indemnity bond and professional liability insurance from empanelled Architects as decided in value from time-to-time.
The empanelment of an Architect shall be for a period of two years and can be extended from time to time subject to review by the Authority at the end of every two years.
The Architect shall be empowered to sanction building plans of single dwelling unit residential buildings forming part of approved layout plan. And The Architect shall be empowered to sanction building plans of other low risk buildings.
ANNEXURE 3: Low , Moderate And High Hazard Industries
A3:1. Broad Classification of Industrial Occupancies
Low Hazard Occupancies
Moderate Hazard Occupancies
High Hazard Occupancies
Abrasive Manufacturing Premises
Airport and Other Transportation Terminal Buildings
Sub Category (A)
Aerated Water Factories
Aluminum Factories
Aircraft Hangers
Agarbatti Manufacturing Premises
Assembly Buildings (D-1 To D-3)
Aluminum/Magnesium Powder Plants
Analytical and / or Q.C. Laboratories
Atta and Cereal Grinding
Bituminized Paper / Hessian Cloth / Tar Felt Manufacturing
Areca Nut Slicing and / or Betel Nut Factories
Bakeries and Biscuit Factories
Bulk Storage Of Flammable Liquids (Tank Farm, etc.)
Asbestos Steam Packing and
Beedi Factories
Celluloid Goods Making
Lagging Manufacturers
Assembly Buildings Small (D-4 and D-5)
Bobbin Factories
Chemical Manufacturers (Where Raw Materials Have a F.P. < 23°C)
Battery Charging and Service Stations
Book-Binders, Envelopes and Paper Bag Manufacturing
Cigarette Filter Manufacturing
Battery Manufacturing
Cable Manufacturing
Cinema Films and T.V. Production Studios
Breweries
Camphor Boiling
Coal, Coke and Charcoal Ball and Briquettes Making
Brickwork
Candle Works
Collieries, Steel Plants
Canning Factories
Carbon Paper / Typewriter Ribbon Makers
Cotton Seeds Cleaning and Delinting Factories
Cardamom Factories
Card Board Box Manufacturing
Cotton Waste Factories
Cement Factories and / or Asbestos or Concrete Products Manufacturing Premises
Cergctes of Maieriale of storags for Warnbeunen as per canbution riak
A2:3. Structural Engineers - Qualifications and Scope of Work
(i) Qualifications:
Grade-1
Post-Graduate in Structural engineering from recognized Indian or Foreign University, having Associate Membership of Institute of Engineer, India with minimum THREEyears' experience in structuralEngineering practice with designing and field work.
Grade-2
Post-Graduate in Structural engineering from recognized Indian or Foreign University, having Associate membership of Institute of Engineer, India with minimum TWOyears' experience in structuralEngineering practice with designing and field work. OR Graduate in Civil engineering from recognized Indian or Foreign University, having Associate membership of Institute of Engineer, India with minimum FIVE years' experience in structuralEngineering practice with designing and field work.
Grade-3
Post-Graduate in Structural engineering from recognized Indian or Foreign University, having Associate membership of Institute of Engineer, India with minimum ONE years' experience in structuralEngineering practice with designing and field work. OR Graduate in Civil engineering from recognized Indian or Foreign University, having Associate membership of Institute of Engineer, India with minimum THREE years' experience in structuralEngineering practice with designing and field work.
Grade-1
The Structural Engineer shall be competent to prepare the structural design, calculations and details for all buildings and undertake their supervision
Grade-2
The Structural Engineer shall be competent to prepare the structural design, calculations and details for BUILDINGS UPTO 15mt. height except LIFELINE BUILDINGS (hospitals, schools, exchange / communication, electricity related buildings or other such buildings) AND ASSEMBLY BUILDINGS (cinema, mall, multiplex, banquet hall, convention centers or other such buildings)
Grade-3
The Structural Engineer shall be competent to prepare the structural design, calculations and details for BUILDINGS UPTO 9.0 mt. height except LIFELINE BUILDINGS (hospitals, schools, exchange / communication, electricity related buildings or other such buildings) AND ASSEMBLY BUILDINGS (cinema, mall, multiplex, banquet hall, convention centers or other such buildings)
A2:3 SELF CERTIFICATION OF LOW RISK BUILDINGS BY Empanelled Architect
1. Definition: In these rules, unless the context otherwise requires:
A2:2. Duties and Responsibilities of Licensed Technical Personnel
(i) It will be incumbent on every Licensed Technical Personnel, in all matters in which he / she professionally consulted or engaged, to assist and co-operate with the Competent Authority in carrying out and enforcing the provisions of the Act and of any Bye-laws for the time being in force under the same.
(ii) Every Licensed Technical Personnel shall in every case in which he / she may be professionally consulted or engaged, by responsible, so far as his / her professional connection with such case extends, for due compliance with the provisions of the Act and of any regulations for the time being in force under the said Act, or such of them as may being in force under the said Act, or such of them as may respectively be applicable to the circumstances of the particular case and in particular it will be obligatory on him / her to satisfy himself / herself that a qualified and competent Inspector of Works in constantly employed and present on the work to supervise the execution of all works and to prevent the use of any defective material therein and the improper execution of any such work.
(iii) In every case in which a Licensed Technical Personnel is professionally concerned in connection with any building or work upon any premises, in respect of which a right to require as setback has accrued or is about to accrue to the Commissioner under the Provisions of the said Act, or any of them, it will be incumbent on such Licensed Technical Personnel to ascertain whether “the regular line of the Street” has been prescribed and whether any portion of the said premises is required for the street or under any presence whether, be a party to any evasion or evasion of the setback (if any) that may be required.
(iv) In every case in which a Licensed Technical Personnel professionally concerned in connection with any building or work upon any premises designed or intended to be used or any purpose in respect of which the written permission or license of the commissions, is prescribed by the said Act as a necessary condition to the establishment or use of such premises for such purpose, it shall be incumbent on such Licensed Technical Personnel, so far as his professional connection with such case extents, to see that all conditions prescribed by the said Act, or by any Bye-law of the time being in force there under, in respect of premises designed or intended to be applied to such use, are duly fulfilled or provided for.
(v) A Licensed Technical Personnel shall not carry out work in connection with any building or other erection on a plot of land leased or agreed to be leased by the ULB / DA in contravention of any term or condition of the lease or agreement for lease
(vi) When a Licensed Technical Personnel ceases to be in the employment for the development work, he shall report the fact forthwith to the Authority.
Explanaitiota:
# The dsfiector of thn apriakdir fimad in thoosiling sall be at more than 1.5 ms frone the gools mumd héow Hiouevvr, in cae of ju monags ao jate sd shail radh sithin 2 m of tho defiacions of te sprinldier bcads
# la casa of dionazs in madks or silvta. if tha heistht of mtcags is mors tuse ubar ia specifind intaradiais ertsisn tal a pvitat fir at t in adtn s the osiling spnnkcirs sed oveali dosign densit ant AMAC shall he matriaed as per Table 5 of15: 1510.
« Tha aiss wid hern ta morago tacks dai nt ho ku fhan 25 m and the másdrsats aria of sach stonags utack sdall not be more thas 15.0. zs. If thea paramamra am escaeded, the dasigs damsity spplcable sla be kcadnd by 25Lmism°.
Goots sonedt mot M 5g not SAVEE cht of raxata C M fut wd dtal DE naode haamand IF thas regan storag
# ln sae of micat stomgs (bot modent snd tigh taart mng) ie helding ta punan wll e grvurd I thmoe harka ococ
Notet:
f. lsy nee ae wlach arae the mmho af ccapat do a Age sospeatie wida cthe clauis of ocapasy slall change she dlasaicazie of cie Saildog t shat of the ane aae glr
Wae lous baildops slall nor saclede aty arncle wlatl u laghdy ccahacshie or scapliste satorpala or prodacu wládl arae dable to bus weth satr vupodty sud or whick my jrodaae poam fima or splan r aonggs éauing ad whch imale high camaa naar or sutas alaa asd ar oder dquads or chmu prodiag foe, fius and aplate paisna pria or crotae gas aud jr tle atorags Ruling of awy warsal prodag egpéraie mituru of dar whick mad an the dlnson of mzse in an fw parnicias satpact z speomateas gseson ar sach huallige fail as /anardour Zaladeg Caegoy
ANancmbeathmatriabs
Ariclea (which sars Non- Combutibie, Non -Hlammabls, Non -Conasiss, Nen -tocic, Noo-poisoneua, Nee-ltxplesie) much at Cemet, brick, mortar, hardvae iers metade in solid barmetal gooda (cxckaing those having melting poine bdlow looo'C)
E. Csobutib Matarial bs kblkmwing 4incb-categarias
Category
Material Specifications
Stocking height
Medium (in m)
High (in m)
Category I
Articles such as Carpos, Non synthetic/synthetic yarn and fabrics. Mechanical and electrical goods (dominantly metal parts), Glasswaren and crockery, fiberozoals, groceries, metal goods, Papers other than those listed under categories Moderate and High, Powdered and canned foods, Plastic/glass bottles containing non-flammable liquids, etc.
4
6.5
Category II
Articles such as Batteries. Baked carbon/synthetic fibers, Books, Taked cork, Baked warts paper; Carrots containing alcohols (in case/bottles), Carrots of canned lacquans which dry by solvent evaporation, Chipboard, Cardboard rolls (horizontally stored), Cereals/Grains/Foodstuff! Floor/Seager in soda, Cellulose/Cellulose pulp, Electrical goods other than tissues stated in Category Ive. Flammable liasids in non-combustible containers, Leather goods, Palletrical liquor stocks, Plastics (non-framed, other than cellulose nitrate), Rolled pulp and paper and asphalted paper (Horizontal storage), Vaneer sheets, Wooden ornaments, Metal/wooden furniture with plastic seats, etc.
3
5.5
Category III
Articles such as Ironmen/Wax coated paper. Cardiac Carbon black, Card board rolls (vertically stored) Charcoal, Coal+ cellulose nitrate, Foamed plasma and film rubber products, Flammable liquids in contractible containers, Linoleans products, Matthes, Plastics other than tissues stated in Category Moderate, Rolled pulp and paper and asphalted paper (vertical storage), Rubber goods including tires and tubes. Seven timber: Ventilated wood stacks, Wood and asphalt coated papers and containers in cartons. Wood wool, wooden powders and flats (idle). All materials having wrappings or pre-formed containers of foamed plastics, etc.
2
-4.5
Category IV
Offcuts and random places of foamed plastic or rubber rolls of sheets of foamed plastic or foamed rubber. Foam maturnes, Expanded polymerase packaging, Foam upholstery, etc.
1.25
3.5
Annexure 2QUALIFICATION & COMPETENCE OF TECHNICAL PERSONNEL For Preparation of Building Plan &Supervision A2:1. Qualification of Professionals / Technical Personnel And their Competence
Building / Development Work, for which permission is sought, shall be planned, designed and supervised by registered professionals. The registered professionals for carrying out the various activities shall be: Architect, Engineer, Structural Engineer, and Town planner & Supervisor (Draftsman).
Requirements for registration / license for these professionals by the Authority or by the body governing such profession and constituted under a statute, as applicable, to practice within the competent body’s jurisdiction, are given in item 1 to 7 of the following table:
Sr. No.
Professional
Qualification
Competence / Functions
1
Architect
Registered with a Valid Membership of the Council of Architecture (CoA)*, India; as prescribed under the Architect's Act, 1972 * As per Hon'ble Supreme Court directive architects registered with CoA need not to be empanelled / accredited by the authority. However, for ease of doing business it is requisite for them to create login id for online building plan approval process.
The registered architect shall be competent to carry out the work related to the building / development plan as given below: a. Prepare and sign all plans, sub-division / layout plans and information connected for building permit except engineering services of multi-storeyed / special buildings b. Preparation of building plans, drawings and related information connected for development permit of area up to 2 hectare for hilly areas and 4 hectares for plain areas. c. Supervision for Development Permit of areas up to 1 hectare for hilly areas and 2 hectare for plain areas (related to building layout and other architectural aspects d. Supervision and completion of all buildings pertaining to architectural aspects.
2
Engineer
Graduate Degree in Civil Engineering from recognized Indian or Foreign University or equivalent. Registered with Valid Membership (Civil) with the Institute of Engineers, India AND empanelled with the State Government in Grade-I, II or III
The registered engineer shall be competent to carry out the work related to the building / development plans as given below a. Prepare and sign all plans upto plot size 500 sqmt. b. Prepare and sign civil works and service
Structural Engineering Deptt. of all IIT / NIT / Govt. Engg. Institutes / Universities.
plans and information for building permit; c. Supervision for Development Permit of area up to 1 hectare for hilly areas and 2 hectare for plain areas (related to civil works and service installations); d. Supervision and completion of all buildings including structure and building services (as per the grade of empanelment of engineers as mentioned in clause: A-2 :3 NOTE:- The civil engineers licensed by the respective Competent Authority at the time of this draft displayed on the website shall be competent to Prepare and sign all building plans in the Authority Areas.
3
Structural Engineer
Structural Engineering Deptt. Of all IIT / NIT / Govt. Engg. Institutes / Universities. AND Structural Engineers Empanelled by the State Government (having qualification as mentioned clause A-2 :3
The structural Engineer shall be competent to prepare the structural design of the buildings as per the Grades in which they are empanelled as mentioned in clause: A-2 :3
4
Town Planner
Post Graduate Degree / diploma in Town and Country Planning or equivalent
The registered Town Planner shall be competent to carry out the work for the development permit as given below. a. Preparation of plans for land sub- division / layout and related information connected with development permit for all areas more than 1 hectare. b. Supervision for Development of land of all areas.
5
Supervisor
a. Three years of Architectural Assistantship or Intermediate in Architecture with two years of experience. b. Diploma in Civil Engineering with two years of experience c. Draftsman in Civil Engineering from I.T.I. with five year of experience under Architect / Engineer. d. Based on above qualifications, license is to be given by the Competent Authority.
The Supervisor shall be competent to submit a. All plans and related information connected with building permit for residential buildings on plots up to 100 sq. mt. and upto two storeys or 7.5 mt. height. b. Certificate of Supervision of Buildings as mentioned above in a.
6
Geotechnical engineer
Graduate in civil engineering of recognized Indian or foreign university, or Corporate Member of Civil Engineering Division of Institution of Engineers (India), and with minimum 3 years experience in geotechnical engineering practice with designing and field work. NOTE . The 3 years experience shall be relaxed to 2 years in the case of post graduate degree of recognized Indian or foreign university in the branch of geotechnical engineering. In case of doctorate in geotechnical engineering, the experience required would be one year.
The geotechnical engineer shall be competent to carry out subsurface investigations and give report thereof. These may inter-alia include performing various tests required to determine engineering properties of sub-strata and ground water and making recommendations about the type of foundation, soil bearing capacity and the depth at which the foundations shall be placed, considering the structural system and loads supplied by the engineer/structural engineer.
6
Third party Structural Auditors
a. Structural Engineering Deptt. Of all IIT / NIT / Govt. Engg. Institutes / Universities. b. GRADE-1 Empanelled Structural Engineers having ten years of experience
Proof Checking of the Structural Drawings and specifications prepared by structural engineer for buildings more than 15mt. in height
7
ECBC / Green Building Architect
a. Registered with a Valid Membership of the Council of Architecture (CoA)*, India; as prescribed under the Architect's Act, 1972 AND b. empanelled with the concerned authorities {LEED / IGBC / GRIHA etc.} to prepare and sign plans of ECBC / Green Buildings
To prepare and sign plans & completion notice regarding the compliance of Green Buildings and ECBC norms.
8
Fire Consultant
The applicant should have at-least 7 years of experience in Fire Safety Engineering with proven track record in designing Fire Safety measures for various kinds of fire hazards in Educational, Residential and Industrial complexes, IT / Industrial sector in preparation of DPR / Supervision / Implementation / Safety Audit / Work Zone Safety / Planning etc. of Fire Safety solutions
For buildings mentioned in clause 8.2 (4) and high rise buildings a. Carry out fire risk assessment and calculate b. Fire Load based on the actual site survey data. c. Establish a fire safety strategy / master plan d. Specify passive safety in architectural concepts as well as technical systems e. Obtain No Objection Certification from all statutory authorities on proposed fire safety system.
Table 48: Qualification of Professionals / Technical Personnel
ANNEXURE4: Water Supply and Sanitation Requirements in Buildings
A4:1. Plumbing and Sanitary Services
(i) The planning, design, construction and installation of water supply, drainage and sanitation and gas supply system shall be in accordance with Part-9: Plumbing Services, Section-l Water supply, Drainage and sanitation (including Solid Waste Management) and Section-2 Gas supply of NBC, 2005.
(ii) Requirement of Water Supply for various occupancies in buildings shall be as given in Tables A.1, A.2 and A.3.
(iii) Requirement of Sanitary fittings and installations for different occupancies in buildings shall be as given in Tables A.4 to A.17 for calculation of occupancy.
(iv) Sewage treatment plant of capacity of treating 100% waste water to be installed. (Ref Table - 37)
A3:3. Assembly Buildings
These shall include any building or part of a building, where number of persons not less than 50 congregate or gather for amusement, recreation, social, religious, patriotic, civil, travel and similar purposes, for example, theatres, motion picture houses, assembly halls, auditoria, exhibition halls, museums, skating rinks, gymnasiums, restaurants, places of worship, dance halls, club rooms, passenger stations and terminals of air, surface and marine public transportation services, recreation piers and stadia, etc.
Buildings under Group D shall be further sub-divided as follows:
Category
Particulars
Details
Sub-division D-1
Buildings having a theatrical or motion picture or any other stage and fixed seats for over 1000 persons
This sub-division shall include any building primarily meant for theatrical or operatic performances and exhibitions and which has a raised stage, proscenium curtain, freed or portable scenery or scenery loft, lights, motion picture houses, mechanical appliances or other theatrical accessories and equipment and which is provided with fixed seats for over 1000 persons
Sub-division D-2
Buildings having a theatrical or motion picture or any other stage and fixed seats upto 1 000 persons
This sub-division shall include any building primarily meant for use as described for sub-division D-1, but with fixed seats up to 1000 persons.
Sub-division D-3
Buildings without a permanent stage having accommodation for 300 or more persons but no permanent seating arrangement
This sub-division shall include any building, its lobbies, rooms and other spaces connected thereto, primarily intended for assembly of people, but which has no theatrical stage or permanent theatrical and for cinematographic accessories and has accommodation for 300 persons or more, for example, dance halls, night clubs, halls for incidental picture shows, dramatic, theatrical or educational presentation, lectures or other similar purposes having no theatrical stage except a raised platform and used without permanent seating arrangement art galleries exhibition halls, community halls, marriage halls, places of worship, museums, lecture halls, passenger terminals and Heritage and Archeological Monuments
Sub-division D-4
Buildings without a permanent stage having accommodation for less than 300 persons with no permanent seating arrangement.
This sub-division shall include any building primarily intended for use as described in sub-division D-3, but with accommodation for less than 300 persons with no permanent seating arrangements
Sub-division D-5
All &her structures including temporary structures designed for assembly of people not covered by sub-divisions D-1 to D-4, at ground level
This sub-division shall include any building or structure permanent or temporary meant for assembly of people not covered by sub-divisions D-1 to D-4, for example, grandstands, stadia, amusement park structures, reviewing stands and circus tents.
Sub-division D-6
Buildings having mixed occupancies providing facilities such as shopping, cinema theatres, and restaurants
This sub-division shall include any building for assembly of people provided with multiple services/facilities like shopping, cinema theatres and restaurants, for example, multiplexes.
Sub-division D-7
All other structures, elevated or underground, for assembly of people not covered by sub-divisions D-1 to D-6
This sub-division shall include any building or structure permanent or temporary meant for assembly of people not covered by sub-divisions D-1 to D-4, for example, grandstands, stadia, amusement park structures, reviewing stands and circus tents.
Table 49:Description of Assembly Buildings
A4:2. Segregated Sanitation for Visitors in Public Buildings
(i) Special requirement of segregated sanitation for Visitors in Public Buildings (Government Buildings, Hospitals, Educational Institutions, Commercial Building etc). Provisions and occupancies shall be referred at Table A.10.This section is provided for segregated toilet facilities for visitors in Public Buildings (within the premises of the building, but outside the building block).
(ii) Public toilets are meant for floating population, usually located near railway stations, bus stands, market places, government hospitals, religious centers etc. These toilets have a greater demand for urinals than community toilets.
(iii) The key considerations for siting such facilities on the site are a. Size of the toilet block (i.e. number of seats) and b. Location of the toilet block with respect to the main building block c. Convenience of the visitors in accessing and using the facility
(iv) Surveys conducted by the central government show that people, especially women and aged, are unlikely to use the facility if it beyond 500 mt. The preferable location shall be within 200-500m from the main entry of the building.
(v) The site shall be earmarked on Site Plan or a Layout plan. The Authority shall clearly state advantages and disadvantages of the location for the owner / engaged Competent Professional for building plan design (as per Annexure - 1) to make an informed decision on the siting.
(vi) It must be accessible to visitors and general public during the operational hours of the building. However, fiscal generation for maintenance may be planned w.r.t user charges from visitors and general public.
Experience in sample cities has shown that toilet blocks are more likely to remain clean if they are centrally located; those on periphery sooner fall into disrepair.
A4:3. Other Factors to be Considered
(i) Wastewater conveyance / treatment and prevention of contamination
Since sewers may not be available in many cities, in most cases the toilet blocks will have on-site sanitation, which would require periodic cleaning of tanks / pits. Location on site should allow easy and hygienic emptying of the pits / tanks and ensure that ground water table is not contaminated by wastewater percolation.
(ii) Adequacy in provision
The size of the block (i.e. on number of seats) must meet visitors’ need. Inadequacy results in long queues and encourages open urination. Care is to be taken for balancing problems andother special needs of children and the elderly.
(iii) Design considerations
a. Adequate Ventilation.
b. Door Design / Direction of swing of the door (preferred outwards),
c. Adequate Waiting area and
d. Adequate volumes of water storage.
A4:4. The Facilities should include:
(i) Separate toilet blocks for men and women with separate entries.
(ii) Seats for children to be provided in both sections for men and women.
(iii) Waiting / Holding area.
(iv) Space for Facility caretaker and maintenance staff – from where they can monitor and maintain both facilities for men and women.
(v) Urinal facilities for men
(vi) Waste water disposal system
(vii) Janitor / Store room for cleaning material / equipment.
Note: Table A.12 may be referred for number of seats / urinals for this section.
A4:5. Norms for differently-abled within segregated toilets
(i) One special w.c. in a set of toilet shall be provided for the use of differently abled persons, with essential provision of wash basin near the entrance.
(ii) Minimum clear opening of the door shall be 900 mmt. and the door shall swing out.
(iii) Suitable arrangement of vertical / horizontal handrails with 50 mmt. clearance from wall shall be made in the toilet.
(iv) The w.c. seat shall be 500 mmt. from the floor.
A4:6. Water requirement and facilities
(i) Water requirement for the facility may be worked out and enough storage for ½ day operation is to be kept in storage.
(ii) If municipal water supply is reliable, the toilet blocks may have underground sump that can store half a day’s requirement and overhead tanks for another half.
(iii) If municipal water supply is not available, toilet block may have its own bore well and pump with no underground sump.
(iv) Alternatively a hand tube well can be used for storing water in an elevated (not overhead) tank.
(v) To minimize the wastage of water, self-closing water taps should be used. The pans must be of Pour Flush (PF) design i.e. with a steep slope. Traps should be of a 20 mm water seal. (Use of 50 mm water seal traps will require more water for flushing)
(vi) If toilet is to be linked to city sewer, a master trap has to be provided at the sewer connection.
(vii) Urinals may not be fitted with urinal pots as their replacement is expensive.
(viii) *The values in parenthesis are for such stations, where bathing facilities are not provided.
Note:The number of persons for Sl. No. 11 to 14 shall be determined by the average number of passenger handled by the station daily with due consideration given to the staff and workers likely to use the facilities.
Sl. No.
Type of Occupancy
Consumption per head per day (in lt.)
1.
Residential a. In living units b. Hostels c. Hotels with lodging accommodation (per bed) d. Hotels (5 star and above)
135135180340
2.
Educational a. Day schools b. Boarding Schools
45135
3.
Institutional (Medical Hospitals) a. No. of beds not exceeding 100 b. No. of beds exceeding 100 c. Medical quarters and hostels
340450135
4.
Assembly- Cinema theatres, auditoria, etc. (per seat accommodation)
15
5.
Government or Semi-public business
45
6.
Segregatedtoilet facilities forVisitors in Public Buildings a. Each use of toilet (including washing hands and floors) b. Flushing urinals
70.20
7.
Mercantile (Commercial) a. Restaurants (per seat) b. Other business building
7045
8.
Industrial a. Factories where bath-rooms are to be provided b. Factories where bath-rooms are not to be provided
4530
9.
Storage (including Warehouses)
30
10.
Hazardous
30
11.
Intermediate Stations (excluding mail and expressstops).
* Thevalues inparenthesis are for suchstations,where bathing facilities are not provided. Note:ThenumberofpersonsforSl.No.11to14shallbedeterminedbytheaveragenumberofpassenger handled bythe stationdaily withdue consideration givento the staff andworkers likely to use the facilities.
S. No.
Classification of Building
Storage Capacity
1.
For tenements having common convenience
900 liters net per w.c. seat
2.
For residential premises other than tenement having common conveniences
270 liters net for one w.c. seat each and 180litersfor each additional seat in the same flat.
3.
For factories and workshops
900 litersper w.c. seat and 180 liters per urinal.
4.
For cinemas, public assembly hall, etc.
900 litersper w.c. seat and 350 liters per urinal.
Table 51Flushing Storage Capacities
Sl. No.
Occupancy
No. of Floors
Storage Capacity
Remarks
1.
For premise occupied tenements with common conveniences
Ground floor
Nil
Provided down take fittings are installed
2.
Floors 2, 3,4, 5 and upper floors
500 liters per tenement
3.
For premises occupied as flats or blocks
Ground floor
Nil
Provided down take fittings are installed
4.
Floors 2, 3, 4, 5 and upper floors
500 liters per tenement
Table 52: Domestic Storage Capacities
Note:
If the premises are situated at a place higher than the road level in front of the premises, storage at ground level shall be provided on the same lines as on floors.
Theabovestoragemaybepermittedtobeinstalledprovidedthatthetotaldomesticstorage calculatedon the above basis is not less than the storage calculated on the number of down take fittings according to scale given below:Downtake taps70 l. each Showers135l.each Bathtubs200l.each
Sl. No.
Sanitary Unit / Fittings
For Personnel
1.
Water closet
One for every 25 persons or part thereof exceeding 15 (including employees and customers).For female personnel 1 for every 15persons or part thereof exceeding 10.
2.
Drinking Water Fountain
One for every 100 person with a minimum of one on each floor.
3.
Wash Basin
One for every 25 persons or part thereof.
4.
Urinals
Same as Sl. No. 3 of Table 4.14
5.
Cleaners' Sink
One per floor minimum, preferably in or adjacent to sanitaryrooms.
Note:Numberofcustomersforthepurposeoftheabovecalculationshallbetheaveragenumberof persons in thepremisesforatimeintervalof onehour duringthepeakperiod.Formale-femalecalculationaratio of: 1maybeassumed
S. No.
Sanitary Unit
For Residential Public staff
For Non-Residential Staff
For male
For female
1.
Water Closet (w.c.)
One per 8 Persons omitting occupants of the attached water closet minimum of 2 if both sexes are lodged
1 for 1-15 persons 2 for 16-35 persons 3 for 36-65 persons 4 for 66-100 persons
2 for 1-12 persons 4 for 13-25 persons 6 for 26-40 persons 8 for 41-57 persons 10for 58-77 persons 12for78-100 persons Add 1 for every 6 persons or part thereof.
2.
Ablution Taps
One in each w.c.
One in each w.c.
One in each w.c.
3.
Urinals
Nil
Nil upto 6 persons 1 for 7-20 persons 2 for 21-45 persons 3 for 40-70 persons 4 for 71-100 persons
Nil
4.
Wash Basins
One per 10 persons omitting each basin installed in the room / suite
1 for 15 persons 2 for 16-35 persons 3 for 36-65 persons 4 for 66-100 persons
1 for 1-12 2 for 13-25 3 for 26-40 4 for 41-57
5.
Baths
One per 10 persons, less occupants of room with bath in suite
Nil
Nil
6.
Cleaner's Sinks
One per 30 Bed rooms (one per floor minimum)
Nil
Nil
7.
Kitchen Sink
One in each Kitchen
One in each Kitchen
One in each Kitchen
Table 54Sanitary Requirementsfor Hotels
S.No
Sanitary Unit
For Male
For Female
1.
Water Closet
Oneper100personsupto400persons; for over 400 add at the rate of one per 250 persons or part thereof.
Two for 100 persons upto 200 persons;over 200 add at the rate of one per 100 persons or part thereof.
2.
Ablution Taps
One in each w.c.
One in each w.c.
3.
Urinals
Onefor50personsorpartthereof.
Nil, upto 6 persons 1 for 7-20 persons 2 for 21-45 persons 3 for 46-70 persons
4 for 71-100 persons
4.
Washbasins
One per w.c. / Urinal
One per w.c.
5.
Kitchen Sink
One in each Kitchen
One in each Kitchen
6.
Baths (showers)
One per 10 persons
One per 10 persons
7.
Cleaner's Sinks
One per 30 Bed rooms (one per floor minimum)
One per 30 Bed rooms (one per floor minimum)
Table 55: Sanitary Requirements for Public Rooms
It may be assumed that the two-thirds of the number are males and one- third females.
One water tap with drainage arrangements shall be provided for every 50 persons or part thereof in the vicinity of water closet and urinals
Kitchen sinks & dish Washers (where Kitchen is provided)
One for each floor
One for each floor.
8.
Nil upto 6 persons 1 for 7-20 persons 2 for 21-45 persons 3 for 46-70 persons 4 for71-100 persons From 101 to 200persons add at the rate 3%; for over 200 Persons add at the rate of 2.5%
Table 60Sanitation Requirements for Institutional (Medical) Occupancy- (staff quarters and Hostels)
S. No.
Sanitary Unit
For Male Personnel
For Female Personnel
1.
Water Closet (w.c.)
One for 25 persons or part thereof
Two for 15 persons or part thereof
2.
Ablution taps
One in each w.c.
One in each w.c.
3.
Urinals
Nil upto 6 persons 1 for 7-20 persons 2 for 21-45 persons 3 for 46-70 persons 4 for 71-100 persons From 101 to 200 add @ 3%; For over 200 persons add @ 2.5%.
--
4.
Wash Basins
On Oneforevery25personsorpart thereof
e for every 25 persons or part thereof
5.
Drinking water fountains
Oneforevery100personswitha minimum of one on each floor
One for every 100 persons with a minimum of 1 on each floor
6.
Cleaner's Sinks
One per floor minimum; preferably inor adjacent to sanitary rooms.
--
7.
Executive Room / Conference Halls
Toilet Suite (1 w.c., 1 washbasin, optional shower for 24 hour usages) Unit could be common for Male / Female or separate depending on the
Toilet Suite (1 w.c., 1 washbasin, optional shower for 24 hour usages) Unit could be common for Male / Female or separate depending on the
S. No.
Sanitary Unit
For Male Personnel
For Female Personnel
number of user of each facility
number of user of each facility
Table 61: Sanitation Requirements for Governmental and Public Business Occupancy and Offices
Note:Onewatertapwithdrainagearrangementsshallbe provided/ 50 personsor part thereofinthevicinity
S. No
Sanitary Unit
For Male Personnel
For Female Personnel
1.
Public toilet near Railway Stations (24x7) a)Water Closet(W.C) b)Urinals c)Ablution taps
a) One for 100 users b) One unit per 300-500 users c) One in each w.c.
a)One for 50 users b)-- c)One in each w.c.
2.
Public Toilet near marketplace / offices(for working hours) a) Water Closet b)Urinals c)Ablution taps
a) One for 100 users b) One unit per 200-300 users c) One in each w.c.
a)One for 50 users b)-- c)One in each w.c.
3.
Public toilets near Public Buildings a) Water Closet b)Urinals c)Ablution taps
a) One for 100 users b) One unit per 200-300 users c) One in each w.c.
a)One for 50 users b)- c)One in each w.c.
Table 62: Segregated sanitation facilities for Visitors in Public Buildings
Note: PerCapitaVolumeofWater required may be referred at item6,Table4.6 Area and sizesof seats / unitsmaybereferredat Table4.16
S. No.
Description
Optimum (mm)
Minimum (mm)*
Table 63: Recommended enclosure-sizes for different facilities at visitors’ toilets
One water tap with draining arrangements shall be provided for every 50 persons or part thereof in the vicinity of water closets and urinals.
• It may be assumed that two thirds of the number is males and one third females.
S. No.
Sanitary Unit
For Public
For Staff
Male
Female
Male
Female
1
WaterCloset (w.c.)
One for 200 persons upto 400 persons. For over 400 persons, addattherateof1per250personsor part thereof
Fourfor100personsupto200persons. For over 200 persons, add at the rate of 1 per 50 persons or part thereof
Onefor1-15persons. Two for 16-35 persons.
Two for 1-12 persons. Four for 13-25 persons, add at therateof1 per 6 persons.
2
Ablution Taps
One in each w.c.
One in each w.c.
Oneineach W.C
Oneineach W.C
3
Urinals
One for 50 persons or part thereof
--
Nil upto 6 persons Onefor7-20persons Two for 21-45 persons
--
4
Wash Basins
Oneforevery200personsorpart thereof.For over 400 persons,addattherateof1 per250personsorpart thereof.
One for every 200 personsorpart thereof.Forover 200 persons, add at the rate of 1 per 150 personsorpart thereof
Onefor1-15persons Two for 16-35
Onefor1-12persons Two for 13-25 persons
5
Cleaner's Sink
One per floor, minimum
6
Drinking Water Fountain
One per 100 persons or part thereof
7
Shower / Bath
As per trade requirements
Table 66: Sanitation Requirements for Assembly Buildings (Art, Galleries, Libraries and Museums)
Note:It may be assumed that twothirdsof thenumbersaremalesand one third females.
S. No.
Sanitary Unit
For Public
For Staff
Male
Female
Male
Female
1.
WaterCloset (w.c.)
One per 50 seats upto 200seats.Forover200 seats, add at the rate of 1 per100seats or part thereof
Oneper25seatsupto200seats.Forover 200seats,add at the rate of 1 per 50 seats or part thereof
1 for 15 persons. 2for16-35 persons. 3for36-65 persons. 4for66-100 persons.
2 per 1-12 persons. 4 for 13-25 persons. 6 for 26-40 persons. 8 for 41-57 persons. 10 for 58-77 persons.12for78-100persons.
2.
Ablution Taps
Oneineach w.c.
Oneineach w.c.
One in each w.c.
One in each w.c.
3.
Urinals
One for 50 persons or part thereof
--
Nil upto 6 persons. 1 for 7-20 persons. 2 for 21-45 persons. 3 for 46-70 persons. 4 for 71-100 persons.
--
4.
Wash Basins
One for every water closet
5.
KitchenSinks& Dish Washer
One per each Kitchen
6.
Service Sink
One in the restaurant
Table 67: Sanitation Requirements for Restaurants
It may be assumed that two thirds of the numbers are males and one-third females.
One water tap with draining arrangements shall be provided for every 50 persons or part thereof in the vicinity of water closets and urinal
Sl. No.
Sanitary Unit
For Male Personnel
For female Personnel
1.
Water Closet
1 for 15 persons 2 for 16-35 persons 3 for 36-65 persons. 4 for 66-100 persons. For 101 to 200 persons add at rate of 3%.From over 200 persons, add at the rate of 2.5%.
2 for 1-12 persons 4 for 13-25 persons. 6 for 26-40 persons. 8 for 41-57 persons. 10 for 58-77 persons. 12 for 78-100 persons. For 101 to 200 persons, add at the
rate of 3%.From over 200 persons add at the rate of 2%.
2.
Ablution Taps
One in each W.C
One in each w.c.
3.
Urinals
Nil upto 6 persons 1 for 7-20 persons 2 for 21-45 persons 3 for 46-70 persons 4 for 71-100 persons From 101 to 200 persons add at the rate of 3%; for over 200 persons add at the rate of 2.5%.
--
4.
Washing Taps with draining arrangement
One for every 25 persons or part thereof
One for every 25 persons or part thereof
5.
Drinking Water Fountains
One for every 100 persons with a minimum of one on each floor
One for every 100 persons with a minimum of one on each floor
6.
Baths Preferably Showers
As required for particular trade or occupation
As required for particular trade or occupation
7.
Emergency shower and eye wash fountain
1 per every shop floor per 500 person
1 per every shop floor per 500 person
Table 68: Sanitation Requirements for Factories
• For many trades of a dirty or dangerous character, more extensive provisions are required.
• One water tap with draining arrangement shall be provided for every 50 persons or part thereof in the vicinity of water closet and urinal
Crèche where provided shall be fitted with water closets (One for 10 persons or part thereof), wash basins (1 for 15 persons or part thereof) and drinking water tap with drinking arrangement for every 50 persons or part thereof
Sl. No.
Place
w.c. for Males
w.c. for Females
Urinals for Males only
1.
Junction Stations, Intermediate Stations and Substations
3 for first 1000persons, add 1 for subsequent 1000 persons or part thereof.
8 for first 1000persons, add 1 for every additional 1000 persons or part thereof.
4 for every 1000 person,add 1 for every additional 1000 persons or part thereof.
2.
Terminal Stations and Bus Terminals
4forfirst1000personsand1foreveryadditional 1000 persons or part thereof.
10forevery1000 person and 1 for everyadditional1000personsorpartthereof.
6 for every 1000 person and 1 for everyadditional 1000 persons or part thereof.
3.
Domestic Airports Minimum For 200 persons For 400 persons For 600 persons For 800 persons For 1000 persons
2*59121618
4*1630405258
1 per 40 persons or part thereof.
4.
International Airports For 200 persons For 600 persons For 1000 persons
61218
204058
1 per 40 persons or partthereof.
Table 69: Sanitary Requirements for Large Stations and Airports
Provision for wash basins, baths including shower stalls, shall be in accordance with part ix section 2- Drainage and Sanitation of National Building Code of India.
*At least one Indian style water closet shall be provided in each toilet. Assume 60 % males and40% females in any area.
*At least 50 % of female w.c.s may be Indian pan and 50% Ew.c.
S.N o.
Parti cular
General Standards / Guidelines
1
Publi c
Onroadsandforopenareas:Atevery1km.,includinginparks,plaza,openairtheatre,swimmingare a,carparks,fuelstations.Toiletsshallbedisabled-friendlyandin50-50ratio(M / F). Provision may
Toilet
bemadeasforPublic Rooms(Table4.10 Contd)
2
Signa ge
Signboardsonmainstreetsshallgivedirectionsandmentionthedistancetoreachthenearestpubli cconvenience.Toiletsshallhavemulti-lingualsignagefortheconvenienceofvisitors. Helplinenumber shall bepasted on all toilets for complaints / queries.
Thetoiletshouldhavebothmenandwomenattendants.Alternativelyautomaticcleaningcyclecov eringflush,toiletbowl,seat,handwashbasin,disinfectingoffloorandcomplete dryingaftereachusecanbeadopted,whichtakes40 seconds.Public toilet shall be open 24 hours.
Table 70:General Standards / Guidelines for Public Toilets in Public Area
A4:10. General guidance for water supply arrangements
(i) For new construction: Provision shall be made for underground tank for the storage of water, having capacity at 200 l. per person with adequate pumping arrangements to supply water to upper floors. Filtered water connection will be allowed only for use of drinking and bathing needs. For other purposes i.e. flushing and gardening etc., the individual shall be required to have own arrangements of tube well water within the premises. While according sanction to Layout Plan, the Authority shall make a special mention that provision for space shall be kept for the construction of underground reservoir of adequate capacity along with booster pumping station.
Arrangements as given above shall also be provided in Group Housing Societies.
(iii) The plumbing arrangement in case of new constructions shall be made in a way that the potable water shall be used for drinking, cooking & bathing only and for rest of the uses, provision for ground water can be made with dual piping system
(iv) Low capacity cistern should preferably be provided instead of normal 12.5 L capacity.
(v) Provisions for sustainable methods of Water and Wastewater Management and Water harvesting may be referred from the Chapter of Rain Water Harvesting in these Regulations.
A4:7. Construction Site
(i) At construction job sites, one toilet must be provided per 20 employees. In a work zone with between 21 and 199 employees, a toilet seat and one urinal must be provided for every 40 employees. For 200 or more workers, regulations call for a toilets eat and a urinal per 50 workers. The toilet must be located within 200 m or 5 minute walk.
(ii) Job sites that are not equipped with a sanitary sewer must, unless prohibited by local byelaws, provide privies, in locations where their use will not contaminate either ground or surface water. Other alternatives to a privy could be chemical toilets, re-circulating toilets, or combustion toilets.
(iii) Toilets should be cleaned regularly and maintained in good order, running water, must be provided along with soap and individual hand towels.
A4:8. Temporary Camp Toilets
(i) Toilet facilities shall be provided within 60 m of the, site, which shall not be closer than 15 m of dining area or kitchen. Make sure that toilet area is cleaned at least once per day, it is sanitary, adequately lighted and is employee safe.
A4:9. Special / Contingency Toilets
(i) For Special events like open air theater, religious / political gatherings, mela, etc. for which there are no permanent toilet facilities, contingency toilets / PSUs shall be provided. The following considerations shall determine the number of toilets to be provided for particular event:
a. Duration of the event
b. Type of crowd
c. Weather conditions
d. Whether finishing times are staggered if the event has multi-functions and the following guidelines shall be applied with minimum 50 percent female toilets.
(ii) Special Purpose Toilets: Special toilet facilities shall be adequately provided in public projects (transport terminals / healthcare and other public spaces) in million plus cities for the Third gender with appropriate cleanliness arrangements.
ANNEXURE5: Special Provisions for Nainital
(i) In Nainital Municipal Area only residential construction for One’s own occupancy shall be allowed. No use other than residential shall be allowed only two-stroyed building having maximum height of 7.5m shall be allowed. Maximum covered area as total of covered areas of all the floors of the building shall be 250 sq. mt. Other regulations shalll be as applicable for building operations outside Nainital Municipal area. If the basement is developed then only one floor in addition to the basement floor shall be allowed.
(ii) According the passed G.O. dated10 September, 1992 by the Government in compliance of H’ble Supreme Court 09-03-1995 within the municipal board Nainital no group housing in the jurisdietion Nanital municipal Board shall not be admissible.
(iii) No land sub-division within the jurisdiction Nainital municipal board (accept such sub-division for the permission of the building construction the following documents should be submit in the authority office with his ownership, family prosperty distribution.
a. With shows with or land of land ownership. shall be shows sub-division.
b. Every plot sub-division separate eccess of foot way minimum 2.00 mt. width shall be necessary.
(iv) In Nainital Municipal area a space of at least 3 m in width along entire frontage of the building from the edges of the road must be left open if it subtends any Municipal or Public Work Department road (Service Road, Collector Road, and Major Road)except in the Market othr than those facing the Mail and the motorable roads as following, Viz, 1.2 m in width from the edges of the road must be completely open and thereafter only on open varandah of 1.8 m may be constructed No Mosq.ue, Temple, Church or other sacred building shall be erected unless the frontage is at least 4.5m from the edge of the road. on which it abuts Minimum setback from the line of control width of highways and other P.W.D. schedule road falling within the jurisdiction of Authority should be minimum 3 m or prescribed setback as per the building bye- laws which is maximumt.
(v) The outer covering of all roof must be made of tiles, iron sheets or other approved materials.
(vi) Any space between two blocks of buildings or any other open space or chauk of lane shall not be allowed to be built upon. Any gap or open space in the upper floors or flats between two buildings along the street shall not be raised to the level of the adjoining building.
(vii) No chauks or open spaces or courtyrad or lane in a building shall be allowed to be covered.
(viii) No room or house or building shall be built against a hill or retaining wall. There must be an open space atleast 1.2 m between the building and the hill.
(ix) Not more than three rooms shall be allowed in one row from front to back of the building excepting open verandah and open balcony.
(x) Noconstruction will be allowed generally in any open space, whether private or municipal area in the bazaar areas and in particular in the following areas, open spaces at the back of house no. 17, 18,43 to 56, 59, 83, 84 and 178 to 194 between house no. 244, 245 and 246 behind to the houses of Nay Bazaar in the Tallital Bazaar.
(xi) In place where exposures are poor and structure is not clear, building should not be permitted without excavation to determine the nature of the rocks and structure .
(xii) All masonry buildings are to be built on earthquake proof line i.e. with single unit foundation and stringer courses at each floor level and eave level except the ground floor.
(xiii) No building shal be allowed to be built back to front, excepting where the buildings are at different levels. In case of buildings at different levels the height of front one shall not be allowed to come more than 0.6 m above the plinth level of the rear building . In special circumstances Authority may in its discration give exemption to this provision.
(xiv) The drainage condition should be improved such that no water accumulates and saturates the grounds close to the footing level.
(xv) The foundation of the structures should be kept away from trees and its roots, alluvial soil and unequal or excessive consolidated soil.
(xvi) InNainitlaL city / Municipal area the applicant shall also deposit Debris disposal charges at the rate decided by the P.W.D from time to time.
(xvii) If on any site there are three or more thees in 10 sq. m density permission shall not be give.
(xviii) In case a Religious, Cultural and Historical buildings and landmarks no construction shall be allowed in the periphery of 10 m of that building / landmark.
FORMATS FOR FORMS
AND CERTIFICATES
UTTARAKHAND BUILDING CONSTRUCTION AND DEVELOPMENT BYELAWS/REGULA TIONS 201 1 (201 7)
Form- III [See rule-8.1(ii)] Report by Supervising Engineer to Authority on Stages of Construction of New Building
To The Vice-Chairman / CEO / Chairman. (Name of Development Authority / Local Development Authority / Urban Local Body) Sub:Report of Supervision. Sir,
I hereby certify that the development / erection / re-erection / or material alteration in / of the building in respect of plot No. …….. khasra no: of Development Authority has been carried out, up to foundation level / plinth level / roof casting of floor under my supervision and I certify that the construction has been undertaken in accordance with the approved plan/ structural plans and condition of approval and all the materials (type and grade) and the workmanship of the work are in accordance with the general and detailed specifications of the National Building Code and Bureau of Indian Standards byelaws. The further work shall be carried out according to the sanctioned plans.
Name of the Supervising Engineer …
Office Address
Signature
Registration number
Date
Form IV [See Clause: 2.6] Order for Grant of Permission / Construction Permit / Building Map Approval
No. / ………….. Dated:
Permission under (relevant sub-section)sub-section - of the (relevant Section) Section- ---of the (Name of the relevant Act) is hereby granted in favor of;Smt. / Shri. for
a. Sub-division and/or development of land b. Change of the use of land or building c. Construction of a … (occupancy type of building) building d. Reconstruction of building
e. Alteration or additions in the existing building in respect of Plot No… ,Khasra No Village… of Municipal Corporation / Municipality / NAC / Gram Panchayat within the Development Area of (Name of Development Authority / Local Development Authority / Urban Local Body)subject to following conditions / restrictions.
(i) The land / Building shall be used exclusively for …. purpose and the uses shall not be changed to any other use without prior approval of this Authority
(ii) The development shall be undertaken strictly according to plans enclosed with necessary permission endorsement
Form II (a) Application Form
From
To
Sir,
I / We apply for permission to erect / re-erect / add / alter a building / wall in accordance with the plans submitted herewith on Site no. _; Street no. _; at / Khasra no. , Village (strike out whichever is not applicable)
I / We attach the following plans as required by the Byelaws along with an un-editable compact Disc / DVD or any, other electronic medium permissible by Competent Authority from time to time containing the drawings so submitted
a. Site plan (in triplicate) showing the position of site proposed to be built upon;
b. Building plans ( alongwith elevations and sections) (in triplicate);
c. Service plans (in triplicate);
d. Landscape plan and Contour Plan
e. Structural drawings (for record), as may be applicable;
f. Other plans as required
g. Scrutiny fee @ as decided by the Competent Authority deposited as per prescribed mode
h. Form II (B) duly filled and signed where ever applicable.
i. Form II (C) duly filled and signed where ever applicable.
Signature of the Applicant:
Name of the Applicant:
Address of the Applicant:
Form II (B) Certificate
S. No.
Name Of Personnel Alongwith Registration Number
Declaration
Address & Phone Number
1
.Owner / Owners / Lessee / Authorized Agent
I / we declare that I am / we are the absolute / owner / owners / lessee of the land on which I / we intend to erect the Building and am / are enclosing copies of relevant document of ownership / lease certified by Magistrate / Notary public / a Gazetted Officer.
1
.Owner / Owners / Lessee / Authorized Agent
SIGN:
2
.Builder / Developer / Construction Firm
The construction of the building will be undertaken as per the approved building plans, structural design given by the Structural Engineer, and will be supervised through the following Architects / Engineers:1.2.
2
.Builder / Developer / Construction Firm
Formats for Forms an D Certi Ficates
FO RM I (See ru l e 3) COMMON APPLICATION FORM Perm ission for Deve lopme nt
To be filled by the applicant:
Name of Development Authority / Urban Local Body)
For Office Use:
1. Date of Application
1. FileNo.
2. Address of the Project
2. Date
3. Revenue Village
3. Details ofPayment -Amount
4. Tehsil / ULB Name
4. Details ofPayment -ChallanNo.
5. Location of the Project - Latitude
5. Details ofPayment -Challan Date
6. Location of the Project - Longitude
6. Signature of the Receiving Officer
PART I : GEN ERAL I N FORMATION
(to be fi l l e d i n b y t h e a p p l i ca n t)
1.1 Details of the Applicant
S. No.
Name
Postal Address
Mobile No.
Email Address
Registration Number / License Number along with date of issue
Valid up to
Enclosed ID Proof
1.2 Details of the Land Owner
S. No.
Name of the land Owner(s)
Relationship with Recorded Tenants (Khatadars)
Postal Address
Mobile No.
Email Address
ID Proof
1.3Details of General Power of Attorney (GPA) holders, if any
S. No.
Name of the GPA Holder
Postal Address
Relationship with the land
Details of Power of Attorney
Mobile No.
Email Address
ID Proof
No.
Form V [See Clause- 2.6.] Order for Refusal of Permission
By Speed Post
(Name of Development Authority / Local Development Authority / Urban Local Body).No. / ……. Date-
To,
Mr. / Mrs. ……….
Ref:Refusal of Permission for Application Registration No ……. / 20.
Your reply to this office letter number Dated has not beenfound satisfactory and in compliance to the provisions of building and development norms in force, you have failed to show any cause in response to this office letter No Dated within the prescribed time stipulatedin the above referred letter.
Hence, in exercise of the powers under sub-section ---- of section-----of the Development Authority Act, ---------, your application for permission to undertake development on plot number / khasra number. of.(Name of Development Authority / Local Development Authority / Urban Local Body)area is hereby refused on the following grounds.
1………………………… …….
2……………………………
Two copies of the plans are retained in this office for record and reference and the rest are returned herewith.
By Order
Authorized Officer
(Name of Development Authority / Local Development Authority / Urban Local Body)
Letter No. / ……….. Dated
Form VI (See Clause – 2.14(1)) Application for Permission to Occupy
From
To
Sir,
I / We hereby give you notice that the building / part-of-building described below and sanctioned vide your order No ……., dated ……., has been completed on …. in all respects according to the sanctioned plans and the structural design made for the same and the suggested modifications have been carried out.
S. No.
Particulars
Details
1
Description of Building (Occupancy Type)
2
Plot No.
3
Khasra Number
4
Village
5
Street Name
6
House Number (if any)
7
Site Number
8
Colony & Sector
9
City / Town
10
Name of the Owner
11
Permanent Address of the Owner
12
Mobile Number of the Owner
13
Email Address of the Owner
We further declare that,
a. The modifications made to the building plans and carried out at site during the course of construction are submitted herewith(as per clause 2.10):
b. Corresponding to the above modifications made in the building plans, the necessary amendments were also carried out in the structural design and implemented at site.
c. Completion notice from the architect& supervision engineer who supervised the construction of the building is submitted herewith.
d. Photographs (all 4 sides) of the completed building have been attached herein
e. Form VI-A and Form VI-B, duly signed
f. Kindly issue an occupancy certificate as required under Uttarakhand Building Byelaws, 2017
Owner / Applicant
Form VI (a) (See Clause- 2.14(1)) Completion Notice by an Architect
From
To
Dear Sir / Madam,
I do hereby certify-
a. That the following work has been supervised by me and has been completed to my satisfaction in accordance with the sanctioned plan
b. That no deviation from sanctioned plan is made while constructing the building / deviation from sanction plan is made (details as below) and these deviations are duly shown on completion drawings. Due to these deviations, human safety has not been compromised (strike off whichever is not applicable).
c. That the workmanship and the whole of the materials used are good; that no provision of the UTTARAKHAND Building Byelaws, 2017 and no requisition made, conditions prescribed or order issued there under has been violated in the course of the work.
d. That the compliance of following provisionshas been done, as per the sanctioned plan (tick whichever is applicable):
ECBC
GREEN BUIDINGS
RAINWATER HARVESTING
Details of construction on (floor-wise along with covered area on each floor) City.Street Plot No. House No. (if any) (or)Khasra no Village
Name………
Full Address…
Signature………
Email Address
Mobile Number …
Registration Number
Date
Form VI (B) [See Byelaws 2.14(1): 8.1(ii)] Completion Notice by Supervision Engineer
From
To
Dear Sir / Madam,
S. No.
Particulars
Details
1
Description of Building (Occupancy Type)
2
Plot No.
3
Khasra Number
4
Village
5
Street Name
Form Sc-ii (See Byelaws 2.2(2) Certificate for Structure Conforming under Self-certification
Plot No…
Sector…………
Colony…
City / Town……………..
Name of the Owner…
Complete address of the owner…
It is hereby certified that the plans submitted in Form CS-I for the building detailed above are in conformity with the UTTARAKHAND Building Byelaws-2017 and the approved Master Plan / zoning plan of the plot. The structure has been designed in accordance with the provision of National Building Code for structure’s resistance to earthquakes and other natural hazards. The local soil conditions, its load bearing capacity and the underground water table etc. have been kept in view while designing the same.
Dated.
signature of Owner
Signature of Architect
Signature of Structural
Engineer
(No digital signatures are required)
Mobile no.
E-mail
PART-B
Habitat Projects outside Controlled Areas
Registration of Developers (RHD)
FORM VII (See Byelaws 2.14 (5)) OCCUPANCY CERTIFICATE
From
To
Dear Sir / Madam,
Whereas Shri / Smt. / M / s …………. has applied for the issue of an occupation certificate in respect of the building described below:
S. No.
Particulars
Details
1
Description of Building (Occupancy Type)
2
Plot No.
3
Khasra Number
4
Village
5
Street Name
6
House Number (if any)
7
Site Number
8
Colony & Sector
9
City / Town
10
Name of the Owner
11
Permanent Address of the Owner
12
Mobile Number of the Owner
13
Email Address of the Owner
We hereby declare that the work of erection, re-erection and or material alteration has beencompleted under thesupervision of Architect (Registration number No Structural Engineer (Empanelment No .) Supervisor., (Empanelment No. ..) as per the Completion Notice submitted.
On inspection it is observed that the erection, re-erection and or alteration undertaken with respect to above (Building) is in / not in accordance with approved plan and the conditions imposed vide Permission letter No. . dated
The building is permitted / not permitted for part / full occupancy subjected to thefollowing 1. 2.
One set of completion plans duly certifiedfor occupancy is returned herewith.
By Order
Authorized Officer
(Name of Development Authority / Local Development Authority / Urban Local Body)
Letter No. / ……….. Dated
Copy along withcopies of the approved plans are forwarded
herewith to Smt. / Shri.
Authorized Officer
H:2. Registration Fee
Only such application with complete documents in support of fulfilling the registration criteria, shall be considered for registration criteria, shall be considered for registration. Incomplete applications or such applications, which fail to fulfill the requisite minimum qualifying criteria, shall be rejected. In such cases, the applicant can however re-apply with requisite registration fee and complete documents.
Category
Registration Fee / Renewal Fee
Payment Mode
A
Rs. 50,000 / -
A non-refundable payment as set out below, through Treasury Challan payable at S.B.I., Main Branch, Dehradun, shall be made to DoH, at the time of submitting the application
B
Rs. 40,000 / -
C
Rs. 30,000 / -
D
Rs. 20,000 / -
Table 72: Registration / Renewal / Upgradation Fee for RHD
H:3. Registration / Renewal / Upgradation
a. Registration shall remain valid for a period of 4 (Four) years from the date of registration. It is mandatory for all the Registered Habitat Developers to submit a habitat project within two years of registration, failing which, the registration will be cancelled. The Registration Habitat Developer (RHD) shall be required to renew / upgrade {as the case may be} the registration, based upon the proof provided by the Developer continuing to meet the registration criteria of renewal / up gradation of RHD.
b. Registration of RHD’s against whom fraud have come to notice and investigations initiated, shall be kept in abeyance until the time the matter is resolved.
c. Application for the renewal / up gradation of registration has to be submitted to DoH / Competent Authority at least one month before the date of expiry of said Registration and in no case not later than seven days before the expiry of said Registration date. For renewal and upgradation, a non-refundable payment as set out in 1.0table above, through Treasury Challan Payable at S.B.I Branch, Dehradun shall be made to DoH at the time of Renewal / up-gradation RHD can also apply
for up gradation of category after completion of at least one year of registration, provided the requisite criteria for the desired category are met.
H:4. Criteria for Registration by DoH
Habitat Category
Average Turnover for the past two years
Net Worth at the end of most recent financial Year
A
Rs. 25 crores
Rs. 5 Crores
B
Rs. 15 crores
Rs. 3 crores
C
Rs. 5 Crores
Rs. 2 Crores
D
Rs. 3 Crores
Rs. 1 Crore
Table 73: Criteria for Registration by DoH.
H:1. Registration of Developers (RHD)
Registration of Developers as Registered Habitat Developer (RHD) is essential to carry out habitat projects in the areas lying outside the Development / Special Development areas. RHD will be registered into A, B, C, D categories based upon their annual turnover, net worth. Above four categories can carry out habitat development projects upto the limit as follows.
Category
Habitat Type
Plains
Hills
D
Sub Cluster
Upto 0.20 to 2.0ha
Upto 0.10 to 1.0ha
C
Cluster
Upto 2.01 to 6.0 ha
Upto 1.01 to 3.0 ha
B
Neighborhood
Upto 6.01 to 20.0 ha
Upto 3.01 to 10.0 ha
A
Township
Upto 20.01 to 40.0 ha
Upto 10.01 to 20.0 ha
Table 71: Categorization of RHD
Note
Except for category A, at least one financial criteria (either turnover or net worth) shall be required to meet to qualify
In case of an individual, the Applicant shall be required to meet 50% of the Qualifying Criteria of net worth The Applicant for registration shall be from any of the following types:
o Company, incorporated under Companies Act 1956 (or equivalent law abroad)
o Proprietorship Firm / Partnership Firm
o Individual / Housing society registered under Societies Registration Act, 1860.
Net Worth Calculation
o For Company= (Issued, Subscribed, Paid-up Equity and Share application money+ Reserves)– (Revaluation reserves+ Miscellaneous expenditure not written off)
For Proprietorship Firm / Partnership Firm = Aggregate of capital account + Reserves-Aggregate for drawing by the proprietor / partners-Aggregate of advances to proprietor / partners.
o For Individual / Housing Society = Sum of fixed deposits / time deposits / bank deposits in scheduled banks in India / units of Mutual Funds registered in India, as on latest Financial Year (March 31) shall be used for evaluation of Net Worth.
o In addition to the above, all immovable property in the form of lands and / or building free from all encumbrances within the state of Uttarakhand can also be considered in evaluation of Net Worth. The value of land will be based on valuation on the basis of prevailing circle rate / rate fixed by the DistrictCollector and Valuation of buildings will be based on valuation by approved valuer.
Annual Turnover Calculation
o For Company= Net Revenue= Total Revenue- (Excise Duty+ Sales Tax, VAT, GST)
o For Proprietorship Firm / Partnership Firm= Net Revenue = Total Revenue –(Excise Duty-Sales Tax, VAT, GST)
For individual- Not applicable
H:6. Processing, Land Upgradation and Compounding Charges
a. Processing charges@ Rs. 50,000 per hectare (or rates as decided by the government from time to time) will be charged for all Habitat Projects which will be calculated on the basic of the total project area.
b. Processing charges for revised Habitat Project shall be one fourth of the charges currently applicable.
c. Land falling within the Habitat Project will be considered as open / undeveloped land and development of Habitat Projects on such lands will entail up gradation of infrastructure in the area which will subsequently lead to value addition in the long run. To offset the cost of up grading the existing infrastructure or providing new / additional infrastructural services land up gradation charges will levied on all such projects. Such charges will be as the prevailing charges as decided by the government.
d. All offences related to deviations against the sanctioned Habitat Project, which are compoundable in nature, can be compounded by the sanctioning Authority only after a formal request has been made to the authority by the Habitat developer in this regard.
e. The compounding regulations, procedure and rates will be the same as applicable in the development authorities in the state. The charges related to the processing, approval and compounding of Habitat Project will be deposited vide treasury challan in Government Head 0217- “kHzfork] 03 NksVs,oa e / ;e uxjksa ds lesfdr fodkl] 800 vU; izkfIr;ka] 99& vU; fofo / k izkfIr;kaA
H:7. Bank Guarantee / Mortgaged Property
a. An amount equivalent to 25% of the proposed development cost of the project shall be deposited by the Habitat Developer as Bank Guarantee with the Sanctioning Authority or saleable land parcel (of a value of such equivalent sum) be mortgaged by theHabitat Developer in favor of the Sanctioning Authority.
b. After ensuring a minimum of 40% of the developmental works being satisfactorily completed, an equivalent sum of bank guarantee or mortgaged plot / saleable land parcel shall be released by the sanctioning authority.
c. The final 15% of the Bank Guarantee / mortgaged property will be released after issuing of occupancy certificate by the sanctioning authority.
d. Recommendation for part / full release (as the case may be) of Bank Guarantee / mortgaged property by the sanctioning authority within one month of the receipt of such request made by the Habitat Developer is mandatory. However, such a recommendation has to be based on the required developmental works being carried out to the satisfaction of the sanctioning authority.
e. Within 15 days of the date of such recommendation the Bank Guarantee / mortgaged property has to be released in favor of Habitat Developer, failing which a penalty of a minimum of 0.1 percent per day on the amount of Bank Guarantee / mortgaged property will be imposed.
H:5. Approval Process – Map Approval
a. As per the provision of G.O No. 3412 / v-vk / 06-115 / ¼vk½ 2006 dated 7th December 2006. Registered Habitat Developers who plan to develop Habitat Project falling in areas outside the notified Regulated Areas / Development Areas / Special Development Areas will have to submit the proposal in Town and Country Planning Department, Government of Uttarakhand.
b. The Town and Country Planning Department will be the sanctioning Authority for such project. Before granting such sanctioning the department shall technically scrutinize the proposed as per the building Byelaws and shall seek No. objection certificate from various departments such as Revenue, Forest, Fire, PWD, Pollution Control Board, Jal Nigam, Electricity Department, Geology department etc. wherever such NoC are required.
c. The registered Habitat Developer, along withthe necessary NOC’s from various department, shall submit a notarized indemnity bond and land ownership record along with an agreement for setting up of RWA (or a similar association as found necessary) on a stamp paper of Rs. 100 and Rs. 50 respectively.
d. For special Town ship project (i.e. project having an area of more than 20.0 hectares in plains and more than 10.0 hectares in) the proposal shall be submitted in Housing department of government of Uttarakhand. The approval of such project will be as per procedure / direction issued by a committee to be formed under the Chairmanship of Secretary, Housing, Government of Uttarakhand.
H:8. Occupancy certificate
Occupancy certificate for various categories of Habitat Project.
a. If is mandatory for all Habitat Developers to complete of projects and get occupancy certificate from the Sanctioning Authority. The following time line of various category of Habitat Project are determined from their date of approval.
Sr. No.
Habitat Category
Time Lines
1
Sub Cluster
2 years
2
Cluster
3 years
3
Neighborhood
5 years
4
Township
8 years
Table 74: Timeline of approval for Habitat Projects
b. In cases of force majore or under special circumstances and in cases where the development works of the project is proceeding satisfactory, the above time lines can be extended for one year (maximum of 2 year extension). Further the period can be extended one last time for another one year along with delay penalty of minimum 10 percent of the project cost.
c. In case where occupancy certificate is not obtained by the Habitat Developer within the stipulated time extension of the project, the developer will forfeit the Bank Guarantee (in which ever form available) which will be used by the Sanctioning Authority to complete the incomplete developmental works.
d. The Habitat Developer shall, after completing the required development works, inform the sanctioning authority. And if the development works are found to be satisfactory by the sanctioning authority, the authority shall issue the occupancy certificate within one month from the date of such request made by the developer.
PART -C
S:4. Building Permit Bye Laws
Building permit fee, completion fees, temporary structures permit fees and calculations thereof:
(i) The applicant shall deposit building permit fees as stipulated by SIDA from time to time. The present scale of fees for building permit is as follows:
a. Industrial Buildings - Rs. 5 / - per sq. mt. of covered area on all floors
b. Residential Buildings - Rs. 2 / - per sq. mt. of covered area on all floors
c. Commercial Buildings - Rs. 10 / - per sq. mt. of covered area on all floors
d. For all other type of Buildings - Rs. 10 / - per sq. mt. of covered area on all floors
e. Completion-cum-Occupancy Fees - Rs. 4 / - per sq. mt. of covered area on all floors
f. The applicant shall deposit development permit fees @ Rs. 1 / - sq. mt. fordeveloping private Industrial estate / area
g. In case of revision of layout plans, fees will be 1.25 times that of normal fees for the portion of the layout, which is re-submitted for sanction
(ii) If the use of the buildings is changed, then the fee in case of additions and alterations shall be calculated with reference to the use proposed. (As per G.O. of Avas Anubhag, Govt. of Uttarakhand)
(iii) In case of re-erection of an existing building after demolition, fees chargeable shall be the same as for a new building
(iv) The fee for revisions to plans for a building which has already been sanctioned shall be one fourth of the fee chargeable for the sanctioned plan, provided the covered area of the building has not increased from that original in sanctioned.
(v) The area covered in the basement, service floors & non-FAR shall be added in the covered area for purpose of calculation of fees.
(vi) The fee in case of buildings with principal and subsidiary occupancies, in which the fees leviable are different than the fees for the total building scheme, shall be as per rates for individual occupancies.
(vii) The revalidation fee of a building permit shall be 20 percent of the original building permit fee paid with the application, if the application is made within the period of validity of the building permit. Otherwise, the process starts afresh with all fees leviable at extant rates. In case the building is under construction as per sanctioned plans and the application is made after the validity period, the revalidation fee shall be the original building permit fee.
(viii) In case of construction without issue of building permit or fees accompanying application for building permit, a penalty shall be levied as per provision of Compounding Bye Laws.
S:6. Scrutiny of the Building Permit
(i) The Authorized Officer of SIDA shall verify or cause to be verified the facts given in the application for permit, and enclosures. The title of the land shall also be verified wherever applicable.
(ii) For all buildings, Technical Persons shall provide all necessary information including provisions of fire safety requirements, public convenience, safety provisions and other relevant laws as per Factories Act. Technical Persons shall be primarily responsible for implementation of all other provisions as per Building Regulations, Planning and Development Directions, National Building Code, ISI byelaws and such other provisions as required by the SIDA from time to time.
(iii) The Owner and Technical Persons shall jointly indemnify SIDA against violation of Building Regulations, Planning and Development Directions and provisions of National Building Code in the form given in Appendix 5.
(iv) SIDA, reserves the right to perform test checks by complete scrutiny of any of the plans submitted for approval.
(v) In case of any violation, the Architect / Engineer / Town Planner shall be blacklisted in the records of SIDA for five years under intimation to Council of Architecture / Institution of Engineers or Institution of Town Planners, India, as appropriate, and no documents / drawings under his / her signature will be acceptable to SIDA for any application.
(vi) In case the Owner is found responsible, the plot may be cancelled or other action taken as decided by the CEO depending upon the circumstances of each case.
Sida Bye-laws
S:1. Applicability: Applicable in areas notified under SIDA.
(i) Household / Service Industries
a. Household industrial units with maximum 5 workers and 5 kilowatt power may be allowed to continue in residential areas and new industrial units of this type could be permitted in residential areas subject to the condition that no polluting industrial unit shall be permitted as household industry.
b. The industrial units could be permitted only after registration by the DIC, Govt. of Uttarakhand and clearance from the Pollution Control Authority
c. Household industrial units would be allowed to the extent of 25% of the floor space or 30 sq. mt., whichever is less. Further additions / alterations to the list of Household Industries could be made if considered appropriate and in public interest by the Central Government to do so.
d. No inflammable or hazardous material is permitted to be stored
e. To set up a household industry, separate industrial electric connection (single phase), would be necessary. So would be the Municipal license
f. List of Household / Service Sector activities is given in Appendix 16.
(ii) Flatted Industries
a. Flatted Industries as defined in NBC 2005, “A premise having a group of small industrial units having upto 20 workers with common services and facilities with non-hazardous non-pollution performance.”
b. The groups permitted under Flatted Industries are all industries except those prohibited. Nonpolluting & excluding industries producing noise / water / vibrations / odorpollution.
S:2. Minimum Size of Industrial Plots
Types of building
Plains
Hills
Minimum Approach Road (mt.rs.)
Minimum Plot Size (sq. mt.)
Minimum Approach Road (mt.rs.)
Minimum Plot Size (sq. mt.)
Household / Service Units
12.0
200
6.00
175
Industrial Units
15.0
450
7.50
300
Table 75:Minimum Size of Industrial Plots
S:3. Temporary Occupation
S:7. Sanction or Refusal of Building Permit
(i) After filing of the application for building permit as per Appendices 1 to 5 duly certified by qualified Technical Persons and Owner, the applicant can commence construction as per provisions of the Deemed Sanction Scheme in 17.02, but nothing shall be done which violates the BBL-2016. The Authorized Officer shall scrutinize the building permit and CEO or his authorized officer may either sanction or refuse a building permit or may sanction it with such modification and communicate the decision to the applicant in the prescribed form given in Appendix-6.
(ii) Within thirty days of the receipt of the application as per BBL-2016 norms, if refusal or sanction is not granted, the application with its annexure shall be deemed to have been allowed and the permit sanctioned; provided such fact is immediately brought to the notice of the CEO, in writing, by the
applicant, within twenty days after the expiry of the period of thirty day’s enclosing certificate of architect in the prescribed form given as Appendix 10. But nothing herein shall be construed to authorize any person to do anything in contravention of these Regulations and Planning and Development Directives prepared by Govt.
(iii) In case of refusal, the Authorized Officer shall give reasons and quote the relevant provisions of the regulations which the plan contravenes, as far as possible in the first instance itself, and ensure that no new objections are raised when they are re-submitted after compliance.
(iv) Once the plans have been scrutinized and objections, if any, have been pointed out, the applicant shall modify the plans to comply with the objections raised and resubmit them. If the objections remain unresolved for a period of one year, the permit shall be refused.
S:8. Appeal Against Refusal or Sanction with modifications of a Building
Any applicant aggrieved by an order of refusal of a building permit or its sanction with modifications, may within thirty days from the date of communication of such order, appeal to the CEO or Officer Authorised for it. The decision of the CEO / Authorised officer on such appeal shall be final, conclusive and binding.
S:9. Duration of Validity of a Building Permit
(i) A layout / building permit sanctioned under these regulations shall remain valid for the period specified in the lease deed conditions and the Completion Certificate has to be submitted within this period. In special case or category of cases, depending on the nature of formalities remaining unfulfilled, the CEO may extend this period for submission of completion certificate as he may deem fit. The nature of such formalities and period for extension may be specified by a general order or guideline issued by the CEO. In case part completion has been taken on the plot then validity of layout / building permit shall be for 5 years.
(ii) Validity of temporary structures shall be 5 years or the period specified in the lease deed conditions whichever is earlier. If the period specified in lease deed is less than 5 years, then beyond this period any request for extension, will be granted only in extraordinary circumstances on a case to case basis by the CEO subject to adequate justification & on payment of prescribed fees. In case period specified in lease deed is more than 5 years then extension shall be granted in multiple of 2 years after approval of the CEO.
(iii) After lapses of validity period this applicant is liable to remove all such structure and certificate shall not be granted without removal of such structures.
S:10. Additions or Alterations During Construction
If any external additions or alterations from the sanctioned plans are intended to be made, permission of the CEO shall be obtained in writing before the proposed additions / alterations are carried out. It shall be incumbent upon the applicant to whom a building permit has been sanctioned to submit amended plans for such additions or alterations. The provisions relating to an application for permit shall also apply to such amended plans with the modification that the time limit referred to in 17.02 shall be thirty days instead of twenty.
S:11. Cancellation of Permit for Building Activity
At any time after the permit has been sanctioned to proceed with any building activity, if the CEO finds that such permit was sanctioned in consequence of any material misrepresentation or fraudulent statement contained in the application given, or the information furnished, the CEO may cancel such permit and any work done there under, shall be deemed to have been done without permit. The Technical Persons found responsible for the same shall be blacklisted and debarred from practicing in SIDA jurisdiction for 5 years. If the Owner is found responsible, the plot may be cancelled or any other such action taken as deemed fit by CEO depending upon the circumstances of each case.
S:12. Work according to Master Plan & Zoning Regulations of Competent Authority
Neither granting of the permit nor the approval of drawings and specification, nor inspection made by the SIDA during erection of the building shall in any way relieve the Owner of such buildings from full responsibility for carrying out the work in accordance with the requirements of Master Plan / Zoning Regulations / or Planning and Development Directions. In case any violations are found during construction or after completion the owner shall be required to rectify the same to the satisfaction of the CEO / SIDA within a period of 15 days from the time such violations are intimated to the owner. In case the owner fails to comply, CEO / SIDA shall ensure compliance and the expenditure incurred in doing so shall be recovered from the owner before issue of completion certificate. In case completion certificate has already been obtained, such expenditure shall be recovered from the owner, if not paid within stipulated time, as arrears of land revenue
S:13. Documents at Site
The following documents are to be kept at site during the construction of the buildings and for such a period thereafter as required by the SIDA:
a. A copy of building permit.
b. Copy of approved drawings.
c. The CEO may authorize any person to enter into or upon any land or building with or without assistants or workmen for the purpose of
d. Making any enquiry, inspection, measurement or survey or taking levels of such land or building.
e. Examining works under construction.
f. Ascertaining whether any land is being or has been developed in contravention of the master or zonal or approved plan or Regulations.
g. Doing any other thing necessary for efficient administration or the Regulations.
S:14. Notice of Completion
Every Owner will have to submit a notice of completion of buildings to SIDA as per Appendix 7, accompanied by the documents mentioned therein.
S:15. Occupancy Certificate necessary for Occupation
Buildings erected, re-erected or altered, shall not be occupied in whole or part until the issue of occupancy certificate by the CEO in the form given in Appendix 12. If the CEO fails to issue the occupancy certificate or send any intimation showing his inability to issue such certificate within 40 days of the date of receipt of completion certificate, the building may be occupied without waiting for such certificate. Provided intimation to this effect is sent to SIDA by the owner before occupying the same.
S:16. Compounding Bye Laws
The Guiding Principles for Composition of Offences under Section
(i) Offences committed by the following, shall not be compounded:
Development in violation of the proposals of the Master Plan and Zonal Plans.
b. Development of land which is either wholly or partly, a public premise as defined inThe Public Premises (Eviction of Un-authorized Occupants) Act, 1972.
c. Construction within the prescribed front open space (setback).
d. On the first floor of constructions within the prescribed side and rear open spaces (Setbacks) which have been compounded earlier
e. If the FAR of the construction exceeds the prescribed FAR by more than 20%
f. Construction exceeding the prescribed height of a building by more than 2mt.
(ii) For carrying out of development without obtaining prior permission of the CEO, or when the development is not in accordance with sanctioned plan, in such a way that the BBL-2016 and the bye-laws are not contravened, the offence may be compounded after charging the composition fee at the following rates:
S. No.
Activity
Compounding Fees
1
Development of land
Rs. 100 per sq. mt. of the area underdevelopment
2
Erection, re-erection, addition or alteration or abuilding
Rs. 200 per sq. mt. of the covered areaerected, re-erected, added or altered
3
Construction of boundary wall
Rs. 100 per running mt.
Table 76: Compounding Charges based on type of activity
(iii) For carrying out development either without prior permission of the Managing Director or in contravention of the sanctioned plans, in such a way that the provisions of the Act(BBL-16) or the bye-laws have been contravened, the offence may be compounded after charging the composition fee at the following rates:
S. No.
Activity
Compounding Fees
1
Development of site
Rs 200 per sq. mt. of the Area under development *
(iii) Parking space measuring …… ……. sq. mt. as shown in the approved plan shall be exclusively used for parking and no part of it will be used for any other purpose
(iv) The land over which construction is proposed is accessible by an approved means of access of ……………………mt. width.
(v) The land in question must be in lawful ownership and peaceful possession of the applicant
(vi) Applicant shall free gift ……….sq. mt. of locatedin the. -Development Area /Municipal Corporation / Municipality / NAC / Gram Panchayat for the widening of the road / construction of new roads and other public amenities prior to completion of the development as indicated in the plan
(vii) The permission is valid for period of … years with effect from the date of issue
(viii) Permission accorded under the provision of Building Byelaws, cannot be construed as an evidence to claim right title interest on the plot on which the permission has been granted
(ix) If any dispute arises with respect to right, title interest on the land on which the permission has been granted, the permission so granted shall be automatically treated as cancelled during the period of dispute.
(x) Any construction and development made by the applicant or owner on the disputed land will be at his risk without any legal or financial liability on the Authority
(xi) The building shall be mandatorily required to apply for Completion-cum-Occupancy Certificate and unless such permission has been granted by the (Name of Development Authority / Local Development Authority / Urban Local Body) will not commence operations of any nature in the building (xii) The building shall be required to apply for Renewal of Occupancy Certificate every 3 / 5 years based on the moderate risk / high risk nature of the building
(xiii) Any other conditions.
By Order
Authorized Officer
(Name of Development Authority / Local Development Authority / Urban Local Body)
Letter No. / ……….. Dated
Copy along withcopies of the approved plans are forwarded herewithto Smt. / Shri.
Authorized Officer
(Name of Development Authority / Local Development Authority / Urban Local Body)
Letter No. / ……….. Dated
SI/GN:
3
.Architect
I / we have gone through the Building Regulations made under the provisions of the Building Byelaws and have satisfied myself / ourselves that the site and building plans are in accordance with provisions contained therein.
3
.Architect
SIGN:
4
.Supervision Engineer
The construction of the building will be undertaken as per the approved building plans, structural design given by the Structural Engineer, and will be supervised by me,
4
.Supervision Engineer
SIGN:
5
.Structural Engineer
The structural drawings have been prepared with the provisions of the National Building Code and the relevant Indian Standard Byelaws (with latest amendments) including Bureau of Indian Standard Byelaws for structures resistant to earthquakes and other natural hazards. The local soil conditions, its load bearing capacity and the underground water table etc. have been kept in view while designing the same. In addition, the structural safety/ stability of adjoining existing buildings has been ensured.
5
.Structural Engineer
SIGN:
S. No.
Name Of Personnel Alongwith Registration Number
Declaration
Address & Phone Number
6
.Supervisor / Surveyor
I / we have gone through the Building Regulations made under the provisions of the Building Byelaws and have satisfied myself / ourselves that the site and building plans are in accordance with provisions contained therein.
6
.Supervisor / Surveyor
SIGN:
7
Engineer/ Structural Engineer/ Geotechnical Engineer (for high rise buildings)
we certify that we have carried out subsurface investigation at site and have performed various tests required to determine engineering properties of soil substrata and ground water based on which we have given recommendations about the type of foundation, soil bearing capacity and the depth at which the foundations shall be placed, considering the structural system and loads supplied by the structural engineer to enable the engineer/structural engineer to design the foundations and other structures below ground, as stipulated in National Building Code of India and its Part 6 .Structural Design, Section 2 Soils and Foundations. and other relevant Codes.
7
Engineer/ Structural Engineer/ Geotechnical Engineer (for high rise buildings)
SIGN:
8
.Town Planner
I / we have gone through the Building Regulations made under the provisions of the Building Byelaws and have satisfied myself / ourselves that the site and building plans are in accordance with provisions contained therein.
8
.Town Planner
SIGN:
9
.Fire Officer
I / we have gone through the Building Regulations made under the provisions of the Building Byelaws and NBC FOR FIRE SAFETY and have satisfied myself / ourselves that the site and building plans are in accordance with provisions contained therein. SIGN:
10
.Third Party Auditor (For Buildings More Than 15 M. In Height)
I / we declare that the structural design has been checked and has been found to be in order. The design is in accordance with the provisions of the National Building Code and the relevant Bureau of Indian Standard Codes (with latest amendments) including Bureau of Indian Standard Codes for structures resistant to earthquakes and other natural hazards. The local soil conditions, its load bearing capacity and the underground water table etc. have been kept in view while designing the same. SIGN:
Form II (C) Combined Indemnity Bond for Basement/ Any Structural Change to Existing Building
This Indemnity Bond is executed by Shri / Smt. S / o, D / o, W / o Shri /Smt. R/ O .in favor of (Name of Development Authority / Local Development Authority)
Whereas the executants has submitted to the concerned Authority the plans for,sanction of basement/ structural change to existing building over Plot No… …………under the provisions of the Act and byelaws made there under:
And whereas the concerned Authority has agreed to sanction the aforesaid construction subject to the conditions that the owner shall indemnify the concerned Authority in the event of any loss or damage being caused to the adjoining building on account of the construction of the said basement/ structural change to existing building either at the time of digging of its foundations or in the course of its construction or even there after and also against any claim of any concern thereto.
And whereas the executant has agreed to execute an indemnity bond to the above affect and also to abide by the terms imposed by the concerned Authority to the grant of sanction for construction of the basement/ structural change to existing building.
Now this deed witnesses:
That in consideration of the sanction of the plans by for construction of the basement/ structural change to existing building, the executant undertakes that he / she shall at all times keep… …harmless and free from any liability, loss or damages / flowing from any injury or damage caused to the adjoining built-up properties or to any person as a consequence of the construction of basement/ structural change to existing building, at the time of digging of its foundations or during the course of its construction or at any time thereafter.
The owner agreed and undertakes that in the event of any claim being made by any person or persons against the concerned Authority either in respect of the sanction granted by the concerned Authority to the owner for the construction of basement/ structural change to existing building or in respect of the construction or manner of construction of the basement/ structural change to existing building , by the owner or the consequences flowing from the said sanction the executant shall be responsible and liable and not the concerned Authority.
The executant agrees and undertake to indemnify the concerned Authority fully in respect of any amount which the concerned Authority may be required to pay to any person either by way of compensation or damages or on any other account as a result of any claim or suit or any other proceedings concerning the sanctioning of the construction of the basement/ structural change to existing building and also in respect of the costs and expenses which the concerned Authority may incur on defending any action.
Without prejudice to the above undertaking the executant hereby binds itself to pay to the concerned Authority to the full extent any amount which the concerned Authority may be required to pay to any person in connection with, relating to or concerning the sanctioning of the basement/ structural change to existing building , or the making thereof.
The owner further agrees and undertakes that this bond shall remain in full force and effect till the executant faithfully observes / performs the undertaking herein before contained.
In witness where of the executants above named has signed this bond on this… of ………………….at……
Name……… 2. Full Address…………………… 3. Signature…
Witness 1 1. Name… 2. Full Address… 3. Signature…
Name……… 2. Full Address………………… 3. Signature…
Date
Valid up
Page 1 69
UTTARAKHAND BUILDING CONSTRUCTION AND DEVELOPMENT BYELAWS/REGULA TIONS 201 1 (201 7)
owner(s)
to(date)
1.4Details of Technical Persons including Architects, Structural Engineers etc.
S. No.
Category ofTechnical Persons
Name
PostalAddress
MobileNo.
EmailAddress
Details of theRegistering / Licensing Authority
No. and Date ofRegistration / License
Valid upto(date)
ID Proof
1.5.1
Architects
1.5.2
Structural Engineer
1.5.3
Electrical Engineer
1.5.4
Site Supervisor
1.5.5
Any other, specify
PART II : BASIC DETAI LS OF TH E PROJ ECT
26.
25.
2.4
23.
2.2
2.1
S.N o.
<sub>o</sub> N o.<sub>f</sub> ge Ut Dwllinni s
<sub>o</sub> N o.<sub>f</sub> oos Flr
<sub>o</sub> T <sup>a</sup>t<sup>l</sup> <sub>A</sub> ea coeedrvr i n a<sub>ll</sub> f<sub>l</sub> o o <sub>s</sub>r s q. m t.
(p<sub>l</sub> P<sub>r</sub> <sub>ease</sub> <sub>j</sub>o<sub>ect</sub> y)p secif p Cooetmnn(<sub>e</sub>R s i d e <sub>t</sub>n <sub>a</sub>i l/C o m m e<sub>cr</sub> <sub>a</sub>i l/I n s<sub>t</sub> uttii o<sub>n</sub> a<sub>l</sub>/I dustnri a<sub>l</sub>/<sub>u</sub> P b l i c-s e m i-p u b l <sub>c</sub>i/O t h e r s
c P o r <sub>emm</sub> <sub>j</sub>o<sub>ect</sub> ca /sutttril Ini gy(CaeoGtr <sub>o</sub><sup>i</sup> <sub>o</sub> t anl G/ +I 3 n , <sup>d</sup><sub>u</sub> A s p tri ar a t l m / e P n t u b<sub>li</sub> - cs- G+ e 4 <sup>m</sup><sub>i</sub> a - n p d u <sup>b</sup><sub>li</sub> a c / bov o<sub>th</sub> ,e <sup>e</sup><sub>r</sub> G s or P u ease sl pous h p i n e c g, i<sub>f</sub> y) M u l t i-s t o <sub>e</sub>r y e d r e s i d e<sub>n</sub> t i a<sub>l</sub>/
P<sub>r</sub> <sub>j</sub>o<sub>ect</sub> y (pee tNw D e evl o p m e<sub>n</sub> t/A d d tii o n/A<sub>l</sub> <sub>e</sub>t <sub>a</sub>r t<sub>i</sub> o n/<sub>e</sub> R <sub>e</sub>n <sub>a</sub>w/l <sub>ead</sub> R<sub>vli</sub> a t i o n)
P a r a m e<sub>te</sub> r
D e t a i l s
A ( u F t o h V r o i r e Of iz w f e s c<sup>i</sup> <sup>d</sup> o e o f U ffi th s c e e e)r*
Auth orized Office r – An officia l of th e Authority who h as bee n authorized to check and certify su ch detai l s
Page 1 70
UTTARAKHAND BUILDING CONSTRUCTION AND DEVELOPMENT BYELAWS/REGULA TIONS 201 1 (201 7)
PART I I I : LAN D DETAI LS
(to be fi l l e d i n b y t h e a p p l i ca n t)
N a eoeessotmfhLr
3.5I oefn l a,se saedeasthril oeasfl e
3.4I dcatni e yeacoad Tnnfln (easel ohl d/fr e eh ol d/o p,eseathrl se p sec if y)
3.3SetiPl a ( go bee otnivnn eeu rvn e p l a n al on g w ti h yeae th lr ofee Dvl o p m e n t P al)n p odrvi e d o r (yoesot n?r n o)
D at ppe ooa /f Arvl P essrmii on
3 If.2 i s,es deasett Yilhr eof
3.2et Whh e peo / ses tttrhli i pa otrf an a p p or ev d l a y o ues ot Yr o N?
S.N o.
3.1ad Ln D etasil
gae Vill eeue Rvn ae o Nmf
oN. as Khr a
P u pose orf L ea se
N Plo. ot
pp A orv a /l P e r mi s s oi n N o.
(i)q st. m. aces /nr ea Ar
ut M a ti o n
uat Dr i o n o easef L
( N S D o. al et & e)asilateDeed D
Wh e t h e r m a p e n c ol s ed?
)qst. m. (inossessoPineaude Arnr
O t h e r,s pl e a se s p e c i f y
R e m ar k s
A ( u F t o h V r o i r e Off eiz sw cid o e o f Uff th i s c e e e)r*
PART IV – PLAN N I NG D ETAI LS
(to be fi l l e d i n b y t h e a p p l i ca n t)
4.4.
4.3
4.2
4.1
S l. N o.
P e r m i s s i b i l<sub>i</sub> t y o <sub>t</sub>f h e L a n d u s e a p p l <sub>e</sub>i d(P e rmi s s bil e/<sub>e</sub> P<sub>r</sub> m i s s i b l e o n s p e c i a l c o n d i t i o n s/N o t p e r m i s s i b l e)
L a n d u s e,a p p<sub>l</sub> <sub>e</sub>i d <sub>o</sub> f r
L a n d u s e,a s p e<sub>r</sub> <sub>a</sub> L y o u t / T o w n P l a n n i n g S<sub>c</sub> h e m e/<sub>o</sub> Z<sub>n</sub> a<sub>l</sub> p l a n
L a n d u s e,a s p e<sub>r</sub> <sub>a</sub> M s t e r P<sub>l</sub> a n
P a r a <sub>e</sub>m t<sub>e</sub> r
D e t a i l s
A ( u F t o h V r o i r e Of iz w f e s c<sup>i</sup> <sup>d</sup> o e o f U ffi th s c e e e)r*
Page 1 71
i i<sub>i</sub>.
i i.
i.
c
b
a
4.6
4.5
D ae otf eecuotxin o<sub>f</sub> <sub>e</sub> D e<sub>d</sub>
D e<sup>ed</sup> <sub>N</sub> ubemr
N ae am deastn Dil o<sub>f</sub> <sub>g</sub> A e<sub>n</sub> <sub>y</sub>c <sub>o</sub> t w h o m t h e <sub>l</sub> a<sub>dn</sub> as h b e e sun r<sub>r</sub> e<sub>dn</sub> e r e d
ya w yeIf o ,s <sub>g</sub> <sub>dt</sub><sup>f</sup><sub>if</sub> <sub>et</sub> w<sub>h</sub> (yeedes? e aecethrff <sub>or</sub> <sub>p</sub>d o n otr) oin s <sub>a</sub> h v e b e<sub>e</sub> n s<sub>u</sub> r ern d<sup>e</sup><sub>e</sub><sup>r</sup> d t o G<sub>ov</sub> e r<sup>n</sup><sub>m</sub> e n t o r A u t h o r i t y o r L o c a l A u t h o r i t y b y
<sub>es</sub> Y o or N?
<sub>e</sub> W<sub>h</sub> t p,ehrl o <sub>aecedttff</sub> <sub>y</sub> b M a<sub>st</sub> e<sub>r</sub> p<sub>l</sub> a n/<sub>o</sub> z n a pl l a<sub>n</sub> (oar d s a d dnr a)<sub>s</sub>i<sup>n</sup>?
e Dw l<sub>li</sub> g Unn pseectir h atr (e ofr p<sub>r</sub> jo e c<sub>t</sub> s <sub>a</sub> h v i <sub>g</sub>n es ri detn i a l c pom o enn t s)
PART V – BU ILDING PARAM ETERS
(to be fi l l e d i n b y t h e a p p l i ca n t)
d
c
b
a
59.
58.
5.7
56.
55.
5.4
53.
5.2
5.1
S.N o.
S<sub>dei</sub> <sub>2</sub>
S<sub>dei</sub> <sub>1</sub>
<sub>ea</sub> R<sub>r</sub>
ot Frn
S<sub>ebactk</sub> s
<sub>y</sub> S<sub>oceti</sub> R o o m
<sub>u</sub>s<sub>ot</sub><sup>t</sup> M<sub>li</sub>-r e y e<sub>d</sub>(n o.o f s t o r e y<sub>s</sub>)
<sub>oot</sub> 4<sub>h</sub> <sub>flr</sub>
3door flr
doo 2n fl r
soot 1 flr
S / Gttilr o u n d <sub>f</sub> <sub>o</sub>l o r
asee Bm n,t i <sub>a</sub>f n y
C a t e g o r y
n A o s r <sub>m</sub> p<sub>e</sub> s r
P r o p o s a l
a l t e r (at pa A <sub>o</sub><sup>i</sup> <sub>p</sub> s <sub>n</sub> l<sub>i</sub> p c e / a r e r bl A n e p e f p w or or <sup>a</sup><sub>l</sub> <sub>a</sub> v c d e a d d <sup>s</sup> <sub>t</sub><sup>i</sup> p e i l s o a n n o/n l y)
O V f i f<sub>i</sub> e c w e s r * o f(F t o h r e O A f u f t i c h e o r U iz s e e d)
Page 1 72
UTTARAKHAND BUILDING CONSTRUCTION AND DEVELOPMENT BYELAWS/REGULA TIONS 201 1 (201 7)
<sup>gqa</sup> <sup>s</sup><sub>t</sub> P<sup>rkin</sup>. m.
FAR
<sub>g</sub> C<sub>ateo</sub> <sub>y</sub>r
n A o s r <sub>m</sub> p<sub>e</sub> s r
P r o p o s a l
a l t e r (at pa A <sub>o</sub><sup>i</sup> <sub>p</sub> s <sub>n</sub> l<sub>i</sub> p c e / a r e r bl A n e p e f p w or or <sup>a</sup><sub>l</sub> <sub>a</sub> v c d e a d d <sup>s</sup> <sub>t</sub><sup>i</sup> p e i l s o a n n o/n l y)
O V f i f<sub>i</sub> e c w e s r * o f(F t o h r e O A f u f t i c h e o r U iz s e e d)
PART VI – OTH ER PLANS RELATED TO BUI LDI NG PLAN
(to be fi l l e d i n b y t h e a p p l i ca n t)
65.
6.4
63.
6.2
6.1
S l.N o.
F o<sub>un</sub> d<sub>a</sub> otin P<sub>l</sub> a n
S <sup>u</sup><sub>c</sub>t<sup>r</sup> utr al Pl a n
A ear S<sub>t</sub> a<sup>et</sup><sub>m</sub> e n t
E ealv <sub>o</sub>t<sup>i</sup> <sub>s</sub>n
A <sub>o</sub>l<sup>l</sup> <sup>fl</sup> o<sub>r</sub> paln s
P a r a m e t e r
W h e t h e r g n i o v t e? n ( i Y n e t s h o e r B N u <sub>o</sub> i<sub>l</sub>) d i n g P l a n o r
V i e w s o ( f F t o h r e O A f<sub>f</sub> u i t c h e o <sub>U</sub> r<sub>i</sub> s z e e) d o f f i c e r*
Page 1 73
UTTARAKHAND BUILDING CONSTRUCTION AND DEVELOPMENT BYELAWS/REGULA TIONS 201 1 (201 7)
6.15
6.14
6.13
6.12
6.11
6.10
6.9
6.8
6.7
6.6
A y oetnhr y pp,osos secrviinif
M uinimm dsace beee bttinwn <sub>o</sub>l c<sub>k</sub> s/b u i<sub>l</sub> d i n g s
S c<sup>edu</sup><sub>e</sub><sup>hl</sup>, o<sup>oos</sup><sub>dos</sub><sup>f</sup> <sup>Dr</sup> w<sub>inw</sub> a n d O p e n i n g s
E <sup>ecc</sup> <sub>S</sub><sup>t</sup>l<sup>ri</sup> yppual Pln
P gublmin paln
F<sub>i</sub> e Saetrf yosoa Prviin Pln
S odasli w e bsosostinPrviin
D a Secrin otin
G <sup>oud</sup>r<sup>n</sup> <sub>w</sub> gg paeecaotr rhrini <sub>t</sub>n
S pecati T p ad Soaoctnknki l a<sub>ti</sub> o<sub>n</sub>
PART VI I – UTI LITI ES
(to be fi l l e d i n b y t h e a p p l i ca n t)
d 7 o . n 3. e o setni 3 Goudrn (es /Y aet wr)o N eatxr ct i on t o b e
s ( 7 u w . p h 3. yps aal iv eeuthr M 2 Drinkin)abeill pcaniil gaet W (eY - p /ubl acr fil sciti / y N w o at) e r
p 7 e . r 3. yq daeu ri ae ct1Wr eermn osunm @t 1 potin 3 d 5 e L m P a C n d D
7.3atesu Wryppl
aaPrm eter
D e t a i l s
o V f i fi e c w e s r * o ( f F t o h r e O A f u fi t c h e o r U iz s e)e d
p o 7 aln utf .4.) ( paoso datllinhw inr g5eaed Seeaet Trwr w d gstini- psosai e l
If yey (p,s CaacoStifTP in) MLD
7.4.( p3 SodedesTPrviY/)o N
(l If en ye g, beadeatth Xrh Ar i p,s Se o secat tizfin n /k q st. m soak). pti
/ 7so .4.) (y)paes ootkir n- ( Oseeaet ttt2nirmn-S pect ti an k
g 7 en .4. ()eaedtrin MLD y qoaua ottt1 Tlnif w as eatt w er
7.4g Seeaewr
aaete Prmr
D e t a i l s
o V f i f e ci w e s r * o ( f F t o h r e O A ff u i t c h e o U ri s z e e) d
Page 1 74
UTTARAKHAND BUILDING CONSTRUCTION AND DEVELOPMENT BYELAWS/REGULA TIONS 201 1 (201 7)
s 7 q .. 5m .2 t. P r o p os ed O p e n s p a c es a r e a
p 7 r . o 5 po .1 s T e o d t a ( l in e KV ectl) ri ci t y c o n s u m pt i o n
7.5El e c t r i ciyt
( 7Y . e 6. s / 3 P N r o o) v sooiin fr Com po sti n g
( 7s . h 6. ow i S2 n o li d d gasrwini- ase dt wi petl pso an sal) o l c a t i o n
g 7 e . n 6. ear 1 T ti o o t n al ( Qutinin sodali w as /l set da y)
7.6Sol i d aste W M aan geem n t
PART VIII – EXTERNAL IN FRASTRUCTU RE PROVISIONS (to b e fi l l e d i n b y t h e a p p l i ca n t)
M 8. a 2 j . yoae cae attr wrhnnl ifn wih ese Sausttt1 Prn 50in0tm.f or tm eh sti (esohwo l c at i o n o n m a p)
8.2gaae Drin
(a)I y j,es dsaceoucottfin frmni (nin)t m.
8.1.3ee seocaed a otttt Whhri l ear n oar r d ju ctn oi n? eso YrN o.
(b)gp Uadaooeaueotttrinfhnretfh oad r
(a)gdeoeoadt WininfhR
8.1.ppoosedoeest2 Pr Imrvmn
(d)gpp Sausoesaoactttfxiinrh oad r (pub l ci p /r iv aet, / oesthr p el a s e s p e ci f y)
(c)I s aaseaoadett i Mr Pln r? Y s or o N.
(b)I ypp,esdoaoacotf Wihfrhr adot seti(int m.)
(a)yeecoecoettttt Whhrnnivih seti i s thr o gu ah n exi gsoatin r d?Y e s o r N o
8.1.ese Sausttt1 Prn
8.1ppoacoad ArhR
P aaretesmr
M a x.
M in.
D e t a i l s
o V f i fi e c w er s * o ( f F t o h r e O A f u fi t c h e o r U i z s e)e d
Page 1 75
UTTARAKHAND BUILDING CONSTRUCTION AND DEVELOPMENT BYELAWS/REGULA TIONS 201 1 (201 7)
gy85esece od sao / eecc dsbuotttttt..1 Prnfriinlriiirii geo dan lin frrwin el yeccott trii th e sti e(Y e s/N o)
y 85ectct. Elrii
(y) ooes ootr n?r n gyg pp, 8ee da adaouas decttt.4.4 Whhrrwinn llniin gpe seeae ds thwri o saeotl mh d ol o gy h a s b e e n p r ov i d e d
p,3 8o descbedeod o dsosa o seeat.4. If nri mhfilfwr geaset w.
()cccessbe dsaceo sett Ailin frmi
() ()pb SeoadetttizfDrinWihXDh inm.
()y (y)paeoaeae /aso coceett TfDrinrhn mnrnr
y p, 8esode deas oe accessbe seet t.4.2 ifrviilfhilwr gaedarin
g p,8ee se coecedoubc Seeaettt t.4.1 Whhrinnliwr ()eoes /ot nwrkY N
g 8 Seeae.4wr
g (y) p p as aa o buda ooes oottrfilinlnr n?r n g pp3 8 case oeee ooudae cot..4 Inf nwi linrrn wrv g,,eae esaesttrim d gas arwin n d lyao u t p al n s s u b m i tt e d
y (g ppp,33 8oasoae su a seoudttt.. If nln fr wrlirn w yppae /e sutr nwl li n eo ds frmi t an t pu b li c s o u r c e)
()cccessbe dsaceo sett Ailin frmi
()gbeeueae Rvn Vill
()y()ppaeuca /ua Tmniil rrl
y p,3 8esode deast..2 Ifrviil
y ppp38ee souce oubcae su aaatt..1 Whhrrfli wrlvil (be a se ootttlir n? y)es oor n
ypp 83ate su. Wrl
()gggpbeeaoeasuesaaeotttt Whhrlnfrmrmiiinwrl gg subed ottinmir n oesot? Yro N.
() y,aes deaseeot t Ifilhrf
ygj3 8ee seso aea ad subecettt.2. Whhri i in lw linrn gggdoaeo tt wr lin?esoo YrN.
gpe oaeabeoeoudtt t t Dhf wrl frmhrn?
p,eeoadsdeubcdaessesoott Whhr rilirinxi? YrN.
aPr aetesmr
D e t a i l s
o V f i fi e c w er s * o ( f F t o h r e O A f u fi t c h e o r U i z s e)e d
Page 1 76
pl 8. a 6 g ps subed as aa o budtttnmirfilin q case oeuee oet.4 Inf rirmnf n pa oolnr n y pawrimr (y)es oot?r n ase sa tttrnfri;on wh e t h er e stiaestm,darwi n g s an d l a y o u t
8.6p,3oaseaosodtt. Ifn whihlnfrliaseat w mn gaeetmn?
(b)()sacett Dinin m.
(a)ocaot Lin
8.6y p,esode deasocaott.2 Ifrviil Lin y p oafrimr asesao tttrnfri (n s oh w l o c ati on a n m p/dsati n c e in m t.)
8.6y peeaase saot ttt.1 Whhrrimrrnfri o sodn frli aseaaabt wvil el i n vi ci n ti y o t sti e or n o t (ye? s o r o n)
8.6g Sodasteaaeetli W Mnmn
a l 8. y 5 p pouas subed as aa o bttttlnmirf q case oeuee oet.4 Inf rirmnf nw g pudailinl eecc stlri (y ooestnr n? y gppue ol linr or dri n)o sat ti o n;wh et e eshr tiaestm,d r aw in g s a n d
8.5p,3oaseaodatt. Ifn whihlnfrrwi g eecctnlrii yo set tti?
(c)(ccessbesaceo sett Ail Din frmiin)t m.
C a y ()pactiinKV
(a)ocaot Lin
8.5yy gp,esocao ade odt t.2if linnfri ( saosttinh oocao otw linn m a)p a n d d sti an (cein K)sm
aaetesPrmr
D e t a i l s
o V f i fi e c w er s * o ( f F t o h r e O A f u fi t c h e o r U i z s e)e d
PART IX – SPECIAL PROVISIONS
(to b e fi l l e d i n b y t h e a p p l i ca n t)
(a)N o o f e r c gaehr psti/r ec h ar g e w ell s / s u rf a ce es r e r v o i r s o n s ti e
9.13.I f y,es peasel por v di e t eh d e at sil b el o w
( 9y . e 1 s .2 o I r f n y)o es,et whhper r o svi i on f o r a ri n w a et r h a erv s ti n g h a s b e e n p r o v i d e d i n t h e b u i l d i n g p l a n o r n o t?
9.1.1W h et h,ee trh potl ar eas i300q s.t m. or ab o ev?(y e s or n o)
9.1a R i n w at e ar hrv esti n g
P a ar m e t e r s
D e t a i l s
o V f i fi e c w er s * o ( f F t o h r e O A f u fi t c h e o r U i z s e)e d
Page 1 77
(a)ypadaoososoeseaott Mnrrviinfrrvin f poS aseosr EWr nrm
9g5Sous..2 EW Hin
9jp p5oau u aea oeoectt tt..1 Tl Bilrfhr i n q st. m.
95.godabeousosos AffrlHinPrviinT - o p beed u cases oesdeta fill inf rinil p r o j e ct s o n p l o t s i z e s o f m o r e t h a n2000s q.m t.
(c)y p pou o eeccoducoetttt Amnflriirinr d ya inKW
(b) ppooaesoded Nfnlrvi
(a)ypooaeacoeedbsoaaess Rfrvrlrnl q t. m.
9.y p,3esode deast.2 Ifrviil
9.p pp,eee aea ooost tt4.1 Whhrhlinhrfr e g(yq 3d budsoea00 se ttilin i mrhn. m. s o r n)o
9.4S O Gd / Gd coectedoaoffririnnlrR o ypStostefm
(c)y (y)pp Caacesedattiinlirr
(b) ppooaesoded Nfnlrvi
(a)ypooaeacoeedbsoaaess Rfrvrlrnl q t. m.
9.y p,3esode deast.2 Ifrviil
9.p pp,3eee aea ooost tt.1 Whhrhlinhrfr e ggqd buda00s ooetilinhvin2. m.rmr(y e s or n)o
93.gy Soaateeat sstelr Wr hinm
(c)ggeasoecosuaeaedotttt Dilfhnlnnf r ppeuose thr
(b)ggppabeoosedudeeabtt Rininrnrh o peoocotvrl
(a)g ( ppoocobeoosedG /t PrlinrRIHA L E yy pp, /GC / oeeasesectED IB Anhrlif)
9.y g,ese deast2.2 ifivil
9.gee Geeud cecattt2.1 Whhrrn Bilinrifii o g (y) pp beoosed ooes ootninrr nr n
9.2g (p GeeudcetcatoornBilinrifiinrvi d g)e detas o cetcato adatilfrifiinn rin
(d) peaed Sceaca ad datt Dilhmilnnrwin g g (y) p podedbudaesoorviinilinlnrn
(c)y p Qua oaeecoaottttnif wrrlin
(b)gg p Se oecaes /ecaeetizf rhri rhr wll s / suaceeseos o setrf rrvirni
aaetesPrmr
D e t a il s
o V f i fi e c w er s * o ( f F t o h r e O A f u fi t c h e o r U i z s e)e d
Page 1 78
9.6y An ot ehr (p orv i d e detail s)
M adan t or y E W Ssi pr o posed w tihin th e s ti e p r e m i s es o r s e p a r a t e l y
(c)u Bil t u p ar ea un d e r (G LIi n p ecertn a g)e
(b)u Bil t u p ar ea un d e r G s LI q. t m.
(a)o N. ofG LI U stni P or pose d
9.5.2 L I G o H usi gn
(d)u Bil t u p ar ea un d e r S EW (i n pecr e n at g e)
(c)u Bil t u p ar ea un d e r S EW s q. t m.
(b)o N. of EW S Uni t s P poosr e d
P a r a m et e r s
D e t a i l s
o V f i fi e c w er s * o ( f F t o h r e O A f u fi t c h e o r U i z s e)e d
PART X – SPECIAL CLEARANCES (to b e fi l l e d i n b y t h e a p p l i ca n t)
10.3.2y,es If a n em adonn. of t eath N oainl g Hihyaw
10.3.1et Wh h e treh j poectr qe r u es diri ec atr cces sofr m N H m a i n t a in e d b y N H A(Y e s/N o)
10.3N a toainl g Hi hw yaut A oh riy (tNH) CAl eaar cen
10.2.2()b Di s atn ce i tnm.
10.2.2y,es If ()a a N eotmfeh M ounm etn
10.2.1et Wh h e treh j poectr s i l o caedt t wihin300ot m. f N ati on a l P r ot e c t e d M o n u m e n t(Y e s/N o)
10.2A r caeoh l goi cal Suerv y o f da Ini ()SAI Cealacrn e
10.1.2()b Di s atn ce f o trmh e S trgaectiud Bil gin.
10.1.2y,es If ()a a N eotmfeh S gaettri cu Bil gdin
10.1.1et Wh h e treh joect Prs i w tihin2 00t m o.fn oetifi d S atret g i c B uidl i n g(Y e s/N o)
10.1S e ycutri Cel aar cen
P aarm e tesr
D e t a i l s
o V f i fi e c w er s * o ( f F t o h r e O A f u fi t c h e o r U i z s e)e d
Page 1 79
UTTARAKHAND BUILDING CONSTRUCTION AND DEVELOPMENT BYELAWS/REGULA TIONS 201 1 (201 7)
10.6()beeesestttt Whhrhiiwih in500m t. f r o m t h e ce n t e r o f r i v e r G a n g a a n d i t s t r i b ut a r ei s
10.6()aG ceaace NTlrn
10.5()pboabuuaeatt.2 Tlilr
10.5y (),esaaaeeot.2 If Prmr fr Cl e ar a n c e
G 1 o 0. v 5 ()ee odaes /otrnmnf IniY N jeeeoecet tt.1 Whhrh Pr r qu ir es E n v i or n m e n atl C l e a r a n c e a s p e r d e t a il e d N o ti fi c a t i o n o f M o E&F,
105.oeta Ceaace Envirnmnllrn
10.4,3esOC obaedt. If Y Nin?
10.4gg ppe o budoost.2 hihfilinr ed
10.4ppeeoosed budt.1 Whhrrili gn i s w ti h in20k m(eY s/N o)
10.4ypotutotoda AirrAhrifIni Cl e ar a n c e
PARTXI - CH ECKLIST OF DOCU M ENTS TO BE ATTAC H ED (to b e fi l l e d i n b y t h e a p p l i ca n t)
11.8A n y o<sub>eth</sub> ecrn l o<sub>s</sub> u pe aserr <sup>p</sup> s<sub>e</sub> qcceuifi ri <sub>e</sub>r m e <sub>t</sub>n o<sub>f</sub> t h e c a s e
11.7T w o p<sub>o</sub><sup>h</sup> goatr p h s o<sub>e</sub> <sub>se</sub> <sub>ttfhi</sub>
11.6A f<sub>f</sub> <sub>d</sub>i a<sub>tvi</sub> o inri g i<sub>n</sub> a<sub>l</sub> pesc inrr <sup>b</sup><sub>e</sub>i doat frm
11.5F o u<sub>r</sub> p co <sup>es</sup> <sub>o</sub>i f p<sub>l</sub> a gg dnivin e<sub>ati</sub> ps aseslr c<sub>r</sub> <sub>b</sub>i e d <sub>i</sub> <sub>t</sub>n h e a p p l <sub>c</sub>i a t<sub>i</sub> o n f o r m
11.4C o p y of cetrifi c a<sub>t</sub> e <sub>g</sub> o<sub>estf</sub> <sub>rir</sub> a<sub>o</sub><sup>ti</sup> ocnf Arhi <sub>e</sub>t c<sub>t</sub>/E gni n e e<sub>r</sub> s/B u i<sub>l</sub> d e r-D e<sub>v</sub> e l o p e r
11.3S e l<sub>f</sub>-gsin e<sup>d</sup> <sub>X</sub> e <sub>o</sub>r x p coes oif o<sub>w</sub> pes dnrhi o<sub>c</sub> u m e<sub>n</sub> <sub>s</sub>t
11.2S c <sub>u</sub>r <sub>y</sub>t<sup>i</sup><sub>n</sub> ee c f h a<sub>l</sub> <sub>a</sub>l yp con
11.1A p p<sub>l</sub> catii o<sub>o</sub><sup>n</sup> <sup>f</sup> r m d yuedl fill i <sub>a</sub>n gd sednin
<sub>esc</sub>D<sub>ri</sub> p<sub>t</sub> <sub>o</sub>i n o <sub>t</sub>f h e D o c u m e n t s
D e t a i l s
o V f i <sup>f</sup><sub>i</sub> e c w <sup>e</sup><sub>r</sub> s * o ( f F t o h r e O A f u <sup>f</sup><sub>i</sub> t c h e o r U i z s e)e d
Page 1 80
UTTARAKHAND BUILDING CONSTRUCTION AND DEVELOPMENT BYELAWS/REGULA TIONS 201 1 (201 7)
PART XII - DECLARATION (to b e fi l l e d i n b y t h e a p p l i ca n t)
I here by acknowledge an d declare th at th e a bove i nformati on is tru e to th e best of my knowled ge an d su b m itted i n accord a n ce with th e Deve lop me nt P la n a nd B u i l d i ng Contro l Reg u latio ns re lated with Ce ntral a nd State Govern me nt and its su bseq ue nt a mend ments . (Tick in the box on the left column)
A u<sub>t</sub> h o r i z e d P e r s o n
O w n e r
N a m e&D e s i g n a t i o n
S i g n a t u r e/D i g i t a l S i g n a t u r e
D a t e
P l a c e
PART XIII (Office U se o n l y)
A ppr o v g Oceinffir
P aln n<sub>i</sub> n g Oceffir
E gni n e ge Ocrinffi e<sub>r</sub>
L a<sub>dn</sub> D e<sub>as</sub> <sub>adtiln</sub> D o c u m e<sub>tn</sub> a t <sub>o</sub>i n V e r i f<sub>i</sub> c a t<sub>i</sub> o n O f f i c e r
A ppli c a oecetin Ri v<sub>i</sub> n g O<sub>f</sub> <sup>c</sup><sub>e</sub>f<sup>i</sup> r
<sub>etas</sub>D<sub>il</sub> o f t h e <sub>u</sub> A t h o r<sub>i</sub> z e d O f f<sub>i</sub> c e r s
N a m e
D e s i g n a t i o n
S i g n a t u r e
D a t e
R e m a r k s,i f a n y
Page 1 81
[See Byelaws 2.1(1)]
Signature…………
Architect
Name………
Full Address…
Signature………
Email Address
Mobile Number
Registration Number
Supervising Engineer
Name………
Full Address…
Signature………
Email Address …
Mobile Number
6
House Number (if any)
7
Site Number
8
Colony & Sector
9
City / Town
10
Name of the Owner
11
Permanent Address of the Owner
12
Mobile Number of the Owner
13
Email Address of the Owner
It is hereby certified that the above work has been supervised by us and has been completed to my satisfaction in accordance with the sanctioned building plans and its structural design / structural drawings checked by third party auditors forbuildings more than 15mt. in height. The workmanship and all the material used for construction meet the specifications laid down in the National Building Code. No provision of the Uttarakhand Building Byelaws, 2017 and no regulations made, conditions prescribed or order issued thereunder has been transgressed in the course of the work.
Name………
Full Address…
Signature………
Email Address
Mobile Number
Registration Number
Date …
(Name of Development Authority / Local Development Authority / Urban Local Body)
Letter No. / ……….. Dated
Form SC-I
(See Byelaws 2.2(1)
FORM OF APPLICATION UNDER SELF-CERTIFICATION
Class of Building –
Residential
Institutional
Commercial
Industrial
Educational
Any other
From
To………………
Sir,
I / We apply for permission to erect / re-erect / add / alter a building / wall in accordance with the plans submitted herewith on Site No.; Street No.; at .
I / We attach:
a. a site plan showing the position of site proposed to be built upon as required by the Byelaws (in triplicate) an un-editable Compact Disc / DVD or any other electronic medium permissible by Competent Authority from time to time containing the drawings as required by Byelaws 2.1;
b. Plans, elevations and sections as required by the Byelaws (in triplicate) an un-editable Compact Disc / DVD or any other electronic medium permissible by Competent Authority from time to time containing the drawing as required by Byelaws 2.2;
c. Drainage plans (in triplicate), as required by Byelaws along with an un-editable Compact Disc / DVD or any other electronic medium permissible by Competent Authority from time to time containing the drawings as required under this byelaws;
d. Structural drawings (for record) along with structure Certificate as per FormBRS-II;
e. Fire Safety design as required in the National Building Code as approved by the State Fire Authority. Alternatively an undertaking to the effect that the fire safetyplans duly approved by the State Fire Authority will be submitted within sixty days;
Heating, Ventilation, Air conditioning (H.V.A.C.) service plans, wherever required;
Specifications of the proposed building (in triplicate) in FORM-II;
Certificate of conformity to regulation and structural safety for the relevant buildings;
An affidavit from the owner and architect, as required under Byelaws 2.2;
4. Scrutiny fee through an electronic transfer
The construction of the building will be undertaken as per the approved building plans, structural design given by the Structural Engineer, fire safety design as approved by the Competent Authority and got supervised through the following Architect / Engineer;
Signature of
Empanelled Architect: a. Complete Address b. E-Mail c. Mobile no.
Structural Engineer supervising the construction at site a. Complete Address b. E-Mail c. Mobile no.
State Industrial Development Authority Building Regulation, 2016
(ix) In case of construction without revalidation a fee of Rs. 20 per sq. mt. of covered area shall be levied if all provision as per byelaws are complied with.
(x) An affidavit on Rs.10 stamp paper duly notarized, shall be submitted by applicant that all malba during construction shall be kept within the plot.
(xi) If rectification of all objections is not done even after two objection letters issued by SIDA, Rs. 500 shall be levied towards site visit fees for each subsequent visit.
(xii) The applicant shall deposit 25% of the building permit fees for temporary structures (other than labor hutments) as per individual use of the structure. Labor hutment fees shall be Rs. 0.25 per sq. mt. of covered area.
(xiii) Water, Sewer and other service connection charges shall be paid as levied by SIDA.
(xiv) The CEO / SIDA shall be empowered to revise the fees / charges mentioned in this item clause.
S:5. Withdrawal of Application
The applicant may withdraw his application for a building permit at any time prior to the sanction and such withdrawal shall terminate all proceeding with respect to such applications but the fees paid shall in no case be refunded.
Where the Chief Executive Officer on the certificate of the technical personnel is satisfied that the temporary occupation of a building or any portion thereof which is before its completion and which does not adversely affect public welfare; may permit temporary occupation in the Form given in Appendix-11A of such building or portion thereof as the case may be, for such period as he deems fit.
2
Construction within sideopen space (setback)
Rs. 5000 / - per sq. mt. Of the coveredarea subject to the minimum ofRs. 4,00,000 / -
3
Construction within therear open space (setback)
Rs. 4000 / - per sq. mt. of the coveredarea subject to minimum ofRs. 3,00,000 / -
4
If the plot coverage ismore than prescribed
Rs. 3000 / - per sq. mt. of the area exceeding the prescribed limit.
If the clear height inside theroom is less than the prescribed
Rs. 2400 / - per sq. mt. of the area of the room
7
Construction of a boundary wall
Rs. 500 / - per running mt.
Note: * This composition fee shall be in addition to the development charges leviable under Building Permit
Bye Laws of this BBL-16 or cost of development recoverable under any other provision of this BBL-16 or bye-laws).
(iv) Composition fees for height exceeding 21.0m upto 23.0mt. (Max.). @Rs. 200 / - per sq. mt. on the covered area of the raised portion.
(v) Maximum compoundable height of boundary wall 2.5mt.
(vi) Composition fee for carrying out construction work without applying for approval from SIDA. a. Plot area upto 2000 sq. mt. – Rs. 50,000 / - b. Above 2000 sq. mt. – Rs. 1,00,000 / -
(vii) Composition fee for truss roof above 15m upto 17m (maximum) @ Rs. 100 / -sq. mt. on covered area of the raised portion.
(viii) Compounding of other setbacks (Adjacent to the main building): a. Front setback Not allowed b. Side and Rear setbacks : Upto 10% area of permissible ground coverage.
(ix) If the development has been carried out without submission of map application as per bye-laws, the prescribed map application fee and development charges shall also be levied in addition to the composition fees as prescribed in bye-laws for composition of offences.
(x) If the offence is committed by carrying out unauthorized development which falls in more than one type as indicated in foregoing bye-laws, the composition fees may be charged separately for each type of unauthorized development.
(xi) For development in and within 100 mt. of the old village abadis, the rates of composition fee will be half of those prescribed in foregoing bye-laws.
(xii) The rates of composition fees as laid down in foregoing bye-laws are only for general guidance and SIDA or the officer empowered for the purpose shall have full discretion on the levy of the composition fees.
(xiii) For the matters not specified in foregoing bye-laws SIDA or the officer empowered for the purpose, may determine the composition fees at the rates which in his discretion are appropriate, reasonable and just.
(xiv) It shall be on the discretion of CEO / SIDA to permit compounding. Before permitting / compounding, the neighbor shall be given an opportunity to oppose the compounding process.
S:17. General Requirements
(i) Site Requirements
a. Distance from electric lines: As mentioned above
b. Distance from water source : As mentioned above
(ii) Distance between two adjacent Building Blocks
Distance between two adjacent building blocks shall be minimum 4mt. upto 12 mt. height of blocks and thereafter the spacing shall be increased by 1mt. for every addition of 3 mt. in height of building The Authority shall have a right to impose such restriction and limitations as to the number of storey and extent of height of the building as he considers fit where protected areas, ancient or historical monuments lie within a radius of one and half kilometer from the boundary line of such buildings by recording the reasons.
(iii) Industrial Buildings
a. Proposed Setbacks
Area (Sq. mt.)
Plain Area
Hill Area
Front
Rear
Side-1
Side-2
Front
Rear
Side-1
Side-2
300
3.0
2.0
2.5
-
3.0
2.0
1.5
-
301 to 600
4.0
3.0
3.5
-
3.5
3.0
3.0
-
601 to 1200
5.0
3.0
3.5
2.0
4.0
3.0
3.0
2.0
1201 to 2400
7.5
5.5
4.5
3.0
6.0
4.0
4.0
3.0
2401 to 5000
9.0
6.5
5.5
5.0
7.5
5.5
5.0
5.0
5001 to 10000
12.0
7.5
6.5
6.5
9.0
6.5
6.0
6.0
10001 to 30000
18.0
9.0
7.5
7.5
12.0
7.5
6.5
6.5
30000 to 6.0 ha
20.0
12.0
9.0
9.0
18.0
9.0
7.5
7.5
6.0 ha above
25.0
15.0
12.0
12.0
20.0
12.0
9.5
9.0
Table 77: Proposed Setbacks for Industrial Buildings
(viii) Landscaping
Industrial shall be required to plant a minimum number of trees in their premises as follows:
Plot size
No. of trees to be Planted and Maintained
Required Minimum Open Space for landscaping
Upto 2000 sq. mt.
One tree per 100 sq. mt. of open space out of which minimum 50% trees to be in the category of evergreen trees, having height of 7 m or more.
25% of setback area
2001 sq. mt. to28000
One tree per 100 sq. mt.of open space out of which minimum 50% trees to be in the category of evergreen trees, having height of 10 m or more
-do-
More than 28000
One tree per 100 sq. mt.of open space out of which minimum 50% trees to be in the category of evergreen trees, having height of 13 m or more.
-do-
(ix) Loading And Unloading Spaces
In addition to the parking space provided for building of mercantile (commercial), industrial, and storage buildings, one space (23 sq. mt.) for loading and unloading shall be provided at the rate of one such space for loading and unloading activities for each 1000 sq. mt.of floor area and fraction thereof exceeding the first 200 sq. mt.
(x) Boundary Wall
Type of buildings
Height of boundary wall measured from plinth of the boundary wall (in mt.)
Height of the gate from plinth of the boundary wall
Abutting road
All other sides
All buildings
2.4 m with lower solid portion of 1.5 m and upper 0.9m of jali / grill.
2.4 mt. can be solid or grill
Minimum 2.4 mt. Maximum as approved by SIDA.
And Certificates
FORMATS FOR FORMS
Formats for Forms and Certificates
(ii) Floor Area Ratio Shall Not Include
a. Basement which are permissible within building line, the height not exceeding 2.4 m from floor to bottom of beam. However, only in case of buildings other than commercial, maximum, permissible area under basement shall be limited to as follows:
If used for services, storage etc. then maximum area under such facilities shall be equivalent to maximum permissible ground coverage.
• If used for parking, then area equivalent to parking norms shall be permitted.
A service floor up to 100% of maximum permissible ground floor coverage in all buildings upto 2.25 m in height is allowed between floor to bottom of ceiling
(iii) Industrial Layout
Occupancy Type
6 to 20 ha
20to 50 ha
50to 100 ha
More than 100 ha
Industrial
Max 60%
Max 55%
Max 55%
Max 50%
Residential
2% to 4%
4% to 6%
6% to 8%
8% to 10%
Commercial
Max 1%
Max 2%
Max 3%
Max 4%
Transportation& Communication
Min 25%
Min 23%
Min 20%
Min 15%
Service area
Min 2%
Min 4%
Min 6%
Min 8%
Managed parks and Plantation
Min 9.0%
Min 10%
Min 10%
Min 15%
(iv) Under land used classification, following activities / purposes shall be admissible
a. Industrial area- Related activities to industrial unit, industrial plots, flatted industrial unit (with godown), IT and ITES
b. Residential area- For labor residence minimum 60% of net residential area shall be allotted essentially in their service period for employed labors in the concerning industry.
c. Maximum 40% of net residential area shall be admissible for residence of management / technique / engineering cadre / class.
d. Commercial area- Public shops and local sector market, petrol pump, guest house / budget hotel, lodge / rest house service and repair shop telecommunication / telephone exchange etc.
e. Service area- Public and semipublic- fire station, police station / chauki, hospital, dispensary, pilgrim’s rest house, night shelter, anganbari, canteen, club etc.
f. Utilities – Electric substation, firefighting, water tank treatment plant etc., for relevant activities.
(v) Height of industrial units’ chimneys shall be kept free from related calculation.
(vi) For Single industrial units of more than 6.0 Hectare area under the industrial campus according mentioned in various land use standard provisions
(vii) With industrial development layout approval of landscaping plan shall be necessary in which following provision shall be necessary-
a. In part of total open side per hectare 125 trees shall be planted and which shall be developed as park, greenery / green belt etc. the minimum 50% of open area shall be covering with trees.
b. The minimum ratio width shall be 10.0 mt. of open space and his limit shall be far minimum three mt. from plot / building line.
c. Industrial campus / industrial units of more than area of 6.0 hectare a rounding 15.0 mt. area shall be necessarily developed as a greenery.
d. Abutting with boundary wall in plots of from 1.0 hectare upto 6.0 hectare shall be necessarily planted trees to the areas of half width of setback.
e. In industrial area and in any other use, the minimum 10 mt. width greenery side shall be left necessarily as a buffer zone. If this zone is as road then side of the road three mt. shall be planted.
f. Establishment of Industrial Estate should be 0.809 Hectare (minimum) at Hill area.
(vi) No construction of any kind shall be permitted beyond the building envelope (in setbacks) except
a. A chajja (projection) of maximum width of 750 mm at lintel or 1200 mm at roof level. This construction shall not be more than half of the width of setback. No construction of any type or any material shall be permitted over projections.
b. Underground water tanks with top (except manhole cover) flush with the adjoining ground level.
c. Watchman shelters and Watch Towers:No projection of watchman shelters and watch towers shall be allowed outside the plot line.Maximum height of watchman shelter shall be 4 mt. And watch towers 15 mt. Total area, as mentioned below under such shelters may be split up in desired number of watch-man shelters and watch towers.
d. Maximum permissible area for Guard room shall be 10 sq. mt. upto 450 sq. mt. plot area.
S.No.
Plot Size
Total Area of Guard Room, Meter Room, Time Office & Watch Tower
1.
Above 450 sq. mt. and upto 2000 sq. mt.
20 sq. mt.
2.
Above 2000 sq. mt. and upto 4 Hectares
45 sq. mt.
3.
Above 4 Hectares and upto 20 Hectares.
60 sq. mt.
4.
Above 20 Hectares for each additional 20 Hectares
An additional 10 sq. mt. and part thereof
Table 80: Total Area of Guard Room, Meter Room, Time Office & Watch Tower
e. Canopy / pergola projections as mentioned in Table: Area under canopy in buildings other than residential buildings. No construction of any type shall be permitted over the canopy projections
f. Open plinth steps within 1.0 m from setback line in the setback area
g. Meter room as per table above
h. Open transformers without any permanent enclosure which satisfy all necessary safety requirements
i. In specific cases water bodies and pools, and other landscape features may be permitted with approval from the CEO provided fire safety requirements are not affected.
j. Rockery, well and well structures, water pool, swimming pool (if uncovered), uncovered platform around tree, tank, fountain, bench, chabutra with open top and unenclosed by side walls, compound wall, gate, slide swing, culverts on drains, catch – pit, gully pit, chamber, gutter and the like.
k. Any other features, primarily ornamental in nature, not enclosing or covering space of commercial use may be permitted by CEO on case to case basis.
l. No temporary structure shall be permitted on front setbacks or setbacks towards sides abutting roads.
Sl. No.
Plot size (sq. mt.)
Maximum area under canopysq. mt.
1.
Upto 150
Nil
2.
Above 150 upto 300
12 (only in side setback)
3.
Above 300 upto 500
25
4.
Above 500 upto 2000
40
5.
Above 2000 upto 4000
55
6.
Above 4000 upto 10,000
70
7.
Above 10,000 upto 20,000
85
8.
Above 20,000 upto 40,000
100
9.
Above 40,000
115
Table 81: Area under canopy in buildings other than residential buildings
Note: Minimum width of canopy shall be 3.0 mt.
S:18. Other Provisions
(i) Rest rooms / Retiring rooms: Provision for Rest rooms / Retiring rooms inside any industrial plot is permitted with a maximum of 2% of total permissible covered area.
(iv) Proposed Ground Coverage, Floor Area Ratio
Minimum ground coverage shall be 25%.
Area (sq. mt.)
Plains
Plains
Plains
Plains
Hills
Hills
Hills
Hills
Area (sq. mt.)
Ground Coverage %
FAR
FAR
Height (mt.)
Ground Coverage %
FAR
FAR
Height (mt.)
Area (sq. mt.)
Ground Coverage %
Ground Coverage %
Height (mt.)
300
60
1.20
1.50
-
65
1.30
1.30
-
301 to 600
60
1.30
1.60
-
60
1.50
1.50
-
601 to 1200
60
1.50
1.60
-
60
1.60
1.60
-
1201 to 2400
60
1.60
1.60
-
60
1.60
1.60
-
2401 to 4000
60
1.60
1.60
-
55
1.60
1.60
-
4001 to 10000
55
1.60
1.60
-
55
1.60
1.60
-
10001 to 30000
55
1.60
1.60
-
50
1.60
1.60
-
30000 to 6.0 ha
55
1.60
1.60
-
45
1.60
1.60
-
6.0 ha& above
55
1.60
1.60
-
40
1.60
1.60
-
Table 78: Proposed Ground Coverage, Floor Area Ratio
(v) Height of the Building
S. No.
Road Width
Height of the Building(mt.)
No. of Max. floor
1
Upto 9.0 mt. wide
9.0
Ground & above 2 floors
2
9.0 to12.0 mt. wide
12.0
Ground & above 3 floors
3
12 to 18 mt. wide
24.0
Ground & above 7 floors
4
Above 18 mt. wide
30.0
Ground & above 9 floors
Table 79: Height of the Building
Comprehensive Document Checklist
Consent to Establish / Building Plan Approval Process
The following set of documents is to be attached during online application for CTE process along with online payment.
i) Copy of Ownership documents / allotment letter / possession certificate / lease deed (transfer deed in case of transfer), and Dimension plan (key plan) issued by the SIIDCUL.
ii) Appendix 1 – Application Form for online submission of application to erect, re-erect, demolish or to make material alteration in a building
iii) Appendix 2A - Certificate of Undertaking by person holding Project Management responsibility
iv) Appendix 2B - Certificate in prescribed format by the Technical person
v) Appendix 3 - Structural design certificate from the Structural Engineers
vi) Appendix 4 - Certificate for Hazard Safety signed by licensed technical person
vii) Online payment of building permit / development fees through payment gateway
viii) Appendix 5 - Self-declaration in the prescribed format.
ix) Scanned copy of the registration of the licensed technical person as per Annexure 4 duly authenticated with plot no. for which it is submitted
x) Soft copies of Architectural drawings in Pre DCR format (Site Plan, Section, Elevation and Building Plan in one file).
xi) Soft copies of Structural drawings in one file
xii) Approval from the competent authority in case of Hazardous buildings
xiii) NOC from Pollution Department, wherever applicable
xiv) NOC from Chief Fire Officer, wherever applicable
xv) NOC from Other Department, wherever applicable