4.1 Risk Based Classification of Building Applications
(1) For fast track building plan approval, the Competent Authority shall approve building plans considering the risk based classification of buildings depending upon the following parameters:
| Parameter | Risk Level | |||
| Low risk | Medium risk | High risk | ||
| Building Classification | Industry | Upto 350 sq. mt. plot size | (as defined in NBC-2016, Part-4, Annex-B: low & medium hazard category) refer annexure-3 | (as defined in NBC-2016, Part-4, Annex-B, high hazard category) Refer annexure-3 |
| Storage / Warehouse | Upto 250 sq. mt. plot size and storage material of category I (refer annexure-3 ) | Upto 2000sq. mt. plot size and storage material of category I& II (refer annexure-3) | above 2000 sq. mt. plot size and storage material of category II and above (refer annexure-3 ) | |
| Residential Usage | upto 105 sq. mt. | upto 500 sq. mt. | above 500 sq. mt. | |
| Building Assembly(as per Clause 3.1.5, Part-4, NBC 2016) | Not Applicable | D5 (Annexure-3) | D1, D2, D3, D4, D6, D7 (Annexure-3) | |
| Others | upto 105 sq,mt convenience shops | As per other parameter | As per other parameter | |
| Height | Plains | Buildings upto 9.0 mt. height | More than 9.0 mt. above ground upto 21.0 mt. height | More than 21.0 mt. in height |
| Hills | Building upto 7.5 mt. height | More than 7.5 mt. above ground upto 9.0 mt. height | More than 9.0 mt. in height | |
| Floor Area | Covered area on every floor less than 350sq. mt.Of all non-residential buildings & all residential buildings | Covered area on any floor more than 350sq. mt.And less than 500sq. mt.Of all non-residential buildings | Covered area on any floor more than 500 sq. mt.Of all non-residential buildings | |
| Slope of the natural ground | Less than or equal to 10 degrees | Greater than 10 degrees & less than 26.5 degrees | 26.5 degree and above | |
Table 1: Risk Based Classification for Buildings
Note: All the parameter shall be assessed separately to classify the building low, medium or high risk in that particular parameter and the overall risk category of the building will be determined on the basis of the highest risk category for any parameter. The inspections shall be done specifically for the identified risk nature.
(2) In addition to the above Risk Based Classification, the concerned Authority will further determine whether the location of plot is faced by any of the known risks in terms of Natural Disasters like flood, bushfire, earthquake zone 4 / 5, contaminated land, cyclone, landslide, avalanche, soil liquefaction etc. and take necessary corrective action to reduce such risks by either requesting modification from the applicant in their submitted building plan or rejecting the application, in case the incidence of any such risk is very high.
(3) The buildings as stated above under the low risk category shall be approved as per clause 2.2 of self-certification.
(4) The building under medium &high risk category shall be approved as per clause 2.1.
Stages of Inspection based upon Risk Classification
| Name of Inspection | Incidence of Inspection | Risk Category Of Building | ||
| Low | Medium | High | ||
| Preliminary Inspection(as per sanctioned drawing) | At completion of plinth level | Self-inspection, Geo-Tagging and Certification by Supervision Engineer or Architect | Self-inspection, Geo-Tagging and Certification by Supervision Engineer or Architect | By Sanctioning Authority, Geo-Tagging and Certification by Supervision Engineer or Architect |
| Intermediate Inspection | At completion of <=15mt. height | Not required | Third party inspection by empanelled Structural Engineer | Third party Inspection by empanelled Structural Engineer |
| Final Inspection | At Building Completion | Self-inspection, Geo-Tagging and Certification by Supervision Engineer or Architect | By Sanctioning Authority, Fire Dept. and any other line departments * | Joint Inspection- Third party Inspection by empanelled Structural Engineer alongwith Sanctioning Authority, Fire Dept. and any other line department* |
| Surprise Inspection | At any time | By Sanctioning Authority | Minimum one inspection by Sanctioning Authority | Minimum Two Inspections by Sanctioning Authority |
| Complaint Based Inspection | At any time | Whenever a complaint is received by the Sanctioning Authority | ||
| Periodic Occupancy Renewal Certificate | After obtaining compliance Certificate from the Fire Dept. regarding mock drills etc.) | Not required | Once after Every 3 Years | Once after Every 1 Year specifically for |
Table 2: Stages of Inspection based on risk based classification of buildings
*Departments which have laid down such conditions which require verification during construction stage / after completion.