10.1 Environmental conditions for compliance during Building approvals
(i) The Ministry of Environment, Forest and Climate Change has decided to integrate the environmental concerns into building plan approval process and empowering the concerned local body / development authority to approve and certify compliance of stipulated requirements. The new building construction proposals are classified in the following 3 categories: a. Conditions for Category ‘A’ Buildings: Built-up Area 5000 sq. mt. – 20,000 sq. mt. b. Conditions for Category ‘B’ Buildings: Built-up Area 20000 sq. mt. – 50,000 sq. mt. c. Conditions for Category ‘C’ Buildings: Built-up Area 50000sq. mt. – 1,50,000 sq. mt.
(ii) These environmental conditions may be suitably integrated in the building permission conditions so that their effective implementation could be ensured by the local authority while sanctioning building plans in their respective urban areas.
(iii) For building plans with a total built-up area between 5,000 sq. mt. and 20,000 sq. mt., category A environment clearance may be given by the local authority by ensuring the stipulated conditions in Table- 30
(iv) For Category B & C, built up area more than 20,000 sq. mt. upto 1,50,000sq. mt. Environmental Clearance (EC) from State Environmental Impact Assessment Authority (SEIAA), Ministry of Environment and Forests, Government of India shall be obtained.
(v) The concerned Urban local body/ Competent Authority, authorized to sanction building plans, shall ensure at the time of sanctioning a building plan that the environmental requirements stipulated in Table 30 (for above 5,000 sq. mt. and up to 20,000 sq. mt.), Table 31 (for above 20,000 sq. mt. and up to 50,000 sq. mt.) and Table 32 (for above 50,000 sq. mt. and up to 1,50,000 sq. mt.), as the case may be, are complied with.
Category;- a
| S. No. | Medium | Environmental Condition |
|---|---|---|
| 1 | Natural Drainage | The inlet and outlet point of natural drain system should be maintained with adequate size of channel for ensuring unrestricted flow of water. |
| 2 | Water conservations - Rain Water Harvestingand Ground WaterRecharge | |
| 2(a) | The unpaved area shall be more than or equal to 20% of the recreational open spaces. | |
| 3 | Solid Waste | Separate wet and dry bins must be provided at the ground level for |
| Management | facilitating segregation of waste. | |
| 4 | Energy | In common areas, LED / solar lights must be provided. |
| 5 | Air Quality and Noise | Dust, smoke and debris prevention measures such as screens, barricading shall be installed at the site during construction. Plastic / tarpaulin sheet covers must be used for trucks bringing in sand and material at the site. |
| 5(a) | The exhaust pipe of the DG set, if installed, must beminimum 10mt. away from the building. In case it is less than 10mt. away, the exhaust pipe shall be taken up to 3mt. above the building. | |
| 6 | Green cover | A minimum of 1 tree for every 80 sq. mt. of land shall be planted and maintained. The existing trees will be counted for this purpose. Preference should be given to planting native species. |
| 6(a) | Where the trees need to be cut, compensatory plantation in the ratio of 1:3 (i.e. planting of 3 trees for every 1 tree that is cut) shall be done with the obligation to provide continued maintenance for such plantations. |
Table 16: Environmental Conditions for Building & Construction – Category A
Category;-b
| S. No. | Medium | Environmental Condition |
|---|---|---|
| 1 | Natural Drainage | The inlet and outlet point of natural drain system should be maintained with adequate size of channel for ensuring unrestricted flow of water. |
| 2 | Water conservations - Rain Water Harvesting and Ground Water Recharge | |
| 2(a) | The unpaved area shall be more than or equal to 20% of the recreational open spaces. | |
| 3 | Solid Waste Management | Separate wet and dry bins must be provided at the ground level for facilitating segregation of waste. |
| 3(b) | Organic waste composter / vermiculture pit with a minimum capacity of 0.3 Kg / tenement / day must be installed wherein the STP sludge may be used to be converted to manure which could be used at thesite or handed over to authorized recyclers for which a written tie- | |
| up must be done with the authorized recyclers. | ||
| 4 | Energy | In common areas, LED / solar lights must be provided. |
| 4(a) | At least 1% of connected applied load generated from renewable energy source such as photovoltaic cells or wind mills or hybrid should be provided. | |
| 4(b) | As per the provisions of the Ministry of New and Renewable energy solar water heater of minimum capacity 10 liters / 4 persons (2.5 liters per capita) shall be installed. | |
| 4(c) | Use of fly-ash bricks: Fly ash should be used as building material in the construction as per the provisions of Fly Ash Notification of September, 1999 and as amended from time to time. | |
| 5 | Air Quality and Noise | Dust, smoke and debris prevention measures such as screens, barricading shall be installed at the site during construction. Plastic / tarpaulin sheet covers must be used for trucks bringing in sand and material at the site. |
| 5(a) | The exhaust pipe of the DG set, if installed, must beminimum 10mt. away from the building. In case it is less than 10mt. away, the exhaust pipe shall be taken up to 3mt. above the building. | |
| 6 | Green cover | A minimum of 1 tree for every 80 sq. mt. of land shall be planted and maintained. The existing trees will be counted for this purpose. Preference should be given to planting native species. |
| 6(a) | Where the trees need to be cut, compensatory plantation in the ratio of 1:3 (i.e. planting of 3 trees for every 1 tree that is cut) shall be done with the obligation to provide continued maintenance for such plantations. |
Category;-c
| S. No. | Medium | Environmental Condition |
|---|---|---|
| 1 | Natural Drainage | The inlet and outlet point of natural drain system should be maintained with adequate size of channel for ensuring unrestricted flow of water. |
| 2 | Water conservations - Rain Water Harvesting | |
| and Ground Water Recharge | ||
| 2(a) | The unpaved area shall be more than or equal to 20% of the recreational open spaces. | |
| 2(b) | The ground water shall not be withdrawn without approval from the competent authority | |
| 2(c) | Use of potable water in construction should be minimized. | |
| 2(d) | Low flow fixtures and sensors must be used to promote water conservation. | |
| 2(e) | Separation of grey and black water should be done by the use of dual plumbing system. | |
| 3 | Solid Waste Management | Separate wet and dry bins must be provided at the ground level for facilitating segregation of waste. |
| 3(a) | All non-biodegradable waste shall be handed over to authorized recyclers for which a written tie-up must be don/e with the authorized recyclers. | |
| 3(b) | Organic waste composter / vermiculture pit with a minimum capacity of 0.3 Kg / tenement / day must be installed wherein the STP sludge may be used to be converted to manure which could be used at thesite or handed over to authorized recyclers for which a written tie-up must be done with the authorized recyclers. | |
| 4 | Energy | In common areas, LED / solar lights must be provided. |
| 4(a) | At least 1% of connected applied load generated from renewable energy source such as photovoltaic cells or wind mills or hybrid should be provided. | |
| 4(b) | As per the provisions of the Ministry of New and Renewable energy solar water heater of minimum capacity 10 liters / 4 persons (2.5 liters per capita) shall be installed. | |
| 4(c) | Use of fly-ash bricks: Fly ash should be used as building material in the construction as per the provisions of Fly Ash Notification of September, 1999 and as amended from time to time. | |
| 4(d) | Use of concept of passive solar design of buildings using architectural design approaches that minimize energy consumption in buildings by integrating conventional energy-efficient devices, such as mechanical and electric pumps, fans, lighting fixtures and other equipment, with the passive design elements, such as building |