[NOTE: The Contents Of This Chapter Are Tentative And The Procedure & Timeline Given Will Be Finalised After The Software For Online Approval Process Is Final]
2.1 Exemption from Permission
In case of compliance with general construction requirements, stability of structure and Part-4 of National Building Code–2016, permission for following activities shall not be required, provided that the permission as per rules shall be necessary for reconstruction, alteration and addition of existing building where structural changes are implied such as construction of column, beam, new load bearing wall, putting new slab, removing old load bearing walls etc. The compliance of fire safety as per Part-4 of National Building Code (NBC) will be necessary for this purpose.
1 Opening or closing of such windows, doors, skylights which are not opened towards any other person’s property.
2 Provision of doors for internal activity.
3 Internal division without violating the minimum parameters.
4 Gardening.
5 White Washing.
6 Colour painting.
7 Refixing tiles on pre-sanctioned coverage. Grouting or repairing of roof (but the construction of the ceiling of mezzanine floor shall not be permissible).
8 Reconstruction of floor.
9 Plastering or partial repair of plaster.
10 Construction of 0.75 meter wide sun-shade on own land.
11 Construction of maximum 1.20 meter high boundary wall from the center line of the road for marking the limit of own plot, but the construction of boundary wall shall not be permissible on the land falling under the width of road prescribed in Master Plan/Zonal Plan/Lay-out Plan.
12 Construction work for implementation of any services by central/ state Government or any local body for the purpose of inspection or renovation or repair of sewer lines, main gulleys, pipe cables or other equipments.
13 Construction of parapet on roof/ terrace/balcony /verandah.
14 Construction of temporary shed (only roof) on removable columns without walls/glazing/jaali etc. on terrace/balcony.
15 Construction of portico/ porch as per norms provided in building bye-laws/regulations.
16 Construction of septic tank/soak pit.
17 Installation of hand pump.
18 Construction of temporary water tank for construction work.
19 Reconstruction of Buildings damaged in natural calamities to their previous state before the damage (provided they were not in unsafe areas) if the construction is in accordance with the Master Plan of the region. In case of unauthorized/ encroached buildings damaged in calamity, re-construction shall
only be permitted on approvals from respective authorities on previously approved layout plans/ maps. For commercial buildings, approval shall be mandatory from respective authority.
20 Construction of necessary structures (including underground tank) for rain water collection, protection and harvesting.
21 In unsafe, prohibited areas under Nainital Municipal Area, the internal division, construction of porch/portico, reconstruction of building shall not be covered by exemption from permission. The above provisions shall be permissible only to the duly sanctioned buildings.
22 Glazed balcony of maximum width 1.80 mt.