11.3Multiple Units(for single stand-alone residential plots)
In order to promote additional housing stock, provision of multiple Housing units on a single Residential Plot is permissible. The total covered area will be within the prescribed FAR limits and the number of residential units, shall be based upon the available approach road width, will be as follows:
S. No.
Existing road width
Minimum area of plot
Number of units
Plains
Hills
1
9.0-18.0mt.
6.0-9.0mt.
500 sq. mt. (in hill area 250 sq. mt.)
6
More than 500 sq. mt. (more than 250 sq. mt. in hill area) one additional unit admissible for increase in plot area for every 125 sq. mt.
2
more than 18.0 mt.
more than 9.0 mt.
750 sq. mt. (in hill area 500 sq. mt.)
10
More than 500 sq. mt. (more than 250 sq. mt. in hill area) one additional unit admissible for increase in plot area for every 125 sq. mt.
Table 22: Provision for multiple housing units on a single residential plot
Note:
• Provision of a minimum 5% open / Green area mandatory
25% of infrastructure development cost is to be deposited as Bank Guarantee or Agreement for mortgaging of property of similar value with the Development Authority.
In such cases in addition to the fixed payable fees, Rs. 50,000 / - for each unit as “unit fees shall be necessarily deposited.
Chapter 11Other Provisions (provisions Specifically Related to Different Buildings / Projects / Areas)
11.1 Core Built Up Area
(i) Built up Zones / core built-up areas are normally defined in the Master Plans. In areas where such zones are not defined in the Master Plans or where Master Plans are not in force, core built up area / Zones in Development Area will be defined by the concerned Department Authorities and by Town and Country Planning Department outside the Development Area of the state.
(ii) Residential and Commercial activities or such activities which are permissible as per zoning regulations will be permitted and following activities will not be permitted.
a. Motel and resorts, multiplex and malls, multistory commercial complex (more than two floor).
b. Offices (except offices of maximum 200 sq. mt. floor area)
c. College, ITI / Poly technique, miscellaneous Technical Colleges, university complex.
d. Hospital, higher / specialized medical facilities.
e. Auditorium, Town Hall, vocational and technical institutions, cinema / theatre, coal Depot, filling and service station.
f. Industrial Units (except such Household units of maximum 30 sq. mt. area) less than 5 Kw capacity employing a maximum of 5 workers.
(iii) Norm for Development and Redevelopment / Reconstructions
a. Minimum Net Plot Area 30 sq. mt. (Residential)&10 sq. mt. (Commercial) Minimum Width 2.0 m (Commercial Plot) Width of Residential Plot as per definition of Housings (EWS,LIG.LMIG) and Plot GIVEN in definitions. In the towns of religious importance the minimum net plot area of guest house shall be 250 sq. mt. in hills and 400 sq. mt. in plains.
b. Front Boundary:
In case where the road is not a Master Plan road the front boundary of the plot will be determined from the center line of the road abutting the plot. The determination of such boundary will be as follows:
S. No.
Existing Road Width
Distance to be left from the centre of the existing road for determination of front boundary
Maximum Height of the buildings
1
Up to 3.0m
1.5m
6.5m
2
3.1 to 4.5 m
2.25m
6.5m
3
4.6 to 7.5m
3.75m
9.0m
4
7.6 to 9.0m
4.5m
9.0m
5
9.1 to12.0m
6.0m
12.0m
6
12.1 to 18.0m
9.0m
12.0m
Table 19: Determination of Front Boundary
In towns of religious importance, the approach road provisions for guest house shall be as follows:
Region
Min approach road existing width
Road widening to be left fully from the plot
Hills
4.5 mt.
Min 1.5 mt.
Plains
7.50 mt.
1.5mt.
Parking if not available within the plot, the same shall be provided within 500mt. from the site at public parking place and the same shall be ensured by the sanctioning authority.
Table 20: Approach road provisions for guest house
c. Norm for Reconstruction of Building in plots upto 200sq. mt.
S. No.
Building Norm
Norm as per Plot size
Upto 100 sq. mt.
(>100-200 sq. mt.)
1
Ground coverage
75%
70%
2
FAR
As per Permissible ground coverage and permissible maximum height
3
Minimum front setback*
1.20
1.80
4
Basement
not allowed
not allowed
Table 21: Norm for Reconstruction of Building in plots upto 200 sq. mt.
Note: *Existing setback will prevail in cases where the existing setback are greater than the above mentioned setbacks.
(iv) For Plots upto 200 sq. mt. Plot Area and abutting on a minimum of 9.0 m width road maximum 20% of the permissible Ground coverage can be used as basement in Commercial / Mixed Buildings. Such basement will be used only for storage.
The approach to such Basement will be in the form of internal staircase / ramp.
(v) For Corner Plot of upto 100 sq. mt. Area the provision of road side setback on sides and rear will not be mandatory. Such plots having an area of 101 sq. mt. to 200 sq. mt., a minimum of 1.0
mt. road side setback is required. In case where the existing setback is greater than the required setback the provision existing of setback will prevail.
(vi) For plots greater than 200 sq. mt. Area provision of ground coverage, FAR, minimum front setback and basement will be as per the respective provisions of the byelaws. Basement will not be permissible in Residential / mixed use Building and in Building abutting on roads less than 9.0 m width.
(vii) Sub division of Plots will be as per sub division bylaws and with a minimum Area of such sub divided plots shall be 40 sq. mt.
(viii) For non-residential use building on roads less than 9.0 mt. or plot size less than 200 sq. mt. public parking shall be developed by the sanctioning authority. For this purpose parking fee shall be charged at the time of sanctioning plan which shall be computed based upon the circle rate of the required parking area in the project. This fee shall be deposited in an ESCROW account for parking fund and shall be used exclusively for developing public parking spaces in or near core areas.
(ix) A maximum of 40% width of front setback (front setbacks to be determined after having the required Right of way of public roads) can be used for sunshade, projection, Balcony etc.
(x) Plinth Level: minimum 0.45 mts. from ground level.
(xi) Horizontal and vertical expansion will be permitted subject to the structural safety of such building. The expansion will be permitted in cases where the required right of way and setback condition are adhered to. Such expansion will be permitted within the FAR limits.
11.2 Single Residential
(i) Normally, in open / undeveloped areas, individual single residential units will bepermitted only if the sub divided plot is part of a larger approved layout plot.
(ii) However, in special circumstances, after due permission from the sanctioning authority, such stand-alone plots situated within the urban local body limits, which have not been sub divided from a larger open area and where the width of the road is less than the required width, permission for construction can be granted after leaving required land for right of way to ensure minimum road width and required setback.
11.4Group Housing / Sub Division Layout
(i) The project of group housing / sub-division layout shall be classified on the basis of their areas as follows:
S. No.
Habitat Description
Plains
Hills
Area (Ha)
Area (Ha)
Min
Max
Min
Max
1
Sub Cluster
0.20
2.0
0.10
1.0
2
Cluster
2.01
6.0
1.01
3.0
3
Neighborhood
6.01
20.0
3.01
10.0
4
Township
20.01
40.0
10.01
20.0
5
Special Township
Above 40.0
Above 20.0
Table 23: Classification of Group Housing / Sub-division layout
Note The detail provision of Special Township shall be fixed separately
(ii) Registration ofRegistered Habitat Developer in the respective Habitat category is mandatory.
However, for layout (sub-division) projects of less than one acreand for projects (layout and group housing) Within the Development Area / Special Development Area, such registration is not mandatory. Processing fee for such projects is Rs 50,000.00and for projects of area more than one acre, the processing fee and Bank Guarantee will be as per the provisions of Group Housing.
(iii) Dwelling Unit Density: 500 Dwelling unit per hectare(For Hills and Plain)
S. No.
Plot Size
Dwelling Unit Density
1
Upto 200 sq. mt. Plot size
1 Unit
2
200 sq. mt.- 300sq. mt.
2 unit
3
300- 500sq. mt.
3 unit
4
> 500sq. mt.
as per density defined for multiple units
Table 24:Calculation of Dwelling Unit Density for Layout Plans
On the basis of the proposed population in Group Housing and Layout Schemes, facilities and services viz. health education shall be provided in the projects as mentioned in clause 7.5. Further, for the proposed population in the project, sufficient provisions shall be made w.r.twater supply, electricity, sewer etc. as per the prevailing norms and standards.
The proposed density shall be permissible based upon the availability of potable water demand projected for next ten years, for which NOC from the concerned Authority shall be obtained.
(iv) Internal Road Width (Residential Group Housing and Layout Schemes)
S. No.
Minimum Road Width (mt.)
Maximum Road Length (mt.) (if it is not in the form of loop street)
Plains
Hills
1
7.5
2
100m
2
9
3
200m
3
9
4.5
400m
4
12
6
800m
5
15
7.5
1000m
6
18
9
1000m
7
Minimum width of loop street 9.0m
Minimum width of loop street 6.0m
Minimum length 400m
a. Width of such Roads,havingPark / Open space / Inactive uses on one side will be 7.5m in plain and 4.5m (motor-able) 2.0m (pedestrian) in Hills.The maximum length of such road will be 200mt.
b. In EWS and LIG layout schemes the minimum internal roads will be 6.0 mt. in plains and 4.5 mt. (for motor-able roads) and 2.0 mt. (for pedestrian Pathways) in Hills.
(v) Other Provisions
In Group Housing and sub-division layout projects the following facilities / services will be provided in proportion of the total scheme area. In Building where vertical mix uses are permitted the proportion of Public / Semi Public and commercial use will be based on the total FAR of the project
S. No
Uses / Facilities
Plot size
2000 to 4000 sq. mt.
4000 sq. mt. to 2.0 Hectare
More than 2.0 Hectare
1
Public / Semi Public (Uses ancillary to Residential viz. Educational / Health / Club House / Community Hall etc.
-
Minimum 1.0%
Minimum 5.0%
2
Commercial
-
Maximum 1.5%
Maximum5%
3
Organized Green Spaces
Minimum 5%
Minimum 10%
Minimum 15%
Table 25: Facilities / Services in Group Housing and sub-division layout projects
Note:The above facilities will be based on the Population norms as defined in para 7.5
(vi) Light and Ventilation
In buildings of upto 12.0 mt. height, habitable rooms, where light and ventilation is provided through internal green spaces, the minimum area and width of such spaces will 7.5sq. mt. and 2.5sq. mt. respectively. For building of more than 12.0m height the minimum width of much spaces will be 3.0 m and the area shall be equal to 1 / 5 t h of the height of the adjacent highest wall (e.g. If the height of the highest wall is 21 mt., then the minimum area of the internal open space shall be (21*1 / 5)= 17.64 sq. mt.
S. No.
Building Height (in mt.)
Area (in sq. mt.)
Minimum Width (mt.)
1
Upto 7.0m
1.2
0.9
2
Upto 12.0m
2.8
1.3
3
Upto 18.0m
4.0
1.5
4
Upto 21.0m
5.4
1.8
5
More than 21.0m
6.0
2.0
Table 26: Size of Ventilation shaft
(vii) Guard Room of maximum 1.6sq. mt. Plinth Area (Minimum width / radius 1.2m)is permissible at the entrance subject is the condition that such construction will not be within the setback required for fire safety
11.5 Affordable Housing
As per the housing policy and the rules (annexure- )
11.6Public facilities and Services
S. No.
Main category
Sub-category
Population Standards
1
Educational Facilities
Nursery School / Crèche
1 for 2500
Primary school(upto class 5th ) (max G+I)
1 for 5000
Middle school (upto class 8th )
1 for 6000
High school / intermediate (upto class 5th to 10th or upto th12 )
1 for 7500
Integrated school (upto class 1-12th )
1 for 15000
ITI / Polytechnic
Degree college
2
Miscellaneous Educational Facilities
MBBS
Engineering
Other professional / technical institutions
Schools for handicap people
(one for city level)
University campus
3
Medical facilities
Dispensary / diagnostic center
Nursing home / maternity center / polyclinic
1 for 15000
Primary health center
1 for 20000
4
Social and cultural facilities
community building / library
1 for 15000
Other community building
Extension counter with ATM
(i) floor area for counter (ii) floor area for ATM
1 for 15000
5
Other services
Sub-post office
1 for 10000
Police station (with residence for employees)
1 for 15000
Police station (with residence for employees)
1 for 50000
Computerized Railway reservation counter
1 for 5000
Electricity services
(i) 11 KVA
1 for 15000
(ii) 33 KVA
1 for 25000
(iii) 66KVA
1 for 50000
Table 27:Public facilities and Services
11.7Eco Resorts
(i) After utilizing the maximum ground coverage, the rest of the plot area shall be necessarily kept as soft ground. Parking & other internal pathways / passage shall be developed necessarily / essentially as brick on edge or loose stone pavement.
(ii) The Maximum height of the building permissible shall be 7.5 mt. maximum upto two floors(ground and first). The roof of the first floor shall be necessarily pitched / sloping
(iii) Basement shall not be permissible
(iv) Where approach road to the site is not available as per norms and is approached by pedestrian pathway or ropeway, in such cases parking provision shall be made by the developer on the road head (on the motor-able road from where the pedestrian pathway or ropeway starts). In such cases, due to constraint of fire tender reaching the site, the developer will have to provide fire safety measures all by himself and such proposals shall be scrutinized and given NOC by fire department for their sufficiency. Such NOC shall be renewed by fire department every two years.
(v) In the premises of Eco Resort, the internal pathways shall be necessarily used as a walking trail & asper the necessity battery operated vehicle may be used.
(vi) The proposal of sewerage disposal shall necessarily be inspectedby Jal Nigam
(vii) In the open areas minimum of 125 trees per hectare shall be planted necessarily
(viii) 60% of the employment shall be given necessarily to the local people of the State& an affidavitin this regard shall be taken from the applicant. In case of violation of the said rule procedure or steps shall be taken to cancel the approval of map.
(ix) Other provisions, guidelines issued by MOEF for eco-tourism in and around protected areas on date 2ndJune,2011 mentioned below shall be necessarily complied:
a. As part of the State-level Ecotourism Strategy, the Stategovernment should levy a “Local Conservation Cess” as a percentage of turn-over, on all privately-run tourist facilities within 5km of the boundary of aProtected Area. The rate of cess should be determined by the State Government, and the monies thus collected should be earmarked to fund Protected Area management, conservation and local livelihood development, and not go as revenue to the State Exchequer
b. Tourist infrastructure must conform to environment-friendly, low-impact architecture; renewable including solar energy, waste recycling, rainwater harvesting, natural cross-ventilation, no use of asbestos, controlled sewage disposal, and merging with the surrounding landscape, Theabove provision shall be monitored by project sanctioning authority
c. All tourism facilities located within 5 km of a Protected Area must be reviewed regularly by the Local Advisory Committee vis-a-vis environmental clearance,area of coverage, ownership, type of construction, number of employees, etc. for suggesting mitigation / retrofitting measures if needed
d. All tourism facilities located within five kms.ofa Protected Area must adhere to noise pollution regulations under “The Noise Pollution (Regulation and Control) Regulations“. 2000, and “The Noise Pollution Control Regulation and Control) (Amendment)Regulations.” 2010 issued by the Ministry of Environment and Forests.
e. All tourist facilities old and new must aim to generate at least 50% of their total energy and fuel requirements from alternate energy sources that may include wind, solar and biogas.
f. There shall be a complete ban on burning ordisposing non-biodegradable waste within theProtected Area or in surrounding eco-sensitive zone or buffer area.
g. The use of wood as fuel shall be prohibited except for campfires for which wood must be procured from State Forest Department / Forest Development Corporation depots.
h. In order to allow free passage to wildlife, development should be sensitive to the conservation of flora and fauna, and the corridor value of the area.
11.8Service Apartments
Service apartments shall be self-contained apartments which shall have food facility (kitchen / pantry) within them & shall be used as a livable spaceor residence for a duration of short term. Other requirement:
a. Maximum of 20% of the permissible F.A.R of the hotel / offices, institutional or their campuses may be used for service apartments
b. Within the commercial land use category, minimum of 1000 sq. mt. plot area may be utilized for the service apartments as a standalone project. In the commercial use category prescribed Ground Coverage, F.A.R &Setback shall be permissible In such projects, Maximum of 20% of the total F.A.R may be used for office, conference facility, guest room and service shops
11.9 Industrial Units
As per the norms stipulated in Part-C of these Byelaws.
11.10Multiplex
(i) In a multiplex, the cinema hall, commercial activities and other recreation facilities may be providedin a single complex
(ii) In a multiplex, minimum two cinema auditoria is compulsory
(iii) The maximum seating capacity of a single cinema hall shall be 350 seats
(iv) The minimum seating capacity of a single cinema hall shall be 250 seats in plain and150 seats.in hill areas.
(v) Minimum area and width of plot- For multiplex the proposed site / plot area shall be minimum 2500 sq. mt.and width of plot shall be minimum 32.0 mt. in plain areas. In hill area the plot area shall be minimum 1500 sq. mt. and width of plot shall be minimum 24.0 mt.
(vi) Approach Road- For construction of the multiplex, apart from the existing road, provision of minimum 7.5m wide access lane shall be necessary on any other side of the plotafter the fixed setback has been provided. In addition to the front setback, provision of 7.5 mt. service lane is to be provided towards the main road for efficient circulation space of the vehicles.
(vii) In the multiplex plot, minimum 25% of prescribed setback area shall be necessarily used for plantation
(viii) The planning, designing and fire prevention provisions shall be ensured according to the relevant provisions of Uttar Pradesh Cinematography Regulations, 1951 and National Building Code and IS 4878. Other necessary services and facilities in the multiplex shall be drinking water, sanitary facilities, canteen etc. General provision may be made according to the prescribed standards.
(ix) In case the multiplex project is proposed outside the controlled area, due to land upgradation / conversion, a fee shall be payable, according to the GO, which shall be deposited in the prescribed Government head office.
(x) For other activities / facilities to be provided in addition to the cinema hall within the multiplex, a permission andno objection certificate shall be necessary as per the act / regulations / regulations of the Center or State. Only after the provision of the permission and no objection certificate shall the sanction of layout be considered.
(xi) To ensure the time bound construction of the multiplex, at the time of sanctioning of layout, the applicant shall be liable to pay the concerned agency a bank guarantee of 20% of the calculated price of existing residential sector rate. In case of non-availability of rates with the authority, the bank guarantee shall be liable of total area of the proposedplot according to theexisting general residential circle rate as prescribed by the district magistrate. In the case of mixed-use project, the bank guarantee shall be payable on total covered area of the multiplex.
11.12New Cinema Hall
(i) Minimum area and width of plot- For the proposed site / plot area shall be minimum 1500 sq. mand width of plot shall be minimum 30.0 mt. in plain areas. In hill area the plot area shall be minimum 1000 sq. mt.
(ii) Approach road
S. No.
Seating capacity
Plain area
Hill area
1
Upto 150
12.0 mt.
9.0 mt.
2
Upto 150-300
18.0 mt.
9.0 mt.
3
More than 300
24.0 mt.
12.0 mt.
Table 28: Approach Road for New Cinema Hall
(iii) Setbacks
Seati ng Capa city
Plain area (mt.)
Hill area (mt.)
Front
Back
Side 1
Side 2
Front
Back
Side 1
Side 2
Upto150
12.0
6.0
6.0
6.0
7.5
6.0
6.0
6.0
Upto150-300
15.0
6.0
6.0
6.0
9.5
6.0
6.0
6.0
More than300
18.0
6.0
6.0
6.0
12.0
6.0
6.0
6.0
Table 29: Setbacks for New Cinema Hall
(iv) Ground coverage and FAR- Maximum PERMISSIBLEground coverage 45% and FAR 1.20 Maximum 5%of FAR shall be admissible for construction of commercial establishment.
(v) Parking Provision- Owing to the mixed-use building the provision for every 100 sq. mt. covered area or PART THEREOF,2.50 equivalentcar space shall be necessary.
(vi) Other requirements- The planning, designing and fire prevention provisions shall be ensured according to the relevant provisions of Uttar Pradesh Cinematography Regulations, 1951 and National Building Code and IS 4878. Other necessary services and facilities in the multiplex shall be drinking water, sanitary facilities, canteen etc. General provision may be made according to the prescribed standards.
(vii) In addition of aforesaid, other provisions shall be complied according the related issued Government Orders from time to time.
11.13Multi-Level Parking
(i) Multi- level parking shall be permitted in assigned parking sites in master plan / zonal plan / layout plan orwithin residential / commercial and offices, public semipublic facilities, transportation and travel node etc. with the following norms:
(ii) Minimum size of the plot for the multi – level car parking shall be 1000 sq. mt. One side of the plot shall be necessarily of 25mt. width
(iii) Maximum ground coverage permissible for the multi-level car parking plot shall be 66.6% & F.A.R including the basement shall be 3.0
(iv) To cross subsidize the construction cost / viability of the multi – level car parking, maximum of 25% of total floor area ratio may be used for commercial / offices and recreational purposes.
(v) Minimum travel distance from the exists shall be 30 mt. Minimum two exits shall be provided for each floor.
(vi) Maximum gradient of ramp shall be admissible only 1:0. Provision of fire escape staircase shall be in addition to this.
(vii) The structural design of the floor slabs shall be designed based upon the load imposed by the vehicles and the vibrations etc. shall be taken into account. The ground floor and the passages shall be designed to take up the load of 6 tone weight safely.
(viii) On every floor of parking the proper natural / artificial light provisions and sufficient ventilation (minimum) 1 / 20 area of floor area) shall be necessary. In addition to aforesaid minimum 5% of floor area, smoke outlet shall be necessary.
(ix) In addition to parking area the provision of ticket house, rest room, guard room, equipment room inside the same campus may be made. In addition to the above,a waiting space for vehicles of minimum 150 sq. mt. on anyfloor of parking or minimum 1 / 10 vehicles of number of purposed vehicle in total parking lot, awaiting space shall be necessary. In addition to the above,waiting space for passengers shall also be provide.
(x) The provision of a lift for every 50-75 vehicles may be made. The platform of lift shall be minimum 2.80x 5.40 mt. and wall shall be constructed by the inflammable materials.
11.14Habitat Center
(i) The minimum area of plot shall be 1 hectare & the minimum width of the plot shall be 36 mt.
(ii) The ratio of different activities permissible under the habitat center are mentioned in the table below
S. No.
Activity
Permissibility
1
Office / commercial center
Minimum 30.0% of FAR
2
Social and cultural facilities / community center
Minimum 30.0% of FAR
3
Hotel / service apartment / guest house
Maximum 5% of FAR
4
Food court / restaurant
Maximum 15.0% of FAR
5
Organized parks and plantation
Minimum 15.0% of plot area
6
Outdoor recreational activity
Maximum 10% of plot area
Table 30: Ratio of different activities permissible under the habitat center
(iii) Permissible use under different activities:
S. No.
Activity
Permissible Use
1
Office
Office complex, Conference Halls, Board rooms
2
Commercial center
Convention hall, Business center
3
Social and cultural facilities / community center
Premier cultural and entertainment center, Exhibition Area, Visual Art Gallery and library, Health club with spa, Multi-purpose hall
4
Hotel / service apartment / guest house
Guest rooms
5
Food court / restaurant
Specialty restaurants, Food courts
6
Outdoor creation activities
Amphitheatre, Kiosks, food court sitting areas
Table 31: Permissible use under different activitiesunder the habitat center
11.15Filling Station / Filling & Service Station
(i) Generally, Filling Station / Filling &Service Stationshall be permissible only as per zoning regulations of the Master Plan of the city.
(ii) In other land use in the master plan other than above, the construction of filling station / filling & service station shall be admissible after the change of land use by the Government. Such cases shall only be considered on merit basis after submission of 75% of total plot area circle rate as land use change fee.
(iii) Proposed filling station and filling cum service station situated on the National, State and other main roads in agriculture / rural areas lying outside the master plan and such open / undeveloped / barren areas whose land use is not prescribed under the master plan, such casesshall be considered only after submission of75% of total plot area circle rate as land upgradation fees.
(iv) Situation of plot and requirement:
S. No.
Requirement
Outsidethe limit of urban local bodies in plain area
Hill areas / Within the limit of urban local bodies in plain area
1
Minimum width of approach road
30.0 mt.
18.0 mt.
2
Distance between two filling stations on one side of the road
1 km.
30.00 mt.
3
Minimum distance of exit and entranceof filling station from theT-Junction / Crossing
60.0 mt.
60.0 mt.
4
Width of the exit and entrance roads in filling station
9.0 mt.
7.5 mt. and 9.0 mt. for filling & service station.
T-Junction / Crossing means meeting of roads of width not less than 9.0 mt. in plains and 6.0mt. in hills.
Table 32: Situation of plot and requirement in Filling Station / Filling & Service Station
Note: Other requirement for plot situated outside the limit of urban local body areas in plain area-
(v) Generally entrance and exit of filling & service station situated on National and State Highway shall be from service lane, whose minimum width shall be 9.0 mt. The inter distance between the entrance and exit of the service lane from the Highway shall be necessarily minimum 200 mt. and such service lane shall be separated from the highway with a buffer strip of minimum 3.0 mt. width.
(vi) Such filling & service stations, which are proposed without service lane, shall leave 30.0 mt. from the center of the road for road widening.
(vii) Size of plot:
S. No.
Activity
Outside the limit of ULBs in plain area
Hill areas / Within the limit of ULBs in plain area
F. A. R.
1
Filling station
35.0x 35.0 sq. mt.
20.0x20.0 sq. mt.
0.05
LPG, CNG- 30.0x30.0 sq. mt.
2
Filling station cum service station
35.0x 45.0sq. mt.
25.0x30.0 sq. mt.
0.15
LPG, CNG- 35.0x 40.0 sq. mt.
3
Filling cum service station-cum departmental show rooms
37.0x47.0 sq. mt.
25.0x35.0sq. mt.
0.20
LPG, CNG- 35.0x45.0 sq. mt.
Table 33: Size of Plot in Filling Station / Filling & Service Station
Note: urban local body in Development Area mean the area of urban local body plus the area of 3.0 km around the boundary of such urban local body.
(viii) Provision of setback and buffer strip:
After leaving the right of way as required by the norms, a buffer strip of minimum width shall be provided between the right of way and the plot boundary as follows:
Location
Length of buffer strip (mt.)
Width of bufferstrip (mt.)
Minimum distance of buffer strips and fuel point (mt.)
Outsidethe limit of ULBs in plain area
12.0
4.0
4.0
Hill areas / Within the limit of ULBs in plain area
5.0
3.0
4.0
Table 34: Provision of setback and buffer strip in Filling Station / Filling & Service Station
Note:
No construction shall be admissible within the distance left between the buffer strip, setback and the fuel point. A kerb of minimum 27.5 cm height shall be constructed all along the buffer strip.
Minimum 3.0mt. - 3.0mt.setbacks shall be left on both the sides and rear side of the plot. In the rear setback, a generator room of maximum 6.25 sq. mt. may be permitted.
(ix) Construction related requirements.
a. The construction of the canopy shall be admissible as a temporary structure after the setback line whose minimum height from the ground shall be 6.0 mt.
b. Height of the lubritarium and other ancillary buildings like office, store compressor room service station etc. shall be maximum 6.0 mt. These buildings shall be atleast at distance of 4.0 mt. from the fuel point.
c. Parking: For every filling station / filling &service station minimum 80 sq.mt. parking spaceshall be reserved.
d. Fire safety: fire norms shall be strictly adhered to and NOC from Chief Controller, Explosives shall be obtained.
(x) Other requirements
a. There shall be no obstruction in the form of construction near the filling station / filling &service station so that it may not pose visual hindrance and conflict between the movements of vehicles on the highway tothe movement of vehicles to filling station.
b. Other provisions, as stipulated by Indian petroleum and explosive act, shall apply.
c. In addition to aforesaid provisions, the following special provisions for LPG auto gas station shall be adhered to:
• To ensure the safety maximum storage capacity shall be up to 10 metric tons only.
The separate parkingprovision shall be made for road tanker, in which sufficient area shall be available so that there is no need to reversetheroad tanker.
Other LPG filling facilities / utility buildingsfrom other buildings shall be as follows.
Table 35: Distance of LPG filling facilities / utility buildings from other buildings
In miscellaneous type of filling stations for LPG,petrol / diesel, CNG as follows, the inter-distance within the filling station shall be as follows:
S. No.
LPG Filling Facilities
LPG tank with submersible pump
Extended fill connection of LPG tank
LPG dispenser
Fill connection of LPG vehicle
1
LPG tank with submersible Pump
-
-
3mt.
3mt.
2
Extended fill connection for LPG tank
-
-
3 mt.
3 mt.
3
LPG dispenser
3 mt.
3 mt.
-
-
5
Fill connection of LPG vehicle
3 mt.
3 mt.
-
-
6
Underground petrol tank, manhole or filling point
1.5 mt.
3 mt.
3 mt.
3 mt.
7
Petrol tank vents (in plan)
3 mt.
11.11Old Cinema
(i) For the encouragement of reconstruction of mini cinema hall with commercial complex in place of demolished old cinema hall,the following standards shall be prescribed:
(ii) This provision shall be applicable only to the plot limits of old cinema halls. By any means these provisions shall not be admissible in any new proposals and new areas. Plots available after the demolition of the existing cinema halls, only the permission of construction of the mini cinema hall and commercial establishment shall be given. Hotel / lodge construction shall not be admissible on these plots.
(iii) Approach Road- Plot of existing building shall have approach road width of minimum 12.0 mt. and 9.0 mt. in plain and hill areas respectively and in any condition shall not be admissible on existing approach road width of less than 9.0 mt. and 6.0 mt. in plain and hill areas respectively. If approach road width is provided on width less than 12.0 mt. and 9.0 mt. in plain and hill area respectively,then the required remaining width of the road shall be left essentially for road wideningby the applicant after which the front setback shall be left. Such cases shall not be given the provisions of compensatory FAR.
(iv) Seating capacity – maximum two mini cinema hall shall be admissible on the plot and the total seating capacity on these two cinemas shall be 200 to 250, collectively.
(v) Maximum height- The maximum height of the reconstructed building shall be 15.0 mt. within which construction of Ground and additional two floors shall be permissible. Within the provisions of permissible height, FAR and permissible floors, permission for construction of commercial complex apart from mini cinema shall bepermissible.
(vi) Setback- front setback shall be shall be 12.0 mt.after leaving the required space forroad widening: side setbacks - 3.60 mt. on both sidesand 6.0 mt. as rear setback hall be essential.
(vii) Maximum ground coverage 45% and FAR 1.20 shall be admissible.
(viii) Parking Provision- considering the mixed-use building, parkingprovision shall be1.50 equivalentcar space for every 100 sq. mt. covered area
(ix) Other requirements- The planning, designing and fire prevention provisions shall be ensured according to the relevant provisions of Uttar Pradesh Cinematography Regulations, 1951 and National Building Code. Other necessary services and facilities in the multiplex shall be drinking water, sanitary facilities, canteen etc. General provision may be made according to the prescribed standards.
(x) In addition of aforesaid, other provisions shall be complied according the related GO issued from time to time
11.17LPG Gas Godown
(i) Permissibility of LPG Gas Godown shall be according the Zoning regulations of master plan. In case no provision is there in master plan, it may be allowed as per the following provisions after receiving theland up gradation fee from the applicant at commercial rate.
(ii) The approach road to the site shall be 12.0 mt. in the plains and 7.5 mt. in the hills.
(iii) The minimum plot size in plains shall be 1000sq. mt. and 750 sq. mt. in the hills.
(iv) Setbacks
S. No.
Total Capacity of Compressed Gas in Cylinders stored in Godown
Min Setback
1
4000 kg
6.0 mt.
2
4001 - 8000kg
7.0mt.
3
8001 - 12000kg
9.0 mt.
4
12001 - 30000kg
12.0 mt.
5
more than 30,000kg
15.0 mt.
Table 38: Setbacks to be provided for LPG Gas Godowns
(v) Ground coverage and FAR:The maximum permissible ground coverage shall be 25% and FAR 0.25in which construction of office and 1.6 sq. mt. area for guard room may be constructed.
(vi) Height of building: The minimum height of gas Godown shall be 6 mt. and no construction shall be allowed in further upper part.
(vii) Total area of windows and ventilators provided shall be equivalent tominimum of 10% area of floor area
(viii) Others requirement:
a. Gas go down shall made of inflammable materials.
b. For construction of gas godown, the no objection certificate from local fire department and Chief Controller, Explosive shall be obtained necessary.
11.16Farmer Service Centre
(i) Farmer Service center shall be permissible on roads other than National and State Highways.
(ii) Generally, Farmer Service center shall be permissible only as per zoning regulations of the Master Plan of the city, it shall not be permissible in other land uses.
(iii) Farmer Service center proposed on roads in agriculture / rural areas lying outside the master plan and such open / undeveloped / barren areas whose land use is not prescribed under the master plan, such casesshall be considered only after submission of fee equivalent to 75% of total plot area circle rate as land up-gradation fees.
(iv) Plot location and requirement:
S. No.
Requirement
Plains
Hills
1
Minimum width of approach road
18.0
9.0mt.
2
Minimum distance from the center of the road to plot boundary
15.0 mt.
9.0mt.
3
Inter- distance between two farmer service centers on one side of the road.
5kms.
3 kms.
4
Minimum distance of entrance and exit from crossing / T junction of approach road
60.0 mt.
60.0 mt.
5
Width of entrance and exit passages to the farmer service center
9.0mt.
9.0 mt. for departmental showroom & service station. 7.50 mt. for farmer servicecenter
Table 37: Plot location and requirement in Farmer Service Centers
Note:T-Junction / Crossing means meeting of roads of width not less than 9.0 mt. in plains and 6.0mt. in hills.
(v) The remaining provisions shall be according the filling station.
(vi) Other requirements-
a. The farmer service center will well equipped with mainly seats, plants, insecticidal, agricultural plants.
b. There shall be no obstruction in the form of construction near the farmer service center so that it may not pose visual hindrance and conflict between the movements of vehicles on the highway tothe movement of vehicles to filling station.
c. Other provisions, as stipulated by Indian petroleum and explosive act, shall apply.
11.18Farm House
(i) Utility of farm house shall be for agriculture
(ii) Minimum area of plot shall be 0.4 hectare (4000 sq.mt.)
(iii) Maximum ground coverage shall be 20% which shall not be more than 1000sq. mt. in plains and 600 sq. mt. in the hills. Maximum three fourth of above coverage may be utilized for residential purpose and minimum one fourth of the ground coverage shall be used for animal shed, storage of machinery, servant quarter, etc. If the provision of animal shed, storage of machinery, store is made inside the stilt, the same shall be not counted towards the ground coverage and height of the building.
(iv) Restriction of height –
a. Farm house shall be of maximum two floors The maximum height of the permanent / temporary construction from the ground floor shall be 7.5 mt., mezzanine floor shall not be permissible
b. The maximum height of farm shed shall not be more than 4.5 mt.
(v) In case of construction of boundary wall this height shall not be more than 1.0 mt. Animal shed shall be made on pillars whose walls shall not be more than 1.2 mt. The remaining height shall be covered with netting material.
(vi) Setbacks:
a. Front setback: 15.0 mt. (towards wider road in case of corner plot irrespective of the approach taken). Guard room shall be permissible near gate.
b. Other setbacks:
Side 1 - 7.5 mt.
Rear - 7.5 mt.
Side 2- 1.5mt.
c. Minimum 8.0 mt. distance shall be maintained between residential unit and other activities.
(vii) Permission for farmhouse shall be considered after leaving the right of way / green verge.
(viii) Approach road:6.0 mt. in plains and 4.0 mt. in hills. Sanctioning authority may relax the norms by 25% depending upon the merit of the project.
(ix) Minimum 15% of the plot shall be afforested in which minimum 100 trees per hectare shall be planted.
(x) Septic tank / soak pit shall be atleast 4.5 mt. away from the boundary wall and 15.0 mt. away from the water well so that the potable water table is not contaminated.
(viii) Essential Provision for EWS Houses
a. It is mandatory to provide for EWS dwelling units in group housing / layout projects. Such units will be of a Maximum of 4 storeys (Ground and three additional floors) to be constructed as separate building blocks
b. It will be mandatory to construct 15%of the total Housing stock proposed in the project for EWS Housing. The procedure for approval of such units and their price will be determined
by the government from time to time. The required EWS units will either be constructed in the project area or as a separate project within a maximum radius of 5 kms. from the basic project site. The suitability of such sites will be determined by the sanctioning authority.
However in case of smaller housing project (of plot area less than 5000 sq. mt.) the above provision is not mandatory. As an alternative and in lieu of constructing EWS housing stock the Developer of such project will have the choice of depositing the “Shelter Fund” with the sanctioning authorities. The fund will subsequently be used for land pooling, land development and building construction and related works for EWS housing stock. The Shelter fund amount to be calculated as per Government directions from time to time.
c. The ground coverage of EWS housing units will be included in the calculation of total ground coverage and FAR of the project.
d. Parking for EWS units will be calculated on the basis of ECS per 4 EWS units.
e. Parking in the form of open parking is mandatory.
f. Completion certificate from Empanelled structural Engineer of such units certifying that such buildings are designed and constructed in accordance with the provision of Part IV (structural design)of NBC
(ix) Document to be submitted along with building plan of group housing / layout projects
a. ITR of firm / company / trust and memorandum of trickle of firm / company, registered habitat developer’s registration and regulations / regulations regarding related of formation functioning resident welfare of association
b. Group housing projects and residential layout where building construction is proposed as per typical building plan certificate from empanelled structural engineer / authorized technical institute / universities certifying that such building comply with the provision of part iv (structural design) of NBC
c. Drawing and necessary document in the required formats related to services via electricity, water supply, sewage disposal and the like to be duly signed by the architect and the drawing should comply with BIS wide
d. NOC from fire safety officer / fire department on the relevant maps / drawing related to fire safety provision
e. Registered affidavit of applicant / developer station that occupancy of that will be permitted after obtaining completion from the functioning authority
f. Original sale deed along with latest chatauni ofthe land (project area) prior to secluding of the project 25% of the w.r.t. of development of proposed infrastructure as bank guarantee in favor of sanctioning authority an agreement or hypothecation part properly equivalent is the above amount in favor of the sanctioning authority
3 mt.
3 mt.
3 mt.
8
Petrol pumps / Dispensers (Flameproof)
3 mt.
3 mt.
1.5 mt.
1.5 mt.
9
Diesel fuel pumps / Dispensers (Flameproof)
3 mt.
3 mt.
1.5 mt.
1.5 mt.
10
Site boundary, buildings, fixed source of ignition
7.6 mt.
7.6 mt.
4.25 mt.
4.25 mt.
Table 36: Inter-distance within the filling station
11.19Dairy Farm
(i) Approach Road: The facility of access from main road (NationalHighway / State Highway / District roads / Master Plan roads / Zonal Plan roads)to dairy farm in plain area minimum 9.0 mt. and in hill area 4.5mt. existing width shall be available.
(ii) Minimum Plot Area:
a. Plains: 2000 sq. mt.
b. Hills: 1000 sq. mt.
For animals more than 200, plot area shall be increased by 100sq. mt. per 10 animals.
Minimum frontage of plot shall be 25.0 mt.
(iii) Minimum 15% of the plot shall be afforested in which minimum 100 trees per hectare shall be planted.
(iv) Setbacks:
a. Front setback: 15.0 mt. (towards wider road in case of corner plot irrespective of the approach taken). Guard shall be permissible near gate.
b. Other setbacks – 7.5 mt.
(v) Minimum 8.0 mt. distance shall be maintained between residential unit and other activities.
(vi) Restriction of height
a. Dairy Farm shall be of maximum two floors The maximum height of the permanent / temporary construction from the ground floor shall be 7.5 mt., mezzanine floor shall not be permissible
b. The maximum height of farm shed shall not be more than 4.5 mt.
(vii) In case of construction of boundary wall this height shall not be more than 1.0 mt. Animal shed shall be made on pillars whose walls shall not be more than 1.2 mt. The remaining height shall be covered with netting material.
(viii) Disposal of drainage, dung and rubbish- The proper disposal of drainage to the disposal site shall be made.The disposal of dung and affluent shall be made after the treatment through the gobar gas plant, septic tank, compost pit or other appropriate technique.
(ix) Other requirements- Other requirement for dairy farm such as size of cattle shed, cattle feed collection, milk collection / protection / management of storage, maintenance office, animal husbandry and delivery facilities, houses of employee of management, water tank, dung gas plant etc. shall be according the standards of National Dairy Research Institute.
11.20Farm House For Animal / Bird / Insect Rearing, Pisciculture and others
(i) In such farm houses plot area shall be minimum 5000 sq.mt. and ratio of width and length of plot shall be minimum 1:3.5
(ii) Approach road: Approach road having length upto 500 mt., shall be minimum 7.5 mt. in width.
(iii) Maximum Ground coverage:Residence for the employees: @75sq. mt. / hectare.
a. Poultry: 15% of total plot area.
b. Animal shed: 5% of total plot area
c. Pisciculture: 2% of total plot area
(iv) Setback:
a. The distance of building from the boundary of the plot shall be minimum 7.5 mt. as open space on allthe sides. The boundary wall shall be permissible of maximum 1.50 mt. height.
b. Minimum 6.0 mt. distance shall be maintained between the residence and farm shed building.
c. In poultry farms, the setback area shall be left open without any plantation and shall not be cemented whereas in other types of farms,minimum 3.0 mt. wide green plantation strip shall be afforested in 30% area of the setback.
(v) Underground and surface rain water collection tanks shall be permissible whose coverage shall not be counted towards the ground coverage,
(vi) The above areas shall be determined after leaving road widening areas.
(vii) Height of buildings-
a. The maximum permissible height of building for residential use shall be 6.0 mt. in which roof shall be sloping and the provision for collection of rain water is must.
b. Except the poultry the maximum height of other farm shed shall be permissible up to only 4.5 mt. For poultry, height shall be 6.0 mt. or ground andfirst floor whichever is less, shall be permissible. In these mezzanine floor shall not be permissible.