(1) Any person who intends to erect, re-erect or make alteration in any place in a building or in it’s structure or demolish any building or carry out any development whether for building operation, layout of land or for change of use of any land or building shall obtain prior written permission from Authority by submitting an application in Form I as “Common Application Form” accompanied by scrutiny fee as prescribed by the Competent Authority& accompanied by the following documents (in hard and soft copy, as desired by the Competent Authority):
(i) Ownership documents-Mutation document alongwith lease deed / sale deed or possession letter in the name of owner issued by the revenue department or permission to use the land issued by Competent Authority;
(ii) a site plan as per the specifications mentioned in Annexure-1;
(iii) a building plan or plans including landscape plan & contour plan along with an un-editable Compact Disc / DVD or any other electronic medium permissible by the Competent Authority from time to time containing the drawings in “.DWG” format as per the specifications mentioned in Annexure-1,clause A-1:3;
(iv) Structural drawings as per the specifications mentioned in Annexure-1, clause A-1:3 (iii) & and chapter-8;
(v) Fire safety design as required under National Building Code or under Fire Services Act,as per the specifications mentioned in Clause -8.2 &8.3;
(vi) Heating, Ventilation, Air-Conditioning (H.V.A.C.) service plan wherever required, as per clause 7.17 &National Building Code Part VIII;
(vii) Public health services plan in un-editable compact Disc / DVD or any other electronic medium, containing drawings in “.DWG” Format; as per the specifications mentioned in Clause -7.17 to 7.20 ;and as per the specifications mentioned in Annexure-4;
(viii) Scrutiny fees (non–refundable) at the rate of ten rupees per sq. mt. of the covered area achieved shall be deposited in favor of Competent Authority through any prescribed payment mode.
(ix) The development fee, upgradation fee, external development charges, security deposits etc. (whichever is applicable and intimated to the owner by the Authority) shall be paid after issue of technical NOC by the Authority.
(x) The security deposits shall be paid for carrying out development of building in shape of cash or bank guarantee which is refundable without interest after issue of occupancy certificate to ensure adherence to conditions of permission for development and in case of violation of the conditions the security deposits will be forfeited partly or fully as per decision of the Authority.
(xi) Upgradation Fee shall be applicable in such areas where Master Plan is not implemented. In areas within limits of urban local body, no upgradation fee shall be charged. Outside above limits, in non-government projects such as higher technical / educational institutions and other non-public / semi-public projects having total area more than 2000 sq. mt. shall pay upgradation fee equivalent to half the land use change fee from agriculture use to the proposed use.
(xii) Note: The applicant shall submit all kind of plans in electronic format on the online portal of Competent Authority. The Competent Authority shall convey objections / observations or sanction / refusal through online portal or prescribed mode.
(2) Every person applying under Clause 2.1(1) shall appoint an Architect / Engineer for drawing up of building plans / structural drawings and for the supervision of erection or re-erection of the building as per the scope of work defined for the technical persons in Annexure-2. The technical personnel except CoA Registered Architect shall have to be registered / empanelled with the Authority. Their qualification and, competence shall be as per Annexure-2.
(3) During construction if appointed Architect / Engineer notices that violation (except compoundable) are going on he shall intimate the owner and advise him to stop further construction and remove the violation, and will also intimate to the concerned authority.
(4) In case the building application is returned, it may be re-submitted within 60 days from the date of such return without fresh scrutiny fees. Such re-submission, however may not be allowed more than two times in 60 days from the date of first return.