Karnataka Energy Conservation Building Code 2018 Compliance Forms
| Project Address | Date | ||||||
| The following information is necessary to check a building permit application for compliance with the Electrical and Renewable Energy Systems requirements in the Energy Conservation Building Code 2018. | |||||||
| Applicability | Code Section | Component | Information Required | Location on Plans | Building Department Notes | ||
| Yse | No | /AN | |||||
| Electrical and Renewable Energy Systems | |||||||
| MANDATORY PROVISIONS (Section 7.2) | |||||||
| 7.2.1 | Transformers | Provide schedule with transformer losses | |||||
| 7.2.1.1 | Maximum Allowable Power Transformer Losses | Provide losses at 50% load and 100% load, capacity and efficiency | |||||
| 7.2.1.2 | Measurement and Reporting of Transformer Losses | For less than 500 kVA transformer meters are calibrated of 0.5 class accuracy and digital meters | |||||
| For above 500 kVA additional Ct's and PT's are installed | |||||||
| 7.2.1.3 | Voltage drop | Indicate the Voltage drop for feeders shall not exceed 2% at design load. Voltage drop for branch circuit shall not exceed 3% at design load. | |||||
| 7.2.2 | Energy Efficient Motors | Indicate the motor class IE2/IE3/IE4. | |||||
| Indicate the motors capacity more than 0.375 kW have efficiency according to the latest version of IS 12615. | |||||||
| Motor nameplate indicates nominal full-load motor efficiencies and full-load power factor. | |||||||
| Indicate the motor horsepower ratings does not exceed 20% of the calculated maximum load being served. | |||||||
| 7.2.3 | Diesel Generator Sets | Indicate the star rating of the Diesel Generator Set | |||||
APPENDIX D: COMPLIANCE FORMS
APPENDIX D: COMPLIANCE FORMS
| 7.2.4 | Check-Metering and Monitoring | Indicate the services exceeding 1000 kVA have permanently installed electrical metring to record kVA, kWh and total power factor. And provision for display of current in each phase, voltage between each phase and between each phase and neutral and total harmonic distortion as a percentage of total current. | |||||
|---|---|---|---|---|---|---|---|
| Indicate the services not exceeding 1000 kVA but over 65 kVA shall have permanently installed electric metering to record kW, kWh and power factor or kVARh on hourly basis. | |||||||
| Indicate the services not exceeding 65 kVA shall have permanently installed electric metering to record kWh on hourly basis. | |||||||
| Indicate in case of tenant-based building, for recording metering should be provided at a location from where each tenant could attach the services. | |||||||
| 7.2.5 | Power factor correction | Indicate that the power factor correction has been maintained at the point of connection. | |||||
| 7.2.6 | Power Distribution System | Indicate the power cable has been sized so that the distribution losses do not exceed the values mentioned in the code. | |||||
| 7.2.7 | Uninterruptible Power Supply | Indicate the UPS meets or exceed the energy efficiency requirements listed in the table 7-4. | |||||
| 7.2.8 | Renewable Energy Systems | Indicate the buildings have provision for installation of renewable energy systems in the future on rooftop or the site. | |||||
| 7.2.8.1 | Renewable Energy Generating Zone (REGZ) | Indicate a dedicated REGZ equivalent to at least 25 % of roof area or area required for generation of energy equivalent to 1% of total peak demand or connected load of the building, whichever is less, shall be provided in all buildings. | |||||
| Indicate the REGZ shall is free of any obstructions within its boundaries and from shadows cast by objects adjacent to the zone | |||||||
| 7.2.8.2 | Main Electrical Service Panel | Indicate the minimum rating is displayed on the main electrical service panel. And space is reserved for the installation of double pole circuit breaker for future solar electric installation. | |||||
| 7.2.8.3 | Demarcation on Documents | Location for inverters and metering equipment, Pathway for routing of conduit from the REGZ to the point of interconnection with the electrical service, Routing of plumbing from the REGZ to the water-heating system and, Structural design loads for roof dead and live load. |
APPENDIX D: COMPLIANCE FORMS
APPENDIX E: BEE APPROVED LIST OF SOFTWARE TO SHOW COMPLIANCE
14 Appendix E: BEE approved list of software to show compliance
| Analysis | Software |
|---|---|
| Whole Building Performance Method | AECOsim Design Builder DOE2EnergyPlus eQUEST HAP IDA-ICE IES-VE OpenStudio SimergyTrace700TRNSYS Visual DOE BEP-EMIS |
| Daylighting | AGI32 (Licaso) Daysim Design Builder DIVA Groundhog IES-VE OpenStudio RadianceRhino-Grasshopper with Daylighting Plugins Sefaira Sensor Placement + Optimization Tool (SPOT) |
**This is not an all-inclusive list. The current list of approved software is available at BEE website (https://www.beeindia.gov.in/)

(,
Published by : meα u (auomεu uyomαa cuα_cu)
KARNATAKA RENEWABLE ENERGY DEVELOPMENT LTD. (A GOVERNMENT OF KARNATAKA UNDERTAKING)
o.3,o,αoα, α,oα-56 01.:080–22208109/22282225,:080–22257399,
E-mail: kredlnce@yahoo.co.in, Web : http://kredlinfo.in
H.e%.2.8.ω
KARNATAKA ENERGY CONSERVATION BUILDING CODE (K-ECBC) 2018