Compliance shall be demonstrated with the prescriptive requirements in this section. Supply, exhaust, and return or relief fans with motor power exceeding 0.37 kW shall meet or exceed the minimum energy efficiency requirements specified in Table 5-11 through Table 5-13 except the following need not comply with the requirement
(a) Fans in un-ducted air conditioning unit where fan efficiency has already been taken in account to calculate the efficiency standard of the comfort system.
(b) Fans in Health Care buildings having HEPA filters.
(c) Fans inbuilt in energy recovery systems that pre-conditions the outdoor air
Table 5-11Mechanical and Motor Efficiency Requirements for Fans in ECBC Buildings
System type
Fan Type
Mechanical Efficiency
Motor Efficiency (As per IS 12615)
Air-handling unit
Supply, return and exhaust
60%
IE 2
Table 5-12Mechanical and Motor Efficiency Requirements for Fans in ECBC+ Buildings
System type
Fan Type
Mechanical Efficiency
Motor Efficiency (As per IS 12615)
Air-handling unit
Supply, return and exhaust
65%
IE 3
Table 5-13Mechanical and Motor Efficiency Requirements for Fans in Super ECBC Buildings
System type
Fan Type
Mechanical Efficiency
Motor Efficiency (As per IS 12615)
Air-handling unit
Supply, return and exhaust
70%
IE 4
Chapter 5Comfort Systems and Controls
5.1 General
All heating, ventilation, air conditioning equipment and systems, and their controls shall comply with the mandatory provisions of §5.2 and the prescriptive criteria of §5.3 for the respective building energy efficiency level. In case alternative compliance path of Total System Efficiency or Low Energy Systems is used for compliance, respective requirements of §5.3.12 or §5.3.13 and relevant criteria of §5.3 shall be met.
5.3.1Chillers
(a) Chillers shall meet or exceed the minimum efficiency requirements for ECBC+ and SuperECBC Buildings are presented in Table 5-14 and Table 5-15 under ANSI/ AHRI 550/ 590 conditions.
(b) Chiller shall meet or exceed the minimum efficiency requirements as per the Standards and Labelling Program of BEE for ECBC+ and superECBC shall take precedence over the minimum efficiency requirements presented in Table 5-14 and Table 5-15.
i. minimum 3 star rated chillers is required for ECBC+ compliance, and
ii. 5 star rated chillers to meet superECBC compliance
COMFORT SYSTEMS AND CONTROLS
COMFORT SYSTEMS AND CONTROLS
Table 5-14Minimum Energy Efficiency Requirements for water cooled Chillers.
ECBC+ Building
SuperECBC Building
Chiller Capacity (kWr)
COP
IPLV
COP
IPLV
<260
5.2
6.9
5.8
7.1
≥260 & <530
5.8
7.1
6.0
7.9
≥530 & <1,050
5.8
7.5
6.3
8.4
≥1,050 & <1,580
6.2
8.1
6.5
8.8
≥1,580
6.5
8.9
6.7
9.1
Table 5-15Minimum Energy Efficiency Requirements for air cooled Chillers.
ECBC+ Building
SuperECBC Building
Chiller Capacity (kWr)
COP
IPLV
COP/ IPLV
<260
3.0
4.0
NA
≥260
3.2
5.0
NA
5.2Mandatory Requirements
5.2.1 Ventilation
(a) All habitable spaces shall be ventilated with outdoor air in accordance with the requirements of §5.2.1 and guidelines specified in the National Building Code 2016 (Part 8: Building Services, Section 1: Lighting and Natural Ventilation, Subsection 5: Ventilation).
(b) Ventilated spaces shall be provided with outdoor air using one of the following:
i. Natural ventilation
ii. Mechanical ventilation
5.2.1.1 Natural Ventilation Design Requirements
Naturally ventilated buildings shall:
(a) Comply with guidelines provided for natural ventilation in N BC.
(b) Have minimum BEE 3-star rated ceiling fans, if provided with ceiling fans.
(c) Have exhaust fans complying with minimum efficiency requirements of fans in §5.3, if provided.
5.2.1.2 Mechanical Ventilation Air Quantity Design Requirements
Buildings that are ventilated using a mechanical ventilation system that are ventilated with a mechanical system, either completely or in conjunction with natural ventilation systems, shall:
(a) Install mechanical ventilation systems that provide outdoor air change rate as per NBC.
(b) Have a ventilation system controlled by CO sensors for basement carpark spaces with total car park space greater than or equal to 600 m² .
COMFORT SYSTEMS AND CONTROLS
COMFORT SYSTEMS AND CONTROLS
5.2.1.3 Demand Control Ventilation
Mechanical ventilation systems shall have demand control ventilation if they provide outdoor air greater than 1,500 litres per second, to a space greater than 50m², with occupant density exceeding 40 people per 100m² of the space and are served by one or more of the following systems:
(a) An air side economizer
(b) Automatic outdoor modulating control of the outdoor air damper
Exceptions to § 5.2.1.3:
(a) Classrooms in Schools, call centers category under Business
(b) Spaces that have processes or operations that generate dust, fumes, mists, vapors, or gases and are provided with exhaust ventilation, such as indoor operation of internal combustion engines or areas designated for unvented food service preparation, or beauty salons
(c) Systems with exhaust air energy recovering system
5.2.2 Minimum Space Conditioning Equipment Efficiencies
5.2.2.1 Chillers
(a) Chillers shall meet or exceed the minimum efficiency requirements presented in Table 5-1 through Table 5-2 under ANSI/ AHRI 550/ 590 conditions. To show compliance to ECBC, minimum requirement of both COP and IPLV requirement shall be met.
(b) Minimum efficiency requirements under BEE Standards and Labelling Program for chillers shall take precedence over the minimum requirements presented in Table 5-1 and Table5-2.
i. Chiller shall meet or exceed the minimum efficiency requirements under BEE Standards and Labelling Program for chiller as and when updated by BEE
ii. For ECBC Compliance, minimum 1 star rated chiller shall be installed
(c) The application of air-cooled chiller is allowed in all buildings with cooling load less than 530 kW. For buildings with cooling load equal to or greater than 530 kW, the capacity of air-cooled chiller shall be restricted to 33% of the total installed chilled water capacity unless the authority having jurisdiction mandates the application of air-cooled chillers.
Table 5-1Minimum Energy Efficiency Requirements for water cooled Chillers
Chiller Capacity (kWr)
COP
IPLV
<260
4.7
5.8
≥260 & <530
4.9
5.9
≥530 & <1,050
5.4
6.5
≥1,050 & <1,580
5.8
6.8
≥1,580
6.3
7.0
Table 5-2Minimum Energy Efficiency Requirements for air cooled Chillers
Chiller Capacity (kWr)
COP
IPLV
<260
2.8
3.5
≥260
3.0
3.7
5.2.2.2 Unitary, Split, Packaged Air-Conditioners
Unitary air-conditioners shall meet or exceed the efficiency requirements given in Table 5-3. Window and split air conditioners shall be certified under BEE's star Labelling program. EER shall be as per IS 8148 for all unitary, split, packaged air conditioners greater than 10kWr.
5.2.3 Controls
To comply with the Code, buildings shall meet the requirements of § 5.2.3.1 through §5.2.3.5.
5.2.3.1 Time clock
Mechanical cooling and heating systems in Universities and Training Institutions of all sizes and all Shopping Complexes with built up area greater than 20,000 m² shall be controlled by time clocks that:
(a) Can start and stop the system under different schedules for at least three different day-types per week,
(b) Are capable of retaining programming and time setting during loss of power for a period of at least 10 hours, and
(c) Include an accessible manual override that allows temporary operation of the system for up to 2 hours.
Exceptions to §5.2.3.1:
(a) Cooling systems less than 17.5 kWr
(b) Heating systems less than 5.0 kWr
(c) Unitary systems of all capacities
5.2.3.2 Temperature Controls
Mechanical cooling and heating equipment in all buildings shall be installed with controls to manage the temperature inside the conditioned zones. Each floor or a building block shall be installed with at least one control to manage the temperature.
These controls should meet the following requirements:
(a) Where a unit provides both heating and cooling, controls shall be capable of providing a temperature dead band of 3.0° C within which the supply of heating and cooling energy to the zone is shut off or reduced to a minimum.
(b) Where separate heating and cooling equipment serve the same temperature zone, temperature controls shall be interlocked to prevent simultaneous heating and cooling.
(c) Separate thermostat control shall be installed in each
i. guest room of Resort and Star Hotel,
ii. room less than 30m² in Business,
iii. air-conditioned class room, lecture room, and computer room of Educational,
iv. in-patient and out-patient room of Healthcare
COMFORT SYSTEMS AND CONTROLS
COMFORT SYSTEMS AND CONTROLS
5.2.3.3 Occupancy Controls
Occupancy controls shall be installed to de-energize or to throttle to minimum the ventilation and/or air conditioning systems when there are no occupants in:
(a) Each guest room in a Resort and Star Hotel
(b) Each public toilet in a Star Hotel or Business with built up area more than 20,000 m²
(c) Each conference and meeting room in a Star Hotel or Business
(d) Each room of size more than 30m² in Educational buildings
5.2.3.4 Fan Controls
Cooling towers in buildings with built up area greater than 20,000 m² , shall have fan controls based on wet bulb logic, with either:
(a) Two speed motors, pony motors, or variable speed drives controlling the fans, or
5.2.4 Piping and Ductwork
5.2.4.1 Piping Insulation
Piping for heating, space conditioning, and service hot water systems shall meet the insulation requirements listed in Table 5-7 through Table 5-9. Insulation exposed to weather shall be protected by aluminium sheet metal, painted canvas or plastic cover. Cellular foam insulation shall be protected as above or be painted with water retardant paint.
Exceptions to § 5.2.4.1:
(a) Reduction in insulation R value by 0.2 (compared to values in Table 5-7, Table 5-8 and Table 5-9) to a minimum insulation level of R-0.4 shall be permitted for any pipe located in partition within a conditioned space or buried.
(b) Insulation R value shall be increased by 0.2 over and above the requirement stated in Table 5-7 through Table 5-9 for any pipe located in a partition outside a building with direct exposure to weather.
Table 5-7Insulation Requirements for Pipes in ECBC Building
Operating Temperature (°C)
Pipe size (mm)
< 40
≥40
Insulation R value (m2.K/W)
Heating System
>94°C and ≤121°C
0.9
1.2
>60°C and ≤94°C
0.7
0.7
>40°C and ≤60°C
0.4
0.7
Cooling System
>4.5°C and ≤15°C
0.4
0.7
< 4.5°C
0.9
1.2
Refrigerant Piping (Split Systems)
>4.5°C and ≤15°C
0.4
0.7
< 4.5°C
0.9
1.2
Table 5-8Insulation Requirements for Pipes in ECBC+ Building
Operating Temperature (°C)
Pipe size (mm)
< 40
≥ 40
Insulation R value (m2.K/W)
Heating System
>94°C and ≤121°C
1.1
1.3
>60°C and ≤94°C
0.8
0.8
>40°C and ≤60°C
0.5
5.2.5 System Balancing
5.2.5.1 General
System balancing shall be done for systems serving zones with a total conditioned area exceeding 500 m² .
5.2.5.2 Air System Balancing
Air systems shall be balanced in a manner to first minimize throttling losses; then, for fans with fan system power greater than 0.75 kW, fan speed shall be adjusted to meet design flow conditions.
5.2.5.3 Hydronic System Balancing
Hydronic systems shall be proportionately balanced in a manner to first minimize throttling losses, then the pump impeller shall be trimmed, or pump speed shall be adjusted to meet design flow conditions.
5.2.6 Condensers
5.2.6.1 Condenser Locations
Condensers shall be located such that the heat sink is free of interference from heat discharge by devices located in adjoining spaces, and do not interfere with other such systems installed nearby.
5.2.7 Service Water Heating
5.2.7.1 Solar Water Heating
Hospitality and Healthcare in all climatic zones and all buildings in cold climate zone with a hot water system, shall have solar water heating equipment installed to provide for:
a) at least 20% of the total hot water design capacity if above grade floor area of the building is less than 20,000 m²
b) at least 40% of the total hot water design capacity if above grade floor area of the building is greater than or equal to 20,000 m²
Exception to § 5.2.7.1: Systems that use heat recovery to provide the hot water capacity required as per the building type and size.
5.2.7.2 Heating Equipment Efficiency
Service water heating equipment shall meet or exceed the performance and minimum efficiency requirements presented in available Indian Standards
a) Solar water heater shall meet the performance/ minimum efficiency level mentioned in IS 13129 Part (1&2)
b) Gas Instantaneous water heaters shall meet the performance/minimum efficiency level mentioned in IS 15558 with above 80% Fuel utilization efficiency.
c) Electric water heater shall meet the performance/ minimum efficiency level mentioned in IS 2082.
COMFORT SYSTEMS AND CONTROLS
COMFORT SYSTEMS AND CONTROLS
d) For evacuated tube collector the storage tanks shall meet the IS 16542:2016, tubes shall meet IS 16543:2016 and IS 16544:2016 for the complete system.
5.2.7.3 Other Water Heating System
Supplementary heating system shall be designed to maximize the energy efficiency of the system and shall incorporate the following design features in cascade:
a) Maximum heat recovery from hot discharge system like condensers of air conditioning units,
b) Use of gas fired heaters wherever gas is available, and
c) Electric heater as last resort.
5.2.7.4 Piping Insulation
Piping insulation shall comply with § 5.2.4.1. The entire hot water system including the storage tanks, pipelines shall be insulated conforming to the relevant IS standards on materials and applications.
5.2.7.5 Heat Traps
Vertical pipe risers serving storage water heaters and storage tanks not having integral heat traps and serving a non-recirculating system shall have heat traps on both the inlet and outlet piping.
5.2.7.6 Swimming Pools
All heated pools shall be provided with a vapor retardant pool cover on or at the water surface. Pools heated to more than 32° C shall have a pool cover with a minimum insulation value of R-4.1.
5.3.2Pumps
Chilled and condenser water pumps shall meet or exceed the minimum energy efficiency requirements specified in Table 5-16 through Table 5-18. Requirements for pumps in district chiller systems and hot water pumps for space heating are limited to the installed efficiency requirement of individual pump equipment only. To show compliance, calculate the total installed pump capacity in kilo watt and achieve the prescribed limits per kilo watt of refrigeration installed in the building.
Exceptions to § 5.3.2: Pumps used in processes e.g. service hot water, chilled water used for refrigeration etc.
Table 5-16Pump Efficiency Requirements for ECBC Building
Equipment
ECBC
Chilled Water Pump (Primary and Secondary)
18.2 W/kWr with VFD on secondary pump
Condenser Water Pump
17.7 W/kWr
Pump Efficiency (minimum)
70%
Table 5-17Pump Efficiency Requirements for ECBC+ Building
Equipment
ECBC+ Building
Chilled Water Pump (Primary and Secondary)
16.9 W/kWr with VFD on secondary pump
Condenser Water Pump
16.5 W/kWr
Pump Efficiency (minimum)
75%
Table 5-18Pump Efficiency Requirements for Super ECBC Building
Equipment
Super ECBC Building
Chilled Water Pump (Primary and Secondary)
14.9 W/kWr with VFD on secondary pump
Condenser Water Pump
14.6 W/kWr
Pump Efficiency (minimum)
85%
5.3.3 Cooling Towers
Cooling towers shall meet or exceed the minimum efficiency requirements specified in Table 5-19. ECBC+ and Super ECBC Buildings shall have additional VFD installed in the cooling towers.
Table 5-19Cooling Tower Efficiency Requirements for ECBC, ECBC+, and Super ECBC Buildings
Equipment type
Rating Condition
Efficiency
Open circuit cooling tower Fans
35°C entering water29°C leaving water24°C WB outdoor air
0.017 kW/kWr0.31 kW/L/s
5.3.4 Boilers
Gas and oil-fired boilers shall meet or exceed the minimum efficiency requirements specified in Table 5-20.
COMFORT SYSTEMS AND CONTROLS
COMFORT SYSTEMS AND CONTROLS
Table 5-20Minimum Efficiency Requirements Oil and Gas fired Boilers for ECBC+ and SuperECBC buildings
Equipment Type
Sub category
Size category
Minimum FUE
Boilers, Hot Water
Gas or oil fired
All capacity
85%
FUE – Fuel utilization efficiency
5.3.6Variable Flow Hydronic Systems
5.3.6.1 Variable Fluid Flow
HVAC pumping systems having a total pump system power exceeding 7.5 kW shall be designed for variable fluid flow and shall be capable of reducing pump flow rates to an extent which is lesser or equal to the limit, where the limit is set by the larger of:
a) 50% of the design flow rate, or
b) The minimum flow required by the equipment manufacturer for proper operation of the chillers or boilers.
5.3.6.2 Isolation Valves
Water cooled air-conditioning or heat pump units with a circulation pump motor greater than or equal to 3.7 kW shall have two-way automatic isolation valves on each water-cooled air-conditioning or heat pump unit that are interlocked with the compressor to shut off condenser water flow when the compressor is not operating.
5.3.6.3 Variable Speed Drives
Chilled water or condenser water systems that must comply with either § 5.3.6.1 or § 5.3.6.2 and that have pump motors greater than or equal to 3.7 kW shall be controlled by variable speed drives.
5.3.5Economizers
5.3.5.1 Economizer for ECBC, ECBC+ and Super ECBC Building
Each cooling fan system in buildings with built up area greater than 20,000 m² , shall include at least one of the following:
a) An air economizer capable of modulating outside-air and return-air dampers to supply 50% of the design supply air quantity as outside-air.
b) A water economizer capable of providing 50% of the expected system cooling load at outside air temperatures of 10° C dry-bulb/ 7.2° C wet-bulb and below.
Exception to §5.3.5.1:
a) Projects in warm-humid climate zones
b) Projects with only daytime occupancy in the hot-dry
c) Individual cooling or heating fan systems less than 3,200 litres per second
5.3.5.2 Partial Cooling
Where required by §5.3.5.1 economizers shall be capable of providing partial cooling even when additional mechanical cooling is required to meet the cooling load.
5.3.5.3 Economizer Controls
Air economizer shall be equipped with controls
a) That allows dampers to be sequenced with the mechanical cooling equipment and not be controlled by only mixed air temperature.
b) Capable of automatically reducing outdoor air intake to the design minimum outdoor air quantity when outdoor air intake will no longer reduce cooling energy usage.
c) Capable of high-limit shutoff at 24 °C dry bulb temperature.
5.3.5.4 Testing
Air-side economizers shall be tested in the field following the requirements in § 12 Appendix C to ensure proper operation.
Exception to §5.3.5.4: Air economizers installed by the HVAC system equipment manufacturer and certified to the building department as being factory calibrated and tested per the procedures in §12.
5.3.7Unitary, Split, Packaged Air-Conditioners
Unitary air-conditioners shall meet or exceed the efficiency requirements given in Table 5 -21 and Table 5-22. Window and split air conditioners shall be certified under BEE's Star Labelling Program. EER shall be as per IS 8148 for all unitary, split, packaged air conditioners greater than 10 kWr.
Table 5-21Minimum Requirements for Unitary, Split, Packaged Air Conditioners in ECBC+ Building
Cooling Capacity (kWr)
Water Cooled
Air Cooled
≤10.5
NA
BEE 4 Star
>10.5
3.7 EER
3.2 EER
COMFORT SYSTEMS AND CONTROLS
COMFORT SYSTEMS AND CONTROLS
Table 5-22Minimum Requirements for Unitary, Split, Packaged Air Conditioners in SuperECBC building
Cooling Capacity (kWr)
Water Cooled
Air Cooled
≤10.5
NA
BEE 5 Star
>10.5
3.9 EER
3.4 EER
Table 5-3
Minimum Requirements for Unitary, Split, Packaged Air Conditioners in ECBC Building
Cooling Capacity (kWr)
Water Cooled
Air Cooled
≤ 10.5
NA
BEE 3 Star
> 10.5
3.3 EER
2.8 EER
5.2.2.3 Variable Refrigerant Flow
Variable Refrigerant Flow (VRF) systems shall meet or exceed the efficiency requirements specified in Table 5-4 as per the ANSI/AHRI Standard 1230 while the Indian Standard on VRF is being developed. BEE Standards and Labelling requirements for VRF shall take precedence over the current minimum requirement.
COMFORT SYSTEMS AND CONTROLS
COMFORT SYSTEMS AND CONTROLS
Table 5-4Minimum Efficiency Requirements for VRF Air conditioners for ECBC Building
For Heating or cooling or both
Type
Size category (kWr)
EER (W/W)
IEER (W/W)
VRF Air Conditioners, Air cooled
< 40
3.28
4.36
>= 40 and < 70
3.26
4.34
>= 70
3.02
4.07
* The revised EER and IEER values as per Indian Standard for VRF corresponding to values in this table will supersede as and when the revised standards are published.
5.2.2.4 Air Conditioning and Condensing Units Serving Computer Rooms
Air conditioning and condensing units serving computer rooms shall meet or exceed the energy efficiency requirements listed in Table 5-5.
Table 5-5Minimum Efficiency Requirements for Computer Room Air Conditioners
Equipment type
Net Sensible Cooling Capacitya
Minimum SCOP-127b
Down flow
Up flow
All types of computer room ACs Air/ Water/Glycol
All capacity
2.5
2.5
a. Net Sensible cooling capacity = Total gross cooling capacity - latent cooling capacity – Fan power.b. Sensible Coefficient of Performance (SCOP-127): A ratio calculated by dividing the net sensible cooling capacity in watts by the total power input in watts (excluding reheater and dehumidifier) at conditions defined in ASHRAE Standard 127-2012 Method of Testing for Rating Computer and Data Processing Room Unitary Air Conditioners).
5.2.2.5 Boilers
Gas and oil fired boilers shall meet or exceed the minimum efficiency requirements specified in Table 5-6.
Table 5-6Minimum Efficiency Requirements for Oil and Gas fired Boilers for ECBC building
Equipment Type
Sub category
Size category
Minimum FUE
Boilers, Hot Water
Gas or oil fired
All capacity
80%
FUE – Fuel utilization efficiency
(b) Controls capable of reducing the fan speed to at least two third of installed fan power.
5.2.3.5 Dampers
All air supply and exhaust equipment, having a Variable Frequency Drive (VFD), shall have dampers that automatically close upon:
(a) Fan shutdown, or
(b) When spaces served are not in use
(c) Back draft gravity damper is acceptable in the system with design outdoor air of the system is less than 150 litres per second in all climatic zones except cold climate, provided backdraft dampers for ventilation air intakes are protected from direct exposure to wind.
(d) Dampers are not required in ventilation or exhaust systems serving naturally conditioned spaces.
(e) Dampers are not required in exhaust systems serving kitchen exhaust hoods.
0.9
Cooling System
>4.5°C and ≤15°C
0.5
0.9
< 4.5°C
1.1
1.3
Refrigerant Piping (Split Systems)
>4.5°C and ≤ 15°C
0.5
0.9
< 4.5°C
1.1
1.3
COMFORT SYSTEMS AND CONTROLS
COMFORT SYSTEMS AND CONTROLS
Table 5-9Insulation Requirements for Pipes in Super ECBC Buildings
Operating Temperature (°C)
Pipe size (mm)
< 40
≥ 40
Insulation R value (m2.K/W)
Heating System
>94°C and ≤121°C
1.5
1.5
>60°C and ≤ 94°C
1.0
1.3
>40°C and ≤ 60°C
0.7
1.1
Cooling System
>4.5°C and ≤ 15°C
0.7
1.2
< 4.5°C
1.5
1.5
Refrigerant Piping (Split Systems)
>4.5°C and ≤15°C
0.4
0.7
< 4.5°C
1.5
1.5
5.2.4.2 Ductwork and Plenum Insulation
Ductwork and plenum shall be insulated in accordance with Table 5-10.
Table 5-10Ductwork Insulation (R value in m². K/W) Requirements
Duct Location
Supply ducts
Return ducts
Exterior
R -1.4
R -0.6
Unconditioned Space
R -0.6
None
Buried
R -0.6
None
5.3.11Service Water Heating
For compliance with ECBC+ and SuperECBC,
(a) Hospitality and Healthcare in all climatic zones shall have solar water heating equipment installed to provide at least 40% of the total hot water design capacity.
(b) All buildings in cold climate zone with a hot water system, shall have solar water heating equipment installed to provide at least 60% respectively of the total hot water design capacity.
Exception to § 5.3.11 Systems that use heat recovery to provide the hot water capacity required as per the building type, size and efficiency level.
COMFORT SYSTEMS AND CONTROLS
COMFORT SYSTEMS AND CONTROLS
5.3.8Controls for ECBC+ and SuperECBC Buildings
ECBC+ building shall comply with requirements of § 5.3.8 in addition to complying with requirements of §5.2.3.
5.3.8.1 Centralized Demand Shed Controls
ECBC+ and SuperECBC Buildings with built up area greater than 20,000 m² shall have a building management system. All mechanical cooling and heating systems in ECBC+ and SuperECBC Buildings with any programmable logic controller (PLC) to the zone level shall have the following control capabilities to manage centralized demand shed in noncritical zones:
(a) Automatic demand shed controls that can implement a centralized demand shed in non-critical zones during the demand response period on a demand response signal.
(b) Controls that can remotely decrease or increase the operating temperature set points by four degrees or more in all noncritical zones on signal from a centralized control point
(c) Controls that can provide an adjustable rate of change for the temperature setup and reset
The centralized demand shed controls shall have additional capabilities to
(i) Be disabled by facility operators
(ii) Be manually controlled from a central point by facility operators to manage heating and cooling set points
5.3.8.2 Supply Air Temperature Reset
Multi zone mechanical cooling and heating systems in ECBC+ and SuperECBC Buildings shall have controls that automatically reset the supply-air temperature in response to building loads or to outdoor air temperature. Controls shall reset the supply air temperature to at least 25% of the difference between the design supply air temperature and the design room air temperature.
Exception to § 5.3.8.2: ECBC+ and SuperECBC Buildings in warm humid climate zone.
5.3.8.3 Chilled Water Temperature Reset
Chilled water systems with a design capacity exceeding 350kWr supplying chilled water to comfort conditioning systems in ECBC+ and SuperECBC Buildings shall have controls that automatically reset supply water temperatures by representative building loads (including return water temperature) or by outdoor air temperature.
Exceptions to §5.3.8.3 Controls to automatically reset chilled water temperature shall not be required where the supply temperature reset controls causes improper operation of equipment.
5.3.9 Controls for SuperECBC Buildings
SuperECBC Buildings shall comply with requirements of § 5.3.9 in addition to complying with requirements of §5.2.3 and §5.3.8.
5.3.9.1 Variable Air Volume Fan Control
Fans in Variable Air Volume (VAV) systems in SuperECBC Buildings shall have controls or devices that will result in fan motor demand of no more than 30% of their design wattage at 50% of design airflow based on manufacturer's certified fan data;
5.3.10 Energy Recovery
All Hospitality and Healthcare, with systems of capacity greater than 2,100 litres per second and minimum outdoor air supply of 70% shall have air-to-air heat recovery equipment with minimum 50% recovery effectiveness.
At least 50% of heat shall be recovered from diesel and gas fired generator sets installed in Hospitality, Healthcare, and Business buildings with built up area greater than 20,000 m ² .
5.3.12Total System Efficiency – Alternate Compliance Approach
Buildings may show compliance by optimizing the total system efficiency for the plant side comfort system instead of the individual equipment mentioned under the prescriptive requirement. This alternate compliance approach is applicable for central chilled water plant side system in all building types. The total installed capacity per kilo-watt refrigeration load shall be less than or equal to maximum threshold requirements as specified in Table 5-23.
Equipment that can be included in central chilled water plant side system for this alternate approach are chillers, chilled water pumps, condenser water pumps, and cooling tower fan. Compliance check will be based on annual hourly simulation refer Table 9-1 for developing the proposed design.
Table 5-23Maximum System Efficiency Threshold for ECBC, ECBC+ and SuperECBC Buildings
Water Cooled Chilled Water Plant
Maximum Threshold (kW/kWr)
ECBC
0.26
ECBC+
0.23
Super ECBC
0.20
5.3.12.1 Documentation Requirement
Compliance shall be documented, and compliance forms shall be submitted to the authority having jurisdiction. The information submitted shall include, at a minimum, the following:
(a) Summary describing the results of the analysis, including the annual energy use (kWh) of chilled water plant (chillers, pumps and cooling tower) and annual chilled water use (kW·h) for the Proposed Design, and software used.
(b) Brief description of the project with location, number of stories, space types, conditioned and unconditioned areas, hours of operation.
(c) List of the energy-related building features of the Proposed Design.
(d) List showing compliance with the mandatory requirements of this code.
(e) The input and output report(s) from the simulation program including an energy and chilled water usage components: space cooling and heat rejection equipment, and other HVAC equipment (such as pumps). The output reports shall also show the number of hours any loads are not met by the HVAC system the Proposed Design.
(f) Explanation of any significant modelling assumptions made.
(g) Explanation of any error messages noted in the simulation program output.
The total system efficiency shall be calculated as follows:
Total System Efficiency=Chilled water use (kWrh)Chilled water plant use (kWh)