At Building mains, installed meters must be capable of monitoring energy use (kWh), Energy Demand (kW) and total Power Factor on an hourly basis. For sub -meters installed at building services, the following metering requirements must be complied with:
(a) Services exceeding 1,000 kVA shall have permanently installed electrical metering to record demand (kVA), energy (kWh), and total power factor on hourly basis. The metering shall also display current (in each phase and the neutral), voltage (between phases and between each phase and neutral), and total harmonic distortion (THD) as a percentage of total current.
(b) Services not exceeding 1,000 kVA but over 65 kVA shall have permanently installed electric metering to record demand (kW), energy (kWh), and total power factor (or kVARh) on hourly basis.
(c) Services not exceeding 65 kVA shall have p ermanently installed electrical metering to record energy (kWh) on hourly basis.
Sub Metering requirement for different services are outlined in Table 7 -3
| Building Contract Demand | ||
| 120 kVA to 250 kVA | Greater than 250 kVA | |
| HVAC system and components | Required | Required |
| Interior and Exterior Lighting | Not required | Required |
| Domestic hotwater | Notrequired | Required |
| Plugloads | Notrequired | Required |
| Renewable power source | Required | Required |
In addition to requirements stated above, for building types identified in Table 7 -4, respective services must be sub-metered.
| Mandatory requirement of sub- metering of services for specific building types | |
| Shopping Complex | Façade lighting |
| Shopping Complex | Elevator, escalators, moving walks |
| Business | Data centers |
| Hospitality | Commercial kitchens |
For tenant-based building, tenants must be provided with tap-off points to install electrical sub-meters.
7.2.5 Power Factor Correction
All 3 phase shall maintain their power factor at the point of connection as follows:
(a) 0.97 for ECBC Building
(b) 0.98 for ECBC+ Building
(c) 0.99 for Super ECBC Building
7.2.6 Power Distribution Systems
The power cabling shall be sized so that the distribution losses do not exceed
(a) 3% of the total power usage in ECBC Buildings
(b) 2% of the total power usage in ECBC+ Buildings
(c) 1% of total power usage in Super ECBC Buildings
Record of design calculation for the losses shall be maintained. Load calculation shall be calculated up to the panel level.