5.2.1 Ventilation
(a) All habitable spaces shall be ventilated with outdoor air in accordance with the requirements of §5.2.1 and guidelines specified in the National Building Code 2016 (Part 8: Building Services, Section 1: Lighting and Natural Ventilation, Subsection 5: Ventilation).
(b) Ventilated spaces shall be provided with outdoor air using one of the following: i. Natural ventilation
ii. Mechanical ventilation
5.2.1.1 Natural Ventilation Design Requirements
Naturally ventilated buildings shall:
(a) Comply with guidelines provided for natural ventilation in N BC.
(b) Have minimum BEE 3-star rated ceiling fans, if provided with ceiling fans.
(c) Have exhaust fans complying with minimum efficiency requirements of fans in §5.3, if provided.
5.2.1.2 Mechanical Ventilation Air Quantity Design Requirements
Buildings that are ventilated using a mechanical ventilation system that are ventilated with a mechanical system, either completely or in conjunction with natural ventilation systems, shall:
(a) Install mechanical ventilation systems that provide outdoor air change rate as per NBC.
(b) Have a ventilation system controlled by CO sensors for basement carpark spaces with total car park space greater than or equal to 600 m² .
COMFORT SYSTEMS AND CONTROLS
COMFORT SYSTEMS AND CONTROLS
5.2.1.3 Demand Control Ventilation
Mechanical ventilation systems shall have demand control ventilation if they provide outdoor air greater than 1,500 litres per second, to a space greater than 50m², with occupant density exceeding 40 people per 100m² of the space and are served by one or more of the following systems:
(a) An air side economizer
(b) Automatic outdoor modulating control of the outdoor air damper
Exceptions to § 5.2.1.3:
(a) Classrooms in Schools, call centers category under Business
(b) Spaces that have processes or operations that generate dust, fumes, mists, vapors, or gases and are provided with exhaust ventilation, such as indoor operation of internal combustion engines or areas designated for unvented food service preparation, or beauty salons
(c) Systems with exhaust air energy recovering system
5.2.2 Minimum Space Conditioning Equipment Efficiencies
5.2.2.1 Chillers
(a) Chillers shall meet or exceed the minimum efficiency requirements presented in Table 5-1 through Table 5-2 under ANSI/ AHRI 550/ 590 conditions. To show compliance to ECBC, minimum requirement of both COP and IPLV requirement shall be met.
(b) Minimum efficiency requirements under BEE Standards and Labelling Program for chillers shall take precedence over the minimum requirements presented in Table 5-1 and Table5-2.
i. Chiller shall meet or exceed the minimum efficiency requirements under BEE Standards and Labelling Program for chiller as and when updated by BEE
ii. For ECBC Compliance, minimum 1 star rated chiller shall be installed
(c) The application of air-cooled chiller is allowed in all buildings with cooling load less than 530 kW. For buildings with cooling load equal to or greater than 530 kW, the capacity of air-cooled chiller shall be restricted to 33% of the total installed chilled water capacity unless the authority having jurisdiction mandates the application of air-cooled chillers.
| Chiller Capacity (kWr) | COP | IPLV |
|---|---|---|
| <260 | 4.7 | 5.8 |
| ≥260 & <530 | 4.9 | 5.9 |
| ≥530 & <1,050 | 5.4 | 6.5 |
| ≥1,050 & <1,580 | 5.8 | 6.8 |
| ≥1,580 | 6.3 | 7.0 |
| Chiller Capacity (kWr) | COP | IPLV |
|---|---|---|
| <260 | 2.8 | 3.5 |
| ≥260 | 3.0 | 3.7 |
5.2.2.2 Unitary, Split, Packaged Air-Conditioners
Unitary air-conditioners shall meet or exceed the efficiency requirements given in Table 5-3. Window and split air conditioners shall be certified under BEE's star Labelling program. EER shall be as per IS 8148 for all unitary, split, packaged air conditioners greater than 10kWr.
5.2.3 Controls
To comply with the Code, buildings shall meet the requirements of § 5.2.3.1 through §5.2.3.5.
5.2.3.1 Time clock
Mechanical cooling and heating systems in Universities and Training Institutions of all sizes and all Shopping Complexes with built up area greater than 20,000 m² shall be controlled by time clocks that:
(a) Can start and stop the system under different schedules for at least three different day-types per week,
(b) Are capable of retaining programming and time setting during loss of power for a period of at least 10 hours, and
(c) Include an accessible manual override that allows temporary operation of the system for up to 2 hours.
Exceptions to §5.2.3.1:
(a) Cooling systems less than 17.5 kWr
(b) Heating systems less than 5.0 kWr
(c) Unitary systems of all capacities
5.2.3.2 Temperature Controls
Mechanical cooling and heating equipment in all buildings shall be installed with controls to manage the temperature inside the conditioned zones. Each floor or a building block shall be installed with at least one control to manage the temperature.
These controls should meet the following requirements:
(a) Where a unit provides both heating and cooling, controls shall be capable of providing a temperature dead band of 3.0° C within which the supply of heating and cooling energy to the zone is shut off or reduced to a minimum.
(b) Where separate heating and cooling equipment serve the same temperature zone, temperature controls shall be interlocked to prevent simultaneous heating and cooling.
(c) Separate thermostat control shall be installed in each
i. guest room of Resort and Star Hotel,
ii. room less than 30m² in Business,
iii. air-conditioned class room, lecture room, and computer room of Educational,
iv. in-patient and out-patient room of Healthcare
COMFORT SYSTEMS AND CONTROLS
COMFORT SYSTEMS AND CONTROLS
5.2.3.3 Occupancy Controls
Occupancy controls shall be installed to de-energize or to throttle to minimum the ventilation and/or air conditioning systems when there are no occupants in:
(a) Each guest room in a Resort and Star Hotel
(b) Each public toilet in a Star Hotel or Business with built up area more than 20,000 m²
(c) Each conference and meeting room in a Star Hotel or Business
(d) Each room of size more than 30m² in Educational buildings
5.2.3.4 Fan Controls
Cooling towers in buildings with built up area greater than 20,000 m² , shall have fan controls based on wet bulb logic, with either:
(a) Two speed motors, pony motors, or variable speed drives controlling the fans, or
5.2.4 Piping and Ductwork
5.2.4.1 Piping Insulation
Piping for heating, space conditioning, and service hot water systems shall meet the insulation requirements listed in Table 5-7 through Table 5-9. Insulation exposed to weather shall be protected by aluminium sheet metal, painted canvas or plastic cover. Cellular foam insulation shall be protected as above or be painted with water retardant paint.
Exceptions to § 5.2.4.1:
(a) Reduction in insulation R value by 0.2 (compared to values in Table 5-7, Table 5-8 and Table 5-9) to a minimum insulation level of R-0.4 shall be permitted for any pipe located in partition within a conditioned space or buried.
(b) Insulation R value shall be increased by 0.2 over and above the requirement stated in Table 5-7 through Table 5-9 for any pipe located in a partition outside a building with direct exposure to weather.
| Operating Temperature (°C) | Pipe size (mm) | |
| < 40 | ≥40 | |
| Insulation R value (m2.K/W) | ||
| Heating System | ||
| >94°C and ≤121°C | 0.9 | 1.2 |
| >60°C and ≤94°C | 0.7 | 0.7 |
| >40°C and ≤60°C | 0.4 | 0.7 |
| Cooling System | ||
| >4.5°C and ≤15°C | 0.4 | 0.7 |
| < 4.5°C | 0.9 | 1.2 |
| Refrigerant Piping (Split Systems) | ||
| >4.5°C and ≤15°C | 0.4 | 0.7 |
| < 4.5°C | 0.9 | 1.2 |
| Operating Temperature (°C) | Pipe size (mm) | |
| < 40 | ≥ 40 | |
| Insulation R value (m2.K/W) | ||
| Heating System | ||
| >94°C and ≤121°C | 1.1 | 1.3 |
| >60°C and ≤94°C | 0.8 | 0.8 |
| >40°C and ≤60°C | 0.5 | |
5.2.5 System Balancing
5.2.5.1 General
System balancing shall be done for systems serving zones with a total conditioned area exceeding 500 m² .
5.2.5.2 Air System Balancing
Air systems shall be balanced in a manner to first minimize throttling losses; then, for fans with fan system power greater than 0.75 kW, fan speed shall be adjusted to meet design flow conditions.
5.2.5.3 Hydronic System Balancing
Hydronic systems shall be proportionately balanced in a manner to first minimize throttling losses, then the pump impeller shall be trimmed, or pump speed shall be adjusted to meet design flow conditions.
5.2.6 Condensers
5.2.6.1 Condenser Locations
Condensers shall be located such that the heat sink is free of interference from heat discharge by devices located in adjoining spaces, and do not interfere with other such systems installed nearby.
5.2.7 Service Water Heating
5.2.7.1 Solar Water Heating
Hospitality and Healthcare in all climatic zones and all buildings in cold climate zone with a hot water system, shall have solar water heating equipment installed to provide for:
a) at least 20% of the total hot water design capacity if above grade floor area of the building is less than 20,000 m²
b) at least 40% of the total hot water design capacity if above grade floor area of the building is greater than or equal to 20,000 m²
Exception to § 5.2.7.1: Systems that use heat recovery to provide the hot water capacity required as per the building type and size.
5.2.7.2 Heating Equipment Efficiency
Service water heating equipment shall meet or exceed the performance and minimum efficiency requirements presented in available Indian Standards
a) Solar water heater shall meet the performance/ minimum efficiency level mentioned in IS 13129 Part (1&2)
b) Gas Instantaneous water heaters shall meet the performance/minimum efficiency level mentioned in IS 15558 with above 80% Fuel utilization efficiency.
c) Electric water heater shall meet the performance/ minimum efficiency level mentioned in IS 2082.
COMFORT SYSTEMS AND CONTROLS
COMFORT SYSTEMS AND CONTROLS
d) For evacuated tube collector the storage tanks shall meet the IS 16542:2016, tubes shall meet IS 16543:2016 and IS 16544:2016 for the complete system.
5.2.7.3 Other Water Heating System
Supplementary heating system shall be designed to maximize the energy efficiency of the system and shall incorporate the following design features in cascade:
a) Maximum heat recovery from hot discharge system like condensers of air conditioning units,
b) Use of gas fired heaters wherever gas is available, and
c) Electric heater as last resort.
5.2.7.4 Piping Insulation
Piping insulation shall comply with § 5.2.4.1. The entire hot water system including the storage tanks, pipelines shall be insulated conforming to the relevant IS standards on materials and applications.
5.2.7.5 Heat Traps
Vertical pipe risers serving storage water heaters and storage tanks not having integral heat traps and serving a non-recirculating system shall have heat traps on both the inlet and outlet piping.
5.2.7.6 Swimming Pools
All heated pools shall be provided with a vapor retardant pool cover on or at the water surface. Pools heated to more than 32° C shall have a pool cover with a minimum insulation value of R-4.1.