The building envelope shall comply with the mandatory provisions of §4.2, and the prescriptive criteria of §4.3. In case alternative compliance path of Building Envelope Trade - off Method is used for compliance, requirements of §4.3.5 and relevant criteria of §4.3 shall be met.
Mandatory Requirements
4.2.1 Fenestration
U-Factor
U-factors shall be determined for the overall fenestration product (including the sash and frame) in accordance with ISO-15099 by an accredited independent laboratory and labelled or certified by the manufacturer. U -factors for sloped glazing and skylights shall be determined at a slope of 20 degrees above the horizontal. For unrated products, use the default table in Appendix A.
Solar Heat Gain Coefficient
SHGC shall be determined for the overall single or multi glazed fenestration product (including the sash and frame) in accordance with ISO-15099 by an accredited independent laboratory and labelled or certified by the manufacturer.
Exceptions to §4.2.1.2:
(a) Shading coefficient (SC) of the centre of glass alone multiplied by 0.86 is an acceptable alternate for compliance with the SHGC requirements for the overall fenestration area.
(b) Solar heat gain coefficient (SHGC) of the glass alone is an acceptable alternate for compliance with the SHGC requirements for the overall fenestration product.
Visible Light Transmittance
Visible light transmittance (VLT) shall be determined for the fenestration product in accordance with ISO-15099 by an accredited independent laboratory and labelled or certified by the manufacturer. For unrated products, VLT of the glass alone shall be de -rate by 10% for demonstrating compliance with the VLT requirements for the overall fenestration product.
4.2.2Opaque Construction
4.2.2.1 U-Factor
U-factors shall be calculated for the opaque construction in accordance with ISO -6946. Testing shall be done in accordance with approved ISO Standard for respective insulation type by an accredited independent laboratory and labelled or certified by the manufacturer. For unrated products, use the default tables in Appendix A.
4.2.2.2 Solar Reflectance
Solar reflectance for the external opaque roof construction shall be determined in accordance with ASTM E903-96 by an accredited independent laboratory and labelled or certified by the manufacturer.
4.2.2.3 Emittance
Emittance for the external opaque roof construction shall be determined in accordance with ASTM E408-71 (RA 1996) by an accredited independent laboratory and labelled or certified by the manufacturer.
4.2.3Daylighting
Above grade floor areas shall meet or exceed the Useful Daylight Illuminance (UDI) area requirements listed in Table 4-1 for 90% of the potential daylit time in a year. For the purpose of daylighting compliance, the above grade floor area may exclude the wall thickness, columns and lift and building shafts. Mixed-use buildings shall show compliance as per the criteria prescribed in §2.5. Compliance shall be demonstrated either through daylighting simulation method in §4.2.3.1 or the manual method in §4.2.3.2. Assembly buildings and other buildings where daylighting will interfere with the functions or processes of 50% (or more) of the building floor area, are exempted from meeting the requirements listed in Table 4.1.
Exceptions to §4.2.3:
Assembly buildings and other buildings where daylighting will interfere with the functions or processes of 50% (or more) of the building floor area, are exempted from meeting the requirements listed in Table 4 -1.
BUILDING ENVELOPE
BUILDING ENVELOPE
Table 4-1Daylight Requirement
Building Category
Percentage of above grade floor area meeting the UDI requirement
ECBC
ECBC+
Super ECBC
Business, Educational
40%
50%
60%
No Star Hotel Star Hotel Healthcare
30%
40%
50%
Resort
45%
55%
65%
Shopping Complex
10%
15%
20%
Assembly
Exempted
Daylighting Simulation Method4.2.3.1
Only BEE approved software shall be used to demonstrate compliance through the daylighting simulation method. Buildings shall achieve illuminance level between 100 lux and 2,000 lux for the minimum percentage of floor area pre scribed in Table 4-1 for at least 90% of the potential daylit time. Illuminance levels for all spaces enclosed by permanent internal partitions (opaque, translucent, or transparent) with height greater or equal to 2 m from the finished floor, shall be measured as follows:
(a) Measurements shall be taken at a work plane height of 0.8m above the finished floor.
(b) The period of analysis shall be fixed for continuously 8 hours per day, anytime between 7:00 AM IST to 5:00 PM IST, resulting in 2,920 hours in total for all building types except for Schools. Schools shall be analysed for continuously 7 hours per day, anytime between 7:00 AM IST to 3:00 PM IST.
(c) Available useful daylight across a space shall be measured based on point -by- point grid values. UDI shall be calculated for at least one point for each square meter of floor area.
(d) Fenestration shall be modelled with actual visible light transmission (VLT) as per the details provided in the material specification sheet.
(e) All surrounding natural or man-made daylight obstructions shall be modelled if the distance between the façade of the building (for which compliance is shown) and
surrounding natural or man-made daylight obstructions is less than or equal to twice the height of the man-made or natural sunlight obstructers. If the reflectance of the surfaces is not known, default reflectance of 30% and 0% shall be used for all vertical surfaces of man-made and natural obstructers respectively.
(f) Interior surface reflectance shall be modelled based on the actual material specification. If material specification is not available, the default values in Table 4-2 shall be used.
(g) Documentation requirement to demonstrate compliance are:
i. Brief description of the project with location, number of stories, space types, hours of operation and software used.
ii. Summary describing the results of the analysis and output file from simulation tool outlining point wise compliance for the analysis grid and compliance in percentage.
iii. Explanation of any significant modelling assumptions made.
iv. Explanation of any error messages noted in the simulation program output.
V. Building floor plans, building elevations & sections, and site plan with surrounding building details (if modelled).
vi. Material reflectance, analysis grid size, total number of grid size/resolution, total number of grid points.
Table 4-2Default Values for Surface Reflectance
Surface Type
Reflectance
Wall or Vertical Internal Surfaces
50%
Ceiling
70%
Floor
20%
Furniture (permanent)
50%
4.2.3.2 Manual Daylighting Compliance Method
This method can be used for demonstrating compliance with daylighting requirements without simulation. Daylight extent factors (DEF) mentioned in Table 4-3 shall be used for manually calculating percentage of above grade floor area meeting the UDI requirement for 90% of the potential daylit time in a year.
BUILDING ENVELOPE
BUILDING ENVELOPE
Table 4-3Daylight Extent Factors (DEF) for Manually Calculating Daylight Area
Shading
Latitude
Window Type
VLT < 0.3
VLT ≥03
North
South
East
West
North
South
East
West
No shading or PF < 0.4
≥15°N
All window types
2.5
2.0
0.7
0.5
2.8
2.2
1.1
0.7
<15°N
2.4
2.0
0.8
0.6
2.7
2.2
1.5
0.8
Shading with PF ≥ 0.4
All Latitudes
All window types without light shelf*
2.8
2.3
1.5
1.1
3.0
2.5
1.8
1.5
Window with light shelf*
3.0
2.5
1.8
1.6
3.5
3.0
2.1
1.8
* To qualify as light shelf the internal projection shall meet the requirements specified under Exceptions to SHGC requirements in Table 4-10 and Table 4-11
(a) To calculate the daylit area:
In a direction perpendicular to the fenestration, multiply daylight extent factor (DEF) by the head height of the fenestration or till an opaque partition higher than head height of the fenestration, whichever isless.
ii. In the direction parallel to the fenestration, daylit area extends a horizontal dimension equal to the width of the fenestration plus either 1 meter on each side of the aperture, or the distance to an opaque partition of 2m high, or one-half the distance to an adjacent fenestration, whichever is least.
iii. For skylights, calculate the horizontal dimension in each direction equal to the top aperture dimension in that direction plus either the floor-to-ceiling height (H) for skylights, or 1.5 H for monitors, or H or 2H for the saw tooth configuration, or the distance to the nearest 1 meter or higher opaque partition, or one-half the distance to an adjacent skylight or vertical glazing, whichever is least.
iv. Glazed facades, with non-cardinal orientation, shall be categorized under a particular cardinal direction if its orientation is within ±45 degrees of that cardinal direction.
v. Daylit area overlap: For overlapping daylit areas such as windows on different orientations or in case of skylights the overlapping daylit area shall be subtracted from the sum of daylit area.
(b) Documentation requirement:
i. A separate architectural plan shall be prepared with all daylit areas marked on the floor plans.
ii. A summary shall be provided showing compliance as per Table 4 -1.