General3.1
To comply with the Code, buildings shall
(a) Have an Energy Performance Index Ratio (EPI Ratio) as defined in § 3.1.2 that is less than or equal to 1 and,
(b) Meet all mandatory requirements mentioned under §4.2, §5.2 , §6.2, and §7.2.
3.1.1 Energy Performance Index
The Energy Performance Index (EPI) of a building is its annual energy consumption in kilowatt-hours per square meter of the building. While calculating the EPI of a building, the area of unconditioned basements shall not be included. EPI can be determined by:
To comply with the Code, EP I value shall be rounded off to two decimal places in accordance with IS 2:1960 ‘Rules for rounding off numerical values.
3.1.2 Determining EPI Ratio
The EPI Ratio of a building is the ratio of the EPI of the Proposed Building to the EPI of the Standard Building:
Where,
Proposed Building is consistent with the actual design of the building and complies with all the mandatory requirements of ECBC.
Standard Building is a standardized building that has the same building floor area, gross wall area and gross roof area as the Proposed Building, complies with the mandatory requirements §4.2, §5.2 , §6.2, and §7.2, and minimally complies with prescriptive requirements of §4.3, §5.3, and §6.3 for ECBC Buildings.
The EPI ratio of the Proposed Building shall be established through any one of the following two methods described in §3.2
(a) Prescriptive Method (see §3.2.2)
(b) Whole Building Performance Method (see §3.2.3)
3.1.3 EPI Ratio for Core and Shell Buildings
EPI for core and shell buildings shall be calculated for the entire building based on the final design of the common areas and the relevant mandatory undertaking(s) in the ten ant lease agreement for the leased areas, as per §3.2.2.1 or §3.2.3.1.
3.1.4 EPI Ratio for Mixed-use Development
In a mixed-use building, each commercial part of a building must be classified separately, and EPI Ratio shall be calculated separately for each sub -classification, as per §3.2.2.1 or §3.2.3.1. The EPI Ratio of a mixed-use Proposed Building shall be calculated based on area- weighted average method. To calculate the reference maximum design EPI Ratio, listed in Table 9-5 through Table 9-9, applicable for the mixed-use building, each commercial part of mixed-use building shall be classified separately, and,
(a) If a part of the mixed-use building has different classification and is less than 10% of the total above grade area (AGA), the EPI ratio of the mixed-use Proposed Building shall be less than or equal to Maximum Allowed EPI ratio listed in Table 9-5 through Table 9-9, for the building sub-classification having highest percentage of above grade floor area.
(b) If a part of the mixed-use building has different classification and is more than 10% of the total above grade floor area, the EPI ratio of the mixed-use Proposed Building shall be less than or equal to Maximum Allowed EPI ratio for compliance calculated based on area weighted average method for all building sub-classifications listed in Table 9-5 through Table 9-9.
Exceptions to the above: Any portion of a mixed-use building classified in a category which does not fall under the scope of ECBC is exempted from demonstrating compliance.
Compliance Approaches3.2
Buildings that fall within the scope of the Code as mentioned in §2, shall comply with the Code by meeting all the mandatory requirements (see §3.2.1) and any of the compliance paths mentioned in §3.2.2, or §3.2.3.
3.2.1 Mandatory Requirements
Buildings shall comply with all mandatory requirements mentioned under §4.2, §5.2, §6.2, and §7.2, irrespective of the compliance path.
3.2.2 Prescriptive Method
A building complies with the Code using the Prescriptive Method if it meets the prescribed minimum (or maximum) values for envelope components (§ 4.3), comfort systems and controls (§5.3, §5.3.12, §5.3.13), and lighting and controls (§6.3), in addition to meeting all the mandatory requirements.
COMPLIANCE AND APPROACH
COMPLIANCE AND APPROACH
EPI Ratio through Prescriptive Method3.2.2.1
ECBC Buildings that demonstrate compliance through the Prescriptive Method (§3.2.2) shall be deemed to have an EPI equal to the Standard Building EPI, and therefore an EPI Ratio of 1. ECBC+ Buildings and SuperECBC Buildings that demonstrate compliance through the Prescriptive Method shall be deemed to have an EPI Ratio equal to the EPI Ratios listed in §9.5 under the applicable building type and climate zone.
Building Envelope Trade-off Method3.2.2.2
To comply with the Prescriptive Method of Section §4, the Building Envelope Trade -off Method may be used in place of the prescriptive criteria of §4.3.1, §4.3.2 and §4.3.3. A building complies with the Code using the Building Envelope Trade -off Method if the Envelope Performance Factor (EPF) of th e Proposed Building is less than or equal to the EPF of the Standard Building, calculated as per §4.3.5.
Total System Efficiency Method3.2.2.3
For projects using central chilled water plants, the Total System Efficiency approach may be used to comply with the Prescriptive Method of §5. This approach may be used in place of the prescriptive criteria of chillers (§5.3.1 and §5.3.6), chilled water pumps (§5.3.2), condenser water pumps (§5.3.2), and cooling tower fan (§ 5.3.3). Per this approach, a building complies if the Total System Efficiency Thresholds are met as per Table 5-23 Maximum System Efficiency Threshold for ECBC, ECBC+, and SuperECBC Buildings. Compliance with other prescriptive requirements (§5.3), as applicable, shall be met.
Low Energy Comfort Systems3.2.2.4
Low Energy Comfort Systems (§5.3.13) is a simplified approach that provides projects using Low Energy Comfort Systems an opportunity to achieve improved compliance levels of ECBC+ and SuperECBC. This approach is applicable to Prescriptive Method of Section §5. In addition to compliance with the applicable prescriptive requirements (§5.3), the projects must meet the sum of cooling and heating requirement using approved list of low energy systems as per requirements in §5.3.13.
3.2.3 Whole Building Performance Method
A building complies with the Code using the Whole Building Performance (WBP) Method when the estimated annual energy use of the Proposed Design is less than that of the Standard Design, even though it may not comply with the specific provisions of t he prescriptive requirements in §4 trough §7. The mandatory requirements of §4 through §7 (§4.2, §5.2, §6.2, and §7.2) shall be met when using the WBP Method.
EPI Ratio through Whole Building Performance Method3.2.3.1
The EPI of buildings that demonstrate compliance through Whole Building Performance Method (§3.2.3) shall be calculated using the compliance path defined in §3.1.1 and detailed in §9. The EPI Ratio of a building that uses the Whole Building Performance Method to show compliance, should be less than or equal to the EPI Ratio listed in §9.5 for the applicable building type and climate zone.
Compliance Requirements3.3
3.3.1 New Building Compliance
Full Building Compliance3.3.1.1
New buildings with completed fit-outs shall comply with either the provisions of §3.2.1 and either the provision of §3.2.2 or §3.2.3
Core and Shell building Compliance3.3.1.2
New core and shell building shall comply with the provisions of §3.2.1 and either the provision of §3.2.2 or §3.2.3 following base building systems in the common areas:
(a) Building envelope
(b) Thermal comfort systems and controls (only those installed by developer/owner)
(c) Lighting systems and controls (only those installed by developer/owner)
(d) Electrical systems (installed by developer/ owner)
(e) Renewable energy systems
Additionally, the tenant lease agreement shall have a legal undertaking clause to ensure interior fit-outs made by tenant shall be Code compliant. The legal undertaking shall mandate the relevant energy efficiency compliance requirements in accordance with the provisions of §3.2.1 and §3.2.2 for all interior fit-outs within the tenant leased area.
3.3.2 Additions and Alterations to Existing Buildings
If any existing building after additions or alterations changes its connected load to 100 kilo - Watt (kW) or above or a contract dema nd of 120 kilo-Volt Ampere (kVA) or above shall comply with the provisions of §4 through §7. Compliance may be demonstrated in either of the following ways:
(a) The addition shall comply with the applicable requirements, or
(b) The addition, together with the entire existing building, shall comply with the requirements of this Code that shall apply to the entire building, as if it were a new building.
COMPLIANCE AND APPROACH
COMPLIANCE AND APPROACH
Exceptions to §3.3.2: When space conditioning is provided by existing systems and equipment, the existing systems and equipment need not comply with this code. However, any new equipment installed must comply with specific requirements applicable to that equipment.
3.4 Approved Compliance Tools
A building following the whole building performance method of §9 or Total System Efficiency – Alternate compliance approach of §5.3.12 shall show compliance through online BEP- EMIS or whole building energy simulation software endorsed by BEE.
Compliance to the daylight requirements of §4.2.3, if calculated through software tools, shall be shown through online BEP-EMIS or daylighting software approved by BEE.
3.5 Administrative Requirements
Administrative requirements, including but not limited to, permit requ irements, enforcement, interpretations, claims of exemption, approved calculation methods, and rights of appeal are specified by the authority having jurisdiction.
3.6 Compliance Documents
3.6.1 General Information
Construction drawings and specifications shall show all pertinent data and features of the building, equipment, and systems in sufficient detail to permit the authority having jurisdiction to verify that the building complies with the requirements of this code. Details shall include, but are not limited to:
(a) Building Envelope: opaque construction materials and their thermal properties including thermal conductivity, specific heat, density along with thickness; fenestration U-factors, solar heat gain coefficients (SHGC), visible light transmittance (VLT) and building envelope sealing documentation; overhangs and side fins, building envelope sealing details;
(b) Heating, Ventilation, and Air Conditioning: system and equipment types, sizes, efficiencies, and controls; economizers; variable speed drives; piping insulation; duct sealing, insulation and location; solar water heating system; requirement for balance report;
(c) Lighting: lighting schedule showing type, number, and wattage of lamps and ballasts; automatic lighting shutoff, occupancy sensors, and other lighting controls; lamp efficacy for exterior lamps;
(d) Electrical Power: electric schedule showing transformer losses, motor efficiencies, and power factor correction devices; electric check metering and monitoring system.
(e) Renewable energy systems: system peak installed capacity, technical specifications, solar zone area.
3.6.2 Supplemental Information
The authority having jurisdiction may require supplemental information necessary to verify compliance with this code, such as calculations, worksheets, compliance forms, manufacturer's literature, or other data.
COMPLIANCE AND APPROACH
BUILDING ENVELOPE