9.1 The lift installation should receive regular cleaning, lubrication, adjustment and adequate servicing by authorized competent persons at such intervals as the type of equipment and frequency of service demand. In order that the lift installation is maintained at all times in a safe condition, a proper maintenance schedule shall be drawn up in consultation with the lift manufacturer and rigidly followed. The provision of a log book to record all items relating to general servicing and inspection is recommended for all lifts. It is essential that the electrical circuit diagram of the lift with the sequence of operation of different
components and parts should be kept readily available for the persons responsible for the maintenance and replacement where necessary.
9.2 Particular attention may be directed for thorough periodical examination of wire ropes when in service. Attention should also be directed to the thorough examination of the groove of drums, sheaves and pulleys when installing a new rope. A groove deepened by rope wear is liable to lead to early failure of a new rope unless the groove is returned.
9.3 Any accident arising out of operation of maintenance of the lifts should be duly reported to the Authority in accordance with the rules laid down. A notice may be put in the machine room to this effect.