6.5.1 Lift well enclosures, lift pits, machine rooms and machine supports besides conforming to the essential requirements given in 4, should form part of the building construction and comply with the lift manufacturer’s drawings.
6.5.2 Machine Room
Floors shall be designed to carry a load of not less than 350 kg/m2 over the whole area and also any load which may be imposed there on by the equipment used in the machine room or by any reaction from any such equipment both during periods of normal operation and repair.
6.5.3 The side wall of the lift well may be made of reinforced cement concrete at least 150 mm thick so as to provide satisfactory anchoring arrangement for fixing. Reference shall also be made to Part 6 ‘Structural Design, Section 5 Plain, Reinforced and Prestressed Concrete, 5A Plain and Reinforced Concrete’.
6.5.4 The total load on overhead beams shall be assumed as equal to all equipment resting on the beams plus twice the maximum load suspended from the beams.
6.5.5 The factor of safety for all overhead beams and
supports based on ultimate strength of the material and load in accordance with 6.5.4 shall be not less than the following:
For Steel 5
For Reinforced Concrete 7
The deflection of the overhead beams under the maximum static load calculated in accordance with above shall not exceed 1/1 500 of the span.