Part 8 Section 3Air Conditioning, Heating and Mechanical Ventilation
design that influence energy aspects; the need for analysis of operation of systems during various seasons of the year, and the need to incorporate energy recovery strategies have been incorporated in this clause.
q) ‘Automatic Controls’ given in the 1983 version has now been replaced by Building Management System, which addresses not only the control function, but also has a telling impact on operation and maintenance as well, most importantly on the opportunities afforded to implement various energy conservation strategies.
r) The text on packaged air conditioners and room air conditioners has been revised and elaborated.
s) The text on heating has been completely revised.
t) The text had been thoroughly revised and additional details have been included under Symbols, Units, Colour Code and Identification of Services; Pipe Work Services; Duct Work Services; Valve Labels and Charts; and Inspection, Commissioning and Testing.
u) List of various parameters to be checked for performance of air handling unit, hydronic system balancing, and finally, the hand-over procedure, have been given.
This revision aims to make a difference in the quality of environment and in building usage, in response to growing concerns and expectations in with regard to indoor air quality, energy conservation, environmental impact and building safety.
The provisions on natural ventilation are given in Part 8 ‘Building Services, Section 1 Lighting and Ventilation’.
The provisions of this Section are without prejudice to the various Acts, Rules and Regulations including the Factories Act, 1948 and the rules and regulations framed thereunder.
The information contained in this Section is based largely on the following Indian Standards:
IS No. Title
659 : 1964 Safety code for air conditioning (revised)
1391 Specification for room air conditioners:
(Part 1) : 1992 Unitary air conditioners (second revision)
(Part 2) : 1992 Split air conditioners (second revision)
2379 : 1990 Colour code for identification of pipelines (first revision)
3315 : 1994 Specification for evaporative air coolers (desert coolers) (second revision)
7896 : 2001 Data for outside design conditions for air conditioning for Indian cities (first revision)
8148 : 2003 Specification for packaged air conditioners (first revision)
Assistance has also been derived from the following publications in preparation of this Section:
BS 5720 : 1979 Code of practice for mechanical ventilation and air conditioning in building
Guidelines, Standards and Handbooks of American Society of Heating Refrigerating and Air Conditioning Engineers
Handbooks of Indian Society of Heating, Refrigerating and Air Conditioning Engineers
All standards, whether given herein above or cross-referred to in the main text of this Section, are subject to revision. The parties to agreement based on this Section are encouraged to investigate the possibility of applying the most recent editions of the standards.
1Scope
This Section covers the design, construction and installation of air conditioning and heating systems and equipment installed in buildings for the purpose of providing and maintaining conditions of air temperature, humidity, purity and distribution suitable for the use and occupancy of the space.
2Terminology
2.0 For the purpose of this Section the following definitions shall apply.
2.1 Air Conditioning — The process of treating air so as to control simultaneously its temperature, humidity, purity, distribution and air movement and pressure to meet the requirements of the conditioned space.
2.2 Atmospheric Pressure — The weight of air column on unit surface area of earth by atmospheric column. At sea level, the standard atmospheric or barometric pressure is 760 mm of mercury (1 033 mm of water column/101.325 kPa).
Generally atmospheric pressure is used as a datum for indicating the system pressures in air conditioning and accordingly, pressures are mentioned above the atmospheric pressure or below the atmospheric pressure considering the atmospheric pressure to be zero. A ‘U’ tube manometer will indicate zero pressure when pressure measured is equal to atmospheric pressure.
2.3 Buildings Related Illnesses (BRI) — The illness attributed directly to the specific air-borne building contaminants like the outbreak of the Legionnaire’s disease after a convention and sensitivity pneumonitis with prolonged exposure to the indoor environment of the building.
Some of the other symptoms relating to BRI are sensory irritation of eyes, ears and throat, skin irritation, headache, nausea, drowsiness, asthma like symptoms in non-asthmatic persons. The economic consequences of BRI is decreased productivity, absenteeism and the legal implications if occupants IAQ complaints are left unresolved.
2.4 Dewpoint Temperature — The temperature at which condensation of moisture begins when the air is cooled at same pressure.
2.5 Dry-Bulb Temperature — The temperature of the air, read on a thermometer, taken in such a way as to avoid errors due to radiation.
2.6 Duct System — A continuous passageway for the transmission of air which, in addition to the ducts, may include duct fittings, dampers, plenums, and grilles and diffusers.
2.7 Enthalpy — A thermal property indicating the quantity of heat in the air above an arbitrary datum, in kilo Joules per kg of dry air (or in Btu per pound of dry air).
2.8 Evaporative Air Cooling — The evaporative air cooling application is the simultaneous removal of sensible heat and the addition of moisture to the air. The water temperature remains essentially constant at the wet-bulb temperature of the air.
2.9 Fire Damper — A closure which consists of a normally held open damper installed in an air distribution system or in a wall or floor assembly and designed to close automatically in the event of a fire in order to maintain the integrity of the fire separation.
2.10 Fire Separation Wall — The wall providing complete separation of one building from another or part of a building from another part of the same building to prevent any communication of fire or heat transmission to wall itself which may cause or assist in the combustion of materials of the side opposite to that portion which may be on fire.
5
2.11 Global Warming Potential (GWP) — The potential of a refrigerant to contribute to global warming.
Global warming can make our planet and its climate less hospitable and more hostile to human life, thus necessitating reduction in emission of green house gases such as CO₂, SOx, NOx and refrigerants. Long atmospheric life time of refrigerants results in global warming unless the emissions are controlled.
GWP values of some of the refrigerants are given below:
Sl No.
Refrigerant
GWP Values
(1)
(2)
(3)
i)
R-12
10 600
ii)
R-22
1 900
iii)
R-134a
1 600
iv)
R-123
120
v)
R-407c
1 980
vi)
R-407a
2 340
vii)
R-410a
2 340
The values indicated above are for an integration period of 100 years.
2.12 Hydronic Systems — The water systems that convey heat to or from a conditioned space or process with hot or chilled water. The water flows through piping that connects a chiller or the water heater to suitable terminal heat transfer units located at the space or process.
2.13 Indoor Air Quality (IAQ) — Air quality that refers to the nature of conditioned air that circulates throughout the space/area where one works or lives, that is, the air one breathes when indoors.
It not only refers to comfort which is affected by temperature, humidity, air movement and odours but also to harmful biological contaminants and chemicals present in the conditioned space. Poor IAQ may be serious health hazard. Carbon dioxide has been recognized as the surrogate ventilation index.
2.14 Infiltration/Exfiltration — The phenomenon of outside air leaking into/out of an air conditioned space.
2.15 Ozone Depletion Potential (ODP) — The potential of refrigerant or gases to deplete the ozone in the atmosphere.
The ODP values for various refrigerants are as given below:
R-11
1.000
R-12
0.820
R-22
0.050
R-123
0.012
R-134a
0.000
R-407a
0.000
R-407c
0.000
R-410a
0.000
Due to high ODP of R-11, R-12 and R-22, their use in the air conditioning and refrigeration is being phasedout. R-123 is also in the phase-out category of refrigerants.
2.16 Plenum — An air compartment or chamber to which one or more ducts are connected and which forms part of an air distribution system.
The pressure drop and air velocities in the plenum should be low. Generally, the velocity in plenum should not exceed 1.5 m/s to 2.5 m/s.
2.17 Positive Ventilation — The supply of outside air by means of a mechanical device, such as a fan.
2.18 Psychrometry — The science involving thermodynamic properties of moist air and the effect of atmospheric moisture on materials and human
comfort. It also includes methods of controlling thermal properties of moist air.
2.19 Psychrometric Chart — A chart graphically representing the thermodynamic properties of moist air.
2.20 Recirculated Air — The return air that has been passed through the conditioning apparatus before being re-supplied to the space.
2.21 Refrigerant — The fluid used for heat transfer in a refrigerating system, which absorbs heat at a low temperature and low pressure of the fluid and rejects heat at a higher temperature and higher pressure of the fluid, usually involving changes of state of the fluid.
2.22 Relative Humidity — Ratio of the partial pressure of actual water vapour in the air as compared to the partial pressure of maximum amount of water that may be contained at its dry bulb temperature.
When the air is saturated, dry-bulb, wet-bulb and dewpoint temperatures are all equal, and the relative humidity is 100 percent.
2.23 Return Air — The air that is collected from the conditioned space and returned to the conditioning equipment.
2.24 Shade Factor — The ratio of instantaneous heat gain through the fenestration with shading device to that through the fenestration.
2.25 Sick Building Syndrome (SBS) — A term, which is used to describe the presence of acute non-specific symptoms in the majority of people caused by working in buildings with an adverse indoor environment. It could be a cluster of complex irritative symptoms like irritation of the eyes, blockened nose and throat, headaches, dizziness, lethargy, fatigue irritation, wheezing, sinusitis, congestion, skin rash, sensory discomfort from odours, nausea, etc. These symptoms are usually short-lived and experienced immediately after exposure; and may disappear when one leaves the building.
SBS is suspected when significant number of people spending extended time in a building report or experience acute on-site discomfort. The economic consequences of SBS, like BRI, are decreased productivity, absenteeism and the legal implications if occupants IAQ complaints are left unresolved.
2.26 Smoke Damper — A damper similar to fire damper, however, having provisions to close automatically on sensing presence of smoke in air distribution system or in conditioned space.
2.27 Static Pressure — The pressure that is required to be created by the fan over the atmospheric pressure
to overcome the system resistances such as resistances in ducts, elbows, filters, dampers, heating/cooling coils, etc.
Static pressure is measured by a U tube manometer relative to the atmospheric pressure, which is considered as zero pressure. In exhaust systems, fan produces negative static pressure, which is again used to overcome the system resistances.
2.28 Supply Air — The air that has been passed through the conditioning apparatus and taken through the duct system and distributed in the conditioned space.
2.29 Supply and Return Air Grilles and Diffusers — Grilles and diffusers are the devices fixed in the air conditioned space for distribution of conditioned supply air and return of air collected from the conditioned space for re-circulation.
2.30 Thermal Transmittance — Thermal transmission per unit time through unit area of the given building unit divided by the temperature difference between the air or some other fluid on either side of the building unit in ‘steady state’ conditions.
2.31 Thermal Energy Storage — Storage of thermal energy, sensible, latent or combination thereof for use in central system for air conditioning or refrigeration. It uses a primary source of refrigeration for cooling and storing thermal energy for reuse at peak demand or for backup as planned.
2.32 Water Conditioning — The treatment of water circulating in a hydronic system, to make it suitable for air conditioning system due to its effect on the economics of air conditioning plant.
Untreated water used in air conditioning system may create problems such as scale formation, corrosion and organic growth. Appraisal of the water supply source including chemical analysis and determination of composition of dissolved solids is necessary to devise a proper water-conditioning programme.
2.33 Water Hardness — Hardness in water represented by the sum of calcium and magnesium salts in water, which may also include aluminium, iron, manganese, zinc, etc. A chemical analysis of water sample should provide number of total dissolved solids (TDS) in a water sample in parts per million (ppm) as also composition of each of the salts in parts per million.
Temporary hardness is attributed to carbonates and bicarbonates of calcium and/or magnesium expressed in parts per million (ppm) as CaCO3° The remainder of the hardness is known as permanent hardness, which is due to sulphates, chloride, nitrites of calcium and/or magnesium expressed in ppm as CaCO₃
Temporary hardness is primarily responsible for scale formation, which results in poor heat transfer resulting in increased cost of energy for refrigeration and air conditioning. Permanent hardness (non-carbonate) is not as serious a factor in water conditioning because it has a solubility which is approximately 70 times greater than the carbonate hardness. In many cases, water may contain as much as 1 200 ppm of non-carbonate hardness and not deposit a calcium sulfate scale.
The treated water where hardness as ppm of CaCO is reduced to 50 ppm or below, is recommenced for air conditioning applications.
pH is a measure of acidity, pH is a negative logaritham base 10, of the concentration of hydrogen ion in grams per litre. Water having a pH of 7.0 is neutral, a pH value less than 7 is acidic and pH value greater than 7 is alkaline. Water with pH less than 5 is quite acidic and corrosive to ordinary metals and needs to be treated.
2.34 Wet-Bulb Temperature — The temperature registered by a thermometer whose bulb is covered by a wetted wick and exposed to a current of rapidly moving air of velocity not less than 4.5 m/s.
Wet-bulb temperature is indicated by a wet bulb psychrometer constructed and used according to specifications.
3Planning Design Criteria
3.1 Fundamental Requirements
3.1.1 The object of installing ventilation and air conditioning facilities in buildings shall be to provide conditions under which people can live in comfort, work safely and efficiently.
3.1.2 Ventilation and air conditioning installation shall aim at controlling and optimizing following factors in the building:
a) Air purity and filtration,
b) Air movement,
c) Dry-bulb temperature,
d) Relative humidity,
e) Noise and vibration,
f) Energy efficiency, and
g) Fire safety.
3.1.3 All plans, specifications and data for air conditioning, heating and mechanical ventilation systems of all buildings and serving all occupancies within the scope of the Code shall be supplied to the Authority, where called for see Part 2 ‘Administration’.
3.1.4 The plans for air conditioning, heating and mechanical ventilation systems shall include all
details and data necessary for review of installation such as:
a) building: name, type and location;
b) owner: name;
c) orientation: north direction on plans;
d) general plans: dimensions and height of all rooms;
e) intended use of all rooms;
f) detail or description of wall construction, including insulation and finish;
g) detail or description of roof, ceiling and floor construction, including insulation and finish;
h) detail or description of windows and outside doors, including sizes, weather stripping, storm sash, sills, storm doors, etc;
j) internal equipment load, such as number of people, motor, heaters and lighting load;
k) layout showing the location, size and construction of the cooling tower (apparatus), ducts, distribution system;
m) information regarding location, sizes and capacity of air distribution system, refrigeration and heating plant, air handling equipment;
n) information on air and water flow rates;
p) information regarding location and accessibility of shafts;
q) information regarding type and location of dampers used in air conditioning system;
r) chimney or gas vent size, shape and height;
s) location and grade of the required fire separations;
t) water softening arrangement; and
u) information on presence of any chemical fumes or gases.
4.2Design Considerations
4.2.1 Types of System
Systems for air conditioning need to control temperature and humidity within predetermined limits throughout the year. Various types of refrigerating systems are available to accomplish the tasks of cooling and dehumidifying, which are an essential feature of air conditioning. Systems for air conditioning may be grouped as all-air type, air and water type, all water type or unitary type.
4.2.1.1 All-air system
This type of air conditioning system provides complete sensible and latent cooling, preheating and humidification in the air supplied by the system. Most plants operate on the recirculation principle, where a percentage of the air is extracted and the remainder mixed with incoming fresh air.
Low velocity systems may be used. High velocity systems although require smaller ducts, are high on fan energy, require careful acoustic treatment and higher standards of duct construction.
4.2.1.1.1 Constant volume system
Accurate temperature control is possible, according to the system adopted. Low velocity system variations include dehumidification with return air bypass, and multi-zone (hot deck/cold deck mixing). High velocity system may be single or dual duct type.
4.2.1.1.2 Variable volume system
Most Indian air conditioning systems operate at partial load for most of the year and the variable air volume (VAV) system is able to reduce energy consumption by reducing the supply air volume to the space under low load conditions. The VAV system can be applied to interior or perimeter zones, with common or separate fans, with common or separate air temperature control. The greatest energy saving associated with VAV occurs at the perimeter zones, where variation in solar and outside temperature allow the supply air quantity to be reduced. Good temperature control is possible but care should be taken at partial load to ensure adequate fresh air supply and satisfactory control of air distribution and space humidity.
4.2.1.2 Air and water system
Control of conditions within the space is achieved by initial control of the supply air from a central plant but with main and final control at a terminal unit within the conditioned space. The supply air provides the
necessary ventilation air and the small part of the total conditioning. The major part of room load is balanced by water through a coil in the terminal unit, which can be either a fan coil unit or an induction unit.
3.2Pre-planning
3.2.1 Design Considerations
3.2.1.1 Cooling load estimate shall be carried out prior to installing air conditioning equipment. Calculation of cooling load shall take into account the following factors:
a) Recommended indoor temperature and relative humidity;
b) Outside design conditions as specified in 4.4;
c) Details of construction and orientation of exposures like roof, floor, walls, partition and ceiling;
d) Fenestration area and shading factors;
e) Occupancy — Number of people and their activity;
f) Ventilation — Requirement for fresh air;
g) Internal Load — Lighting and other heat generating sources like computers, equipment and machinery; and
h) Hours of use.
3.2.1.2 The design of system and its associated controls shall also take into account the following:
a) Nature of application,
b) Type of construction of building,
c) Permissible control limits,
d) Control methods for minimizing use of primary energy,
e) Opportunities for heat recovery,
f) Energy efficiency,
g) Filteration standard,
h) Hours of use,
j) Diversity factor, and
k) Outdoor air quality.
3.2.1.3 The operation of system in the following conditions should be considered when assessing the complete design:
a) Summer,
b) Monsoon,
c) Winter,
d) Intermediate seasons,
e) Night, and
f) Weekends and holidays.
3.2.1.4 Consideration should be given to changes in building load and the system designed so that maximum operational efficiency is maintained.
3.2.1.5 Special applications like hospitals/operating theatres, computer rooms, clean rooms, laboratories, libraries, museums/art galleries, sound recording studios, shopping malls, etc shall be handled differently.
3.2.2 Planning of Equipment Room for Central Air Conditioning Plant
3.2.2.1 In selecting the location for plant room, the aspects of efficiency, economy and good practice should be considered and wherever possible it shall be made contiguous with the building. This room shall be located as centrally as possible with respect to the area to be air conditioned and shall be free from obstructing columns.
Depending on the degree of control required, the water circulating system can be either of two, three or four pipe arrangement. With two pipe circulation a single flow and a single return circulate chilled or hot water as required. Such a system can only provide heating or cooling to the system on a changeover basis, so it is ineffective where wide modulations of conditions over short periods are required. The installed cost however is naturally the lowest of all the circulation systems. The three pipe system is a way of overcoming the disadvantages of the two pipe system without raising the installed cost too high. In this system a separate hot water flow and chilled water flow is taken to the terminal units but a common return is taken from these units to the plant room. The best system from a control point of view is the four pipe system, where separate hot water and chilled water supply and returns are taken from the plant room to the terminal units. Although the most expensive method of circulating the water, it is the only satisfactory one, if reasonable control is required throughout the year.
4.2.1.3 All water system
In the simplest layout, the fan coil units may be located against an outside wall with a direct, fresh air connection. A superior arrangement utilizes a ducted, conditioned, fresh air supply combined with mechanical extract ventilation,
Control of unit out put may be achieved by fan speed and water flow/temperature control. Electric power is required at each terminal unit.
Provision of variable volume water flow system for chilled water circulation is recommended for varying load conditions. This may be incorporated with the help of constant volume primary chilled water circuit and variable flow secondary chilled water circuit having pumps with variable speed drives and pressure sensor to control the speed. This system allows better control on energy consumption under partial load conditions due to diversity or seasonal load variations.
4.2.1.4 Unitary systems
Such systems are usually those incorporating one or more units or packaged air conditioners having a direct expansion vapour compression refrigeration system. Similar units using chilled water from a central plant would be designated fan coil systems. Most units are only suitable for comfort applications but specially designed units are also available for process and industrial applications.
4.2.2 Vapour Compression Water Chiller
These normally contain the complete refrigerating system, comprising the compressor, condenser, expansion device and evaporator together with the automatic control panel. The unit can be set down on to a solid foundation on resilient mountings. Pipe connection require flexible couplings; these should be considered in conjunction with the design of the pump mountings and the pipe supports.
Capacity control is normally arranged to maintain an approximately constant temperature of the chilled water leaving the evaporator. This may be adequate for one or two packages, but a more elaborate central control system may be necessary for a large number. The design of the refrigeration control system should be integrated, or be compatible, with the control system for the heat transfer medium circulated to the air cooler.
It is normal for installation to have several water chilling packages, both to provide for stand-by and enable the cooling load to be matched with the minimum consumption of power. Although most packages can reduce capacity to match the cooling demand, the consumption of the power per unit of cooling increases; the resulting drop in efficiency is most serious below one-third capacity.
Power consumption can be reduced by taking advantage of a fall in the ambient temperature, which permits a corresponding fall in the condensing temperature and consequent reduction in the compressor power. It is important, for economy in the operation, that the optimum equipment selection and design of the control system is achieved.
The classification of the water chilling packages is by the type of compressor.
4.2.2.1 Centrifugal compressors
These compressors have an impeller that imparts to the refrigerant vapour a high kinetic energy, which is then transformed into pressure energy. For water chilling applications, compressors with one or two stage of compression are used. Two stage units often incorporate an interstate economizer for improving efficiency.
The compressor can be modulated down to approaching 10 percent of full load capacity, with some control of the condensing pressure. Because of the nature of compression process, the flow through the compressor can become unstable if the compressor is called upon to produce a pressure rise in excess of its design limits. This phenomenon, known as surging, is a serious problem but occurs only under a fault condition. Typical faults are excessive fouling of the condenser, a partial failure of the condenser coolant flow or an
accumulation of a non-condensable gas (air) in the condenser. Unchecked surging can lead to damage to the compressor or its drive and does increase the noise level.
The use of low pressure refrigeration to suit the characteristics of the compressor in the smaller size range, means that the evaporator operates at below atmospheric pressure, thus a leak can draw in air and atmospheric moisture. These should be prevented from accumulating, since these interfere with the operation of the plant and cause corrosion.
The compressors may be driven either directly by electric motor or via a speed-increasing gear train. Units are available in ‘open’ form, that is, compressor and motor are separate items, or in semi-hermetic form where the motor and compressor are contained in a common pressure-tight casing that is bolted together. The latter type eliminates the drive shaft gland seal (a potential point of leakage), which is necessary on the former.
Certain types of open centrifugal compressors could conveniently be directly driven by a steam or gas turbine. This arrangement could be advantageous when the refrigeration plant forms part of total energy system.
The centrifugal compressor type water chilling packages normally include a shell-and-tube water cooled condenser and a flooded shell-and-tube evaporator, but unit are also available incorporating an air cooled condenser The expansion device is commonly an electronic expansion valve or high pressure float regulating valve.
4.2.2.2 Screw compressors
Two types of screw compressors are available, that is, single and twin screw, and both are positive displacement machines. Compression of the refrigerant vapour is achieved by the progressive reduction of the volume contained with in the helical flutes of the cylindrical rotor(s) as they rotate.
Oil is injected into the rotor chamber for sealing and lubrication purposes and is removed from the refrigerant discharge gas in an oil separator before the refrigerant passes on to the condenser. No oil separator is 100 percent efficient and so a small quantity of oil always passes through with the refrigerant. On systems using a direct expansion evaporator the oil is trapped in the evaporator and an oil recovery system is necessary.
With some systems oil cooler is required in the oil circulation system, to remove the heat gathered by the oil during compression cycle. On other systems liquid refrigerant is injected into the compressor to remove the heat of compression instead of using the
conventional oil cooler. Such an arrangement can impose a small penalty on the plant capacity.
The condenser most commonly used on packaged units is the water cooled shell-and-tube type, but equipment with air cooled condensers is also available. The expansion device used will depend on the evaporator type but it is often a electronic expansion valve (single or in multiple) of conventional or modified form.
Screw compressors are available in open and semi-hermetic form (see 4.2.2.1) and are generally coupled direct to two-pole motors. The capacity of the compressor can be modulated down to 10 percent of full load capacity.
4.2.2.3 Reciprocating compressors
These are available in a wide range of sizes and designs. They are almost invariably used in packages up to 120 TR cooling capacity.
Because the cylinders have automatic valves, a single compressor may be used over wide range of operating conditions with near optimum efficiency, whereas other types of compressor require detailed modification to give optimum efficiency at different conditions. This is, however, of minor importance for normal air conditioning duties.
Capacity control is achieved by making cylinders inoperative, usually by propping open the suction valves, thus, capacity reduction is in a series of steps rather than by modulation. Typically, a four-cylinder compressor would be unloaded in four steps. It is therefore necessary to allow for this stepwise operation in designing the chilled water temperature control system.
The evaporator is normally of the dry expansion type, to permit oil from the compressor to circulate round the system with the refrigerant. Shell-and-tube water cooled condensers are common, but any type of condenser can be used. With air cooled condensers it is normal practice to build the machine package so that it may be located on the roof in a package including the condenser.
It is common for the electric drive motors to be built into the compressor assembly; this is known as a ‘semi-hermetic’ drive to distinguish it from the ‘hermetic’, in which the compressor and motor are enclosed within a pressure vessel and cannot therefore be serviced.
The semi-hermetic compressor is more compact and is quieter in operation than the ‘open’ drive compressor, but involves a more difficult service operation in the event of a motor failure. It gains in reliability, however, by avoiding the shaft seal of the ‘open’ compressor.
It is recommended that multiple hermetic or semi-hermetic compressor unit should not be connected to a common refrigerant system, as failure of one motor can precipitate failure of the others. Separate refrigerant circuits for each compressor should be used.
4.2.3 Absorption System
The absorption cycle uses a solution that by absorbing the refrigerant replaces the function of the compressor. The absorbent/refrigerant mixture is then pumped to a higher pressure where the refrigerant is boiled off by the application of heat, to be condensed in the condenser.
Absorption machines are mostly used in liquid-chilling applications. These are most suitable for hotels and hospitals where steam is readily available from the boilers.
4.2.3.1 Indirect firing
The lithium bromide/water absorption system can be powered by medium or high temperature hot water and low or medium pressure steam. Water is the refrigerant and the lithium bromide the absorbent. The four compartments enclosing the heat exchanger tube bundles for the condenser, evaporator, generator and absorber can be in a single or multiple pressure vessel arrangement. The whole assembly has to be maintained under a high vacuum, which is essential for the correct functioning of the unit. Water and absorbent solutions are circulated within the unit by electrically driven pumps.
Capacity control down to 10 percent of full load capacity is achieved by modulating the flow of the heating medium in relation to the cooling demand. There is some loss in performance at part load, which can be compensated by refinements in the system design and control.
4.2.3.2 Direct firing
Direct fired lithium bromide/water absorption plants have become common, by incorporating precise control of generator temperature necessary to avoid crystallization.
Ammonia/water systems can be and are direct fired, but are rarely used for water chilling duties except for small sized units, which are installed outside the building. There are two reasons or this, firstly capital costs are higher and secondly the danger to personnel in the event of leakage of the refrigerant.
Direct firing has the advantage that the losses in an indirect heating system are avoided, but in an air conditioning installation where a boiler system is installed to provide heating, the advantage is minimal.
In the case of large installations (500 TR and above), it is advisable to have a separate isolated equipment room where possible. The clear headroom below soffit of beam should be minimum 4.5 m for centrifugal plants, and minimum 3.6 m for reciprocating and screw type plants.
3.2.2.2 The floors of the equipment rooms should be light coloured and finished smooth. For floor loading, the air conditioning engineer should be consulted (see also Part 6 ‘Structural Design, Section 1 Loads, Forces and Effects’).
3.2.2.3 Supporting of pipe within plant room spaces should be normally from the floor. However, outside plant room areas, structural provisions shall be made for supporting the water pipes from the floor/ceiling slabs. All floor and ceiling supports shall be isolated from the structure to prevent transmission of vibrations.
3.2.2.4 Equipment rooms, wherever necessary, shall have provision for mechanical ventilation. In hot climate, evaporative air-cooling may also be considered.
3.2.2.5 Plant machinery in the plant room shall be placed on plain/reinforced cement concrete foundation and provided with anti-vibratory supports. All foundations should be protected from damage by providing epoxy coated angle nosing. Seismic restraints requirement may also be considered.
3.2.2.6 Equipment room should preferably be located adjacent to external wall to facilitate equipment movement and ventilation.
3.2.2.7 Wherever necessary, acoustic treatment should be provided in plant room space to prevent noise transmission to adjacent occupied areas.
3.2.2.8 Air conditioning plant room should preferably be located close to main electrical panel of the building in order to avoid large cable lengths.
3.2.2.9 In case air conditioning plant room is located in basement, equipment movement route shall be planned to facilitate future replacement and maintenance. Service ramps or hatch in ground floor slab should be provided in such cases.
3.2.2.10 Floor drain channels or dedicated drain pipes in slope shall be provided within plant room space for effective disposal of waste water. Fresh water connection may also be provided in the air conditioning plant room.
3.2.2.11 Thermal energy storage
In case of central plants, designed with thermal energy storage its location shall be decided in consultation with the air conditioning engineer. The system may be located in plant room, on rooftop, in open space near plant room or buried in open space near plant room.
For roof top installations, structural provision shall take into account load coming due to the same.
For open area surface installation horizontal or vertical
system options shall be considered and approach ladders for manholes provided.
Buried installation shall take into account loads due to movement above, of vehicles, etc.
Provision for adequate expansion tank and its connection to thermal storage tanks shall be made.
3.2.3 Planning Equipment Room for Air Handling Units and Package Units
3.2.3.1 This shall be located as centrally as possible to the conditioned area and contiguous to the corridors or other spaces for carrying air ducts. For floor loading, air conditioning engineer shall be consulted (see also Part 6 ‘Structural Design, Section 1 Loads, Forces and Effects’).
3.2.3.2 In the case of large and multistoried buildings, independent air handling unit should be provided for each floor. The area to be served by the air-handling unit should be decided depending upon the provision of fire protection measures adopted. Air handling unit rooms should preferably be located vertically one above the other.
3.2.3.3 Provision should be made for the entry of fresh air. The fresh air intake shall have louvers having rain protection profile, with volume control damper and bird screen.
3.2.3.4 In all cases air intakes shall be so located as to avoid contamination from exhaust outlets or to the sources in concentrations greater than normal in the locality in which the building is located.
3.2.3.5 Exterior openings for outdoor air intakes and exhaust outlets shall preferably be shielded from weather and insects.
3.2.3.6 No air from any dwelling unit shall be circulated directly or indirectly to any other dwelling unit, public corridor or public stairway.
3.2.3.7 All air handling rooms should preferably have floor drains and water supply. The trap in floor drain shall provide a water seal between the air conditioned space and the drain line.
3.2.3.8 Supply/return air duct shall not be taken through emergency fire staircase. However, exception can be considered if fire isolation of ducts at wall crossings is carried out.
3.2.3.9 Waterproofing of air handling unit rooms shall be carried out to prevent damage to floor below.
3.2.3.10 The floor should be light coloured, smooth finished with terrazzo tiles or the equivalent. Suitable floor loading should also be provided after consulting with the air conditioning engineer.
3.2.3.11 Where necessary, structural design should avoid beam obstruction to the passage of supply and return air ducts. Adequate ceiling space should be made available outside the air handling unit room to permit installation of supply and return air ducts and fire dampers at air handling unit room wall crossings.
3.2.3.12 The air handling unit rooms may be acoustically treated, if located in close proximity to occupied areas.
3.2.3.13 Access door to air handling unit room shall be single/double leaf type, air tight, opening outwards and should have a sill to prevent flooding of adjacent occupied areas. It is desired that access doors in air conditioned spaces should be provided with tight sealing, gaskets and self closing devices for air conditioning to be effective.
3.2.3.14 It should be possible to isolate the air handling unit room in case of fire. The door shall be fire resistant and fire/smoke dampers shall be provided in supply/ return air duct at air handling unit room wall crossings and the annular space between the duct and the wall should be fire-sealed using appropriate fire resistance rated material.
3.2.3.15 For buildings with large structural glazing areas, care should be taken for providing fresh air intakes in air handling unit rooms. Fire isolation shall be provided for vertical fresh air duct, connecting several air handling units.
3.2.4 Planning of Pipe Shafts
3.2.4.1 The shafts carrying chilled water pipes should be located adjacent to air handling unit room or within the room.
3.2.4.2 Shaft carrying condensing water pipes to cooling towers located on terrace should be vertically aligned.
3.2.4.3 All shafts shall be provided with fire barrier at floor crossings (see Part 4 ‘Fire and Life Safety’).
3.2.4.4 Access to shaft shall be provided at every floor.
3.2.5 Planning for Supply Air Ducts and Return Air
3.2.5.1 Duct supports, preferably in the form of angles of mild steel supported using stud anchors shall be provided on the ceiling slab from the drilled hole. Alternately, duct supports may be fixed with internally threaded anchor fastners and threaded rods without damaging the slabs or structural members.
3.2.5.2 If false ceiling is provided, the supports for the duct and the false ceiling, shall be independent.
Collars for grilles and diffusers shall be taken out only after false ceiling/boxing framework is done and frames for fixing grilles and diffusers have been installed.
3.2.5.3 Where a duct penetrates the masonry wall it shall either be suitably covered on the outside to isolate it from masonry, or an air gap shall be left around it to prevent vibration transmission. Further, where a duct passes through a fire resisting compartment/barrier, the annular space shall be sealed with fire sealant to prevent smoke transmission (see also Part 4 ‘Fire and Life Safety’).
3.2.6 Cooling Tower
3.2.6.1 Cooling towers are used to dissipate heat from water cooled refrigeration, air conditioning and industrial process systems. Cooling is achieved by evaporating a small proportion of recirculating water into outdoor air stream. Cooling towers are installed at a place where free flow of atmospheric air is available.
3.2.6.2 Range of a cooling tower is defined as temperature difference between the entering and leaving water. Approach of the cooling tower is the difference between leaving water temperature and the entering air wet bulb temperature.
3.2.6.3 Types of cooling tower
3.2.6.3.1 Natural draft
This type of tower is larger than mechanical draft tower as it relies on natural convection to obtain the air circulation. A natural draft tower needs to be tall to obtain the maximum chimney effect or rely on the natural wind currents.
3.2.6.3.2 Mechanical draft
The fans on mechanical draft towers may be on the inlet air side (forced draft) or exit air side (induced draft). Typically, these have centrifugal or propeller type fans, depending on pressure drop in tower, permissible sound levels and energy usage requirement. On the basis of direction of air and water flow, mechanical draft cooling towers can be counter flow or cross flow type.
3.2.6.4 Factors to be considered for cooling tower selection are:
a) Design wet-bulb temperature and approach of cooling tower.
b) Height limitation and aesthetic requirement.
c) Location of cooling tower considering possibility of easy drain back from the system.
d) Placement with regard to adjacent walls and
windows, other buildings and effects of any water carried over by the air stream.
e) Noise levels, particularly during silent hours and vibration control.
f) Material of construction for the tower.
g) Direction and flow of wind.
h) Quality of water used for make-up.
j) Maintenance and service space.
k) Ambient air quality.
3.2.6.5 The recommended floor area requirement for various types of cooling tower is as given below:
a) Natural draft cooling 0.15 to 0.20 m2/t tower of refrigeration
b) Induced draft cooling 0.10 to 0.13 m2/t tower of refrigeration
c) Fibre-reinforced 0.07 to 0.08 m2/t plastic of refrigeration
3.2.6.6 Any obstruction to free flow of air to the cooling tower shall be avoided.
3.2.6.7 Structural provision for the cooling tower shall be taken into account while designing the building. Vibration isolation shall be an important consideration in structural design.
3.2.6.8 Special design requirements are necessary where noise to the adjoining building is to be avoided.
3.2.6.9 As given below, certain amount of water is lost from circulating water in the cooling tower:
a) Evaporation loss — In a cooling tower, the water is cooled by evaporating a part of the circulating water into the air stream. The amount of circulating water so evaporated is called ‘evaporation loss’. Usually it is about 1 percent of the rate of water circulation.
b) Drift loss — A small part of circulating water is lost from the cooling tower as liquid droplets entrained in the exhaust air stream. Usually the drift loss is 0.1 percent to 0.2 percent of rate of water circulation.
c) Blow-down/bleed-off — To avoid concentration of impurities contained in the water beyond a certain limit, a small percentage of water in the cooling water system is often purposely drained off or discarded. Such a treatment is called ‘blow-down’ or ‘bleedoff’. The amount of blow-down is usually 0.8 percent to 1 percent of the total water circulation.
If simple blow-down is inadequate to control scale
formation, chemicals may be added to inhibit corrosion and limit microbiological growth.
Provision shall be made to make-up for the loss of circulating water.
3.2.6.10 Provision for make-up water tank to the cooling tower shall be made. Make-up water tank to the cooling tower shall be separate from the tank serving drinking water.
3.2.6.11 Make-up water having contaminants or hardness, which can adversely affect the refrigeration plant life, shall be treated.
3.2.6.12 Cooling tower should be so located as to eliminate nuisance from drift to adjoining structures.
3.2.7 Glazing
3.2.7.1 Glazing contributes significantly to heat addition in air conditioned space; measures shall, therefore, be adopted to minimize the gain.
3.2.7.2 While considering orientation of the building, (see Part 8 ‘Building Services, Section 1 Lighting and Ventilation’) glazing in walls subjected to heavy sun exposure shall be avoided. In case it is not possible to do so, double glazing or heat resistant glass should be used. Glazing tilted inward at about 12° also helps curtail transmission of direct solar radiation through the glazing.
3.2.7.3 Where sun breakers are used, the following aspects shall be kept in view:
a) The sun breakers shall shade the maximum glazed area possible, specially from the altitude and azimuth angle of the sun, which is likely to govern the heat load.
b) The sun breakers shall preferably be light and bright in colour so as to reflect back as much of the sunlight as possible.
c) The sun breakers shall preferably be 1 m away from the wall face, with free ventilation, particularly from top to bottom and are meant for carrying away the heat which is likely to get boxed between the sun breakers and the main building face.
d) The sun breakers shall be installed as to have minimum conduction of heat from sun breakers to the main building.
3.2.7.4 Where resort is taken to provide reflecting surfaces for keeping out the heat load, care should be taken regarding the hazards to the traffic and people on the road from the reflected light from the surfaces.
3.2.7.5 Day light transmittance for various type of glass is given in Table 1.
Table 1Day Light Transmittance for Various Types of Glass
Sl Type of Glass Visible Transmittance No. W/(m<sup>2</sup> °C)(1) (2) (3)
i) 3 mm regular sheet or plate glass 0.86 to 0.91 ii) 3 mm grey sheet glass 0.31 to 0.71 iii) 5 mm grey sheet glass 0.61 iv) 5.5 mm grey sheet glass 0.14 to 0.56 6 mm grey sheet glass 0.52 v) 6 mm green/float glass 0.75 vi) 6 mm grey plate glass 0.44 vii) 6 mm bronze plate glass 0.49 viii) 13 mm grey plate glass 0.21 ix) 13 mm bronze plate glass 0.25 x) Coated glasses (single, laminated, 0.07 to 0.50 insulating)
3.2.8 Roof Insulation
3.2.8.1 Under-deck or over-deck insulation shall be provided for exposed roof surface using suitable insulating materials. Over-deck insulation should be properly waterproofed to prevent loss of insulating properties.
3.2.8.2 The overall thermal transmittance from the exposed roof should be kept as minimum as possible and under normal conditions, the desirable value should not exceed 0.58 W / ( m 2 ° C ) ).
3.2.8.3 The ceiling surface of floors which are not to be air conditioned may be suitably insulated to give an overall thermal transmittance not exceeding 1.16 W / ( m 2 ° C )