No. Ch.E./DP/
of
OFFICE OF THE:
Chief Engineer (Development Plan)
Brihanmumbai Mahanagarpalika,
Municipal Head Office,
5th floor, Annexe Building,
Mahapalika Marg,
Fort, Mumbai-400 001.
Final Possession Receipt
Sub:- Handing over and taking over of D.P. Road /Reservation/Amenity area out of Survey No. /H .No. ................, CTS No. /C.S. No. / F.P. No. ........... .................... of village /Division/ T.P. Scheme No. ........................... in.......... Ward.
Ref:-1) Advance possession Receipt No. Dy.Ch. E. /BP/........... dtd……………..
working as Assistant Engineer in the Office of Ch.E. (D.P.) and......., the owner for the said plot of the land have respectively taken over and handed over the possession of the above mentioned vacant land.
The particulars of land are as mentioned below-
| Survey No. | H. No. | CTS No./ C.S.No./F.P. No. | Village/Division | Area in Sq. m. |
|---|---|---|---|---|
• The compound wall with gate wherever necessary is provided.
• The necessary provision of storm water drain is made.
• The area of the D P Road/Reserved land/Amenity area has been ascertained on the basis of Joint Measurement Survey with SLR/C.S. Office under M.R. Plan No. . dated ... ..... with communication No. ........ dated .. ........ and as per the provisions of these Regulations.
• The Title Clearance has been certified by Advocate/Solicitor who has experience in this field of a minimum 10 years
• Any other conditions as may deem fit and proper in the interest of general public.
• The possession of above land is taken over subject to the owner/developer agreeing to rectify the defects in the works and in terms of Undertaking separately given by the owner.
• Ownership of land so handed over shall be transferred in the name of MCGM in land revenue records. The cost of any transaction involved shall be borne by the owner or lessee
APPENDICES AND ANNEXURES
NOTE:-In case of constructed built up amenity to be handed over along with plot as per the provisions of these Regulations, then the details such as built up area of amenity, number of tenements/non-residential galas, along with requirements like number of parking with their earmarking on the occupation plans and details Occupation/Completion Certificate shall be clearly mentioned in the possession receipt.
On ........... ....... Day of the month of ...............
Handed over by
Taken over by
OWNER
Sub/Asstt. Engineer Development Plan ( Ward)
Address:
314
APPENDICES AND ANNEXURES
Municipal Corporation of Greater Mumbai
No. Ch.E. /DP/
of
Final Possession Receipt
Sub:- Handing over and taking over possession of D.P.Road/Reservation/Amenity out of Survey No./H.No. ................, CTS No. /C.S. No./ F.P. No. ......... village /Division/ T.P.Scheme No. ........................... in .......... Ward.
working as Assistant Engineer in the Office of Ch.E.(D.P.) and............, working as Assistant Engineer in the Office of Assistant Commissioner (Estates) / Ward for the said plot of the land have respectively handed over and taken over the possession of the above mentioned vacant land.
The particulars of land is as mentioned below-
| Survey No. | H. No. | CTS No./ C.S.No./F.P. No. | Village/Division | Area in Sq. m. |
|---|---|---|---|---|
• The compound wall with gate wherever applicable is provided.
• The necessary provision of storm water drain is made.
• The area of the D P Road/Reserved land/Amenity area has been ascertained on the basis of Joint Measurement Survey with SLR/C.S. Office under M.R. Plan No. dated . ..... with communication No. . .......... dated .. ............. and as per the provisions of these Regulations.
• The Title Clearance has been certified by Advocate/Solicitor who has experience in this field of a minimum 10 years
• Any other conditions as may deem fit and proper in the interest of general public.
• The possession of above land is taken over subject to the owner/developer agreeing to rectify the defects in the works and in terms of Undertaking separately given by the owner.
• Ownership of land so handed over shall be transferred in the name of MCGM in land revenue records. The cost of any transaction involved shall be borne by the owner or lessee
NOTE:-In case of constructed built up amenity to be handed over along with plot as per the provisions of these Regulations, then the details such as built up area of amenity, number of tenements/non-residential galas, along with requirements like number of parking with their earmarking on the occupation plans and details Occupation/Completion Certificate shall be clearly mentioned in the possession receipt.
On ......... ...... Day of the month of ............
Handed over by
Taken over by
Sub/Assistant. Engineer
Sub/Assistant Engineer
Development Plan ( Ward)
Assistant Commissioner (Estates) / Ward
Development Control and Promotion Regulation-2034
APPENDICES AND ANNEXURES