- Floor Space Indices & Floor space / Built-Up Area (BUA) computation, Tenement Density and Protected Development
(A) Floor Space Indices & Floor space /BUA computation
1 The area of a plot shall be reckoned in FSI/BUA calculations applicable to development to be undertaken as under: -
| Sr No | Areas | Zone | Road width | Zonal (Basic) | Additiona l FSI on payment of Premium | Admis sible TDR | Permis sible FSI(4+5+6) |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | |
| I | Island City | Residential/Commercial | Less than 9m | 1.33 | - | - | 1.33 |
| 9m & above but less than12.00m | 1.33 | 0.5 | 0.17 | 2.0 | |||
| 12.00m& above but less than18.00m | 1.33 | 0.62 | 0.45 | 2.4 | |||
| 18.00m & above but less than27m | 1.33 | 0.73 | 0.64 | 2.7 | |||
| 27 m and above | 1.33 | 0.84 | 0.83 | 3.0 |
PART - V FLOOR SPACE INDEX
| Sr No | Areas | Zone | Road width | Zonal (Basic) | Additiona l FSI on payment of Premium | Admis sible TDR | Permis sible FSI(4+5+6) | |
| II | Suburbs and Extended Suburbs | |||||||
| i | The area earmarked for BARC from M Ward | Residential/Commercial | 0.75 | - | - | 0.75 | ||
| ii | Areas of the village of Akse, Marve and CRZ affected areas of Erangal in P/North Ward excepting gaothan proper. | Residential/Commercial | 0.5 | - | - | 0.50 | ||
| iii | The remaining area in Suburbs and Extended Suburbs | Residential/Commercial | Less than 9m | 1.0 | - | - | 1.0 | |
| 9m & above but less than12.00m | 1.0 | 0.5 | 0.5 | 2.0 | ||||
| 12.00m& above but less than18.00m | 1.0 | 0.5 | 0.7 | 2.2 | ||||
| 18.00m & above but less than27m | 1.0 | 0.5 | 0.9 | 2.4 | ||||
| 27 m and above | 1.0 | 0.5 | 1.0 | 2.5 | ||||
| III | Island City | Industrial | 1.0 | - | - | 1.0 | ||
| IV | Suburbs and Extended Suburbs | Industrial | 1.0 | - | - | 1.0 | ||
Note – 1) The plots abutting public roads having existing width of minimum 6m but less than 9m which are proposed to be widened to 9.0 m or more then permissible FSI shall be as admissible for 9m road width.
- TDR & additional FSI on payment of premium Ratio can be change by Government from time to time keeping the total Cap as it is.
PART - V FLOOR SPACE INDEX
2 The permissible FSI shall be on plot area excluding area under DP roads/roads for which sanctioned Regular line as per MMC Act is prescribed, as per regulation 16,14 (amenity plots), and area of DP Reservation to be surrendered to MCGM/Appropriate Authority under Regulation no 17.
3 In case of Sr. No. 2 above;
a) TDR as per regulation 32 Table 12(A) of land surrendered to MCGM/Appropriate Authority as per Sr. No. 2 above may be allowed to be consumed in the form of FSI as per column no 6 of table No. 12 above on the remainder/balance plot within the admissible limit of TDR except in case of development of reserved area under the principle of Accommodation Reservation (AR) under regulation 17. In case of development of reserved area under AR the Note 20(vii) & (viii) of regulation 17(1) shall be made applicable.
Provided further that FSI equivalent to TDR as per Table 12 A of Regulation 32, in lieu of road widening or roads proposed under the D.P. or the MMC Act, 1888 as per Regulation 16 may be allowed to be utilized over and above the permissible FSI as per column 7 of table 12, on remainder plot.
b) TDR in lieu of cost of construction of built up amenity to be handed over as per the provisions of Regulation number 17(1) note 1(d) for Regulation 14, 15 & 17 shall be permissible within permissible BUA or owner may avail the TDR if not consumed on the remainder land as per these Regulations.
c) If owner/developer is unable to consume even Zonal (basic) FSI due to planning constraints, he shall be entitled for TDR for the unconsumed BUA thereof including a & c above. (Kept in abeyance)
In such cases, no additional FSI on payment of premium/TDR shall be allowed to be utilized on remainder /balance plot.
4 The permissible FSI shall be on plot area including areas to be surrendered to MCGM/Appropriate Authority under Regulation no 35 (development of cotton textile mills). (Kept in abeyance)
BUA so arrived shall be allowed to be consumed on the balance plot after handing over of Reservation/Amenity/Plot/DP road/roads for which sanctioned Regular line is prescribed as per MMC Act to MCGM within the admissible limit.
- Premium shall be charged for ‘additional FSI on payment of premium’ (as per column no 5 of table no 12) for BUA at the rate of 50% of the land rates as per ASR (for FSI 1) of the year in which such FSI is granted or as may be decided by Govt. from time to time. Premium so recovered shall be shared between the State Govt., MCGM, MSRDC and Dharavi Authority on 25:25:25:25 basis. The MCGM shall utilize the premium for implementation of D P.
Provided further that utilization of ‘additional FSI on payment of Premium’ and TDR is optional and can be utilized in any sequential manner subject to limit prescribed in column no 5 & 6 of Table No 12 above & shall be non-transferable. ‘Additional FSI on payment of Premium’ is to be granted on application and payment of premium &shall be used on the same plot only.
- A Development cess at the rate of 100% of Development charge, for BUA over and above the Zonal (basic) FSI/protected BUA whichever is higher (excluding fungible compensatory area) in accordance with the Time Schedule for such payment as may be laid down by the Commissioner, MCGM shall be paid. This development cess shall not be applicable to BUA to be handed over to MCGM/Appropriate authority & BUA which are excluded from FSI computation. This
PART - V FLOOR SPACE INDEX
DCPR-2034
8
Development cess shall be in addition to development charges levied as per section 124 of MR&TP Act 1966. This development cess shall not be applicable for proposals of Govt. /MCGM executed departmentally.
The payment of Development cess as detailed above will not be payable in cases where development cess is proposed under Regulation no 33(3), 33(3(A), 33(3(B), 33(5), 33(7), 33(7)(A), 33(9), 33(9)(B),33(10),33(11)and for development where the payment of off-site infrastructure charges/development cess is applicable and for these Regulations development cess/off-site infrastructure charges shall be payable as described in the concerned Regulations.
The owner shall give advance possession of the land to be handed over to MCGM/MHADA/Appropriate Authority, wherever applicable, at the time of seeking permission for development of plot. It shall be the responsibility of the land owner to clear off all encumbrances and complete the formalities towards transferring the land in the name of MCGM/MHADA/Appropriate Authority in Land Revenue Record.
The aforesaid plot, free of encumbrances, shall be handed over to MCGM/MHADA/Appropriate Authority within twenty four months from the date of approval of building plans/approval of the layout. The FSI of such plot can be utilized on remainder plot only after handing over of such plot to MCGM or before availing Zonal (basic) FSI beyond 75% of plot area or granting Occupation Certificate to any of the buildings, whichever is earlier. The ownership of such plot shall be transferred in the name of MCGM/ MHADA/Appropriate Authority in Land Revenue Records before seeking occupation to any of the buildings in the layout other than amenity.
The area of built up amenity shall be counted in FSI initially and after handing over of said built up amenity, the area of built up amenity shall be allowed free of FSI. Commencement Certificate in respect of BUA in lieu of the built-up amenity to be handed over to MCGM under AR can be granted only after handing over of such built up amenity
11 Fungible Compensatory Area/BUA shall be permissible over and above permissible FSI as per column no 7 of Table No.12 above and as per the provisions of Regulation no 31(3).
12 The Development of plots under combination of various regulations shall be permissible, but the maximum permissible FSI on plot shall not exceed the permissible FSI limit prescribed in respective regulations.
13 TDR in lieu of balance BUA after loading of “additional FSI on payment of premium & Admissible TDR’’ as per table 12 above shall not be permissible.
14 In case of development as per this regulation and/or under the provisions of 33(2), 33(3), 33(3) (A), 33(3) (B), 33(8) (B), 33(11), 33(20) (A) the premium shall be applicable to the Central Govt. and their statutory bodies/Central Govt. undertaking/State Govt. undertaking etc. except State Govt. and MCGM itself.
Note: (1) Area of Layout open spaces as required under Regulation No 27 shall not be deducted for the computation of BUA/FSI.
(2) In case of new Development/Redevelopment proposal under this Regulation, where the plot is affected by Road line/DP Road/Reservation and where the land affected by Road line/DP Road/Reservation is either merged or handed over to MCGM/Appropriate Authority &where FSI benefit of the same had already been taken in the earlier development proposal as per then prevailing Regulation or monetary compensation had been claimed in the past, but ownership has not been transferred in the name of MCGM/Appropriate Authority, in such cases the plot area shall be reckoned after deduction of such areas.
PART - V FLOOR SPACE INDEX
(3)The Occupation Certificate for buildings constructed out of last 25% of admissible FSI for residential/commercial use shall be granted by the Commissioner only after recreational area is developed and structure for recreational activities are actually provided on site. Provided further that in case of layout having 2 or more buildings, development of proportionate recreational area may be permitted subject to completion of entire recreational area & structure thereon for recreational activities prior to seeking occupation of last buildings.
(4) In case of Government/Semi-Government Department and Organizations/Public Sector Authorities/Undertakings such as the Atomic Energy Department, the Civil Aviation Department, International Airport Authority of India, Defence authorities, Railway authorities and the Mumbai Port Trust, for computing the available FSI, the area of lands not Existing Amenity/reserved but shown as such in the DP for the following purpose shall be excluded:
i.Playgrounds, stadia, golf courses;
ii.Parade grounds, training grounds, firing ranges;
iii.Green areas within their complexes;
iv.Lands kept open for operational purposes;
v.Lands under major internal roads;
vi.Railway tracks and yards;
vii.Lands unauthorizedly reclaimed;
viii.Lands of air-fields and air-strips.
(B) Tenement Density
-
Maximum tenement density shall be 450 per ha for FSI 1.00 and shall be appropriately increased/reduced proportionate to FSI 1.00.
-
Minimum tenement density for Rehabilitation and Resettlement/ affordable housing plots/shall be 325 per ha for FSI 1.00 and shall be appropriately increased/reduced proportionate to FSI 1.00.