33. Additional Floor Space Index (FSI) which may be allowed to certain categories:
33 (1) Additional FSI to Religious building:
The Municipal Commissioner may permit 0.5 FSI in addition to the Zonal (basic) FSI in respect of buildings of Registered Public Trust subject to following terms and conditions:
i.NOC shall be obtained from Police Authority and Collector before applying for permission.
ii.Additional FSI shall be used for religious purpose alone. However, without taking into account the additional FSI, ancillary residential/commercial uses will be permissible up to 10% of Zonal (basic) FSI.
iii.Additional FSI shall be permissible to existing authorized religious user subject to structural stability.
iv.Additional FSI shall be permissible subject to payment of premium at the rate of 25% of ASR of the land (For FSI 1) of the year in which such FSI is granted for the BUA and shall be equally shared between GoM & MCGM.
v.The minimum area of plot shall be 250 sq. m.
33 (2) Buildings of Medical and Educational Institutions and Other Institutional Buildings covered under Regulation (2) (IV) (17) (g): -
The Municipal Commissioner, by special permission, may permit up to FSI 5 for medical Institutions and FSI up to 4 for educational & other Institutional buildings including the Zonal (basic) FSI specified in Table No 12 in respect of buildings on independent plots of educational/medical institutions and institutional buildings of Govt./MCGM or public authorities or of registered public charitable trusts or of medical institutions run on cooperative basis established for charitable purposes and registered under the provisions of Income Tax Act or Maharashtra Cooperative Societies Act or private medical institutions subject to terms and conditions he may specify subject to minimum width of 13.40m except educational institutions;
Provided that in the case of additional FSI allowed to the above cited institutions, except institutional buildings of State Govt. & MCGM, premium for BUA, at the rate of 10% of the land rates as per ASR (for FSI 1) for educational institutions, at the rate of 15% of the land rates as per ASR (for FSI 1)for medical institutions, at the rate of 20% of the land rates as per ASR (for FSI 1)for the private hospitals, medical Institutions and at the rate of 30% of the land rates as per ASR (for FSI 1)for other institutional buildings shall have to be paid , beyond Zonal (basic) FSI. Govt. may from time to time change the rate of premium. The amount of premium shall be equally shared between Govt. and MCGM.
Out of the additional FSI beyond Zonal (basic) FSI, 50% may be availed by utilizing TDR (without payment of premium), provided that the utilization of such TDR will be allowed as per the option of the owner/developer.
In regard to other Institutional Buildings covered under Regulation (2) (IV) (17) (g), Govt. /Municipal Commissioner may from time to time specify terms and conditions.
33(3) Buildings of Government/MCGM/Statutory Bodies, Semi-Government and PSU Offices:
The Commissioner, by special permission, may permit FSI up to 5 including Zonal (basic) FSI specified in Table No 12 for office use& other allied purposes except residential use considering the specific requirement of Govt./MCGM and their Statutory Bodies, Semi Govt. and PSUs as detailed below:
Sr No
Minimum Road Width
Maximum Permissible FSI
1
12m
Up to 3
2
18m
Up to 4
3
27m
Up to 5
Provided further that in case of Public Sector Undertaking the premium for FSI beyond Zonal (basic) FSI shall be payable as decided by Govt. from time to time.
Premium shall be applicable for BUA in lieu of additional FSI at the rate of 50% of ASR of developed land (for FSI 1) or as decided by the Government from time to time, except for the development by State Government & MCGM.
(B) Terms and Conditions for Educational Institution or Institutional Buildings
(a) Additional BUA beyond Zonal (basic) FSI shall be utilized for bonafide educational purpose only.
(b)Such Institutions shall make available some rooms to Govt as and when required.
(c) 10% of the total seat capacity shall be reserved for Govt nominees on recommendation by the Department of Education/Higher and Technical Education, GoM.
(d)The Directors of School Education/Higher and Technical Education, GoM shall be the competent authority for observance of (a),(b) & (c) above, including determination of penalties for breach of conditions.
(e) The Educational Institution shall maintain records of free/concessional education furnish such records periodically and make them available to the Directors of School Education/Higher & Technical Education, GoM on demand.
(f) The Educational Institution shall file an undertaking to abide by the cited terms and conditions before allowing utilization of 50% of additional permissible FSI beyond Zonal (basic) FSI.
(C) Terms and Conditions for Buildings of Private Medical & Educational Institutions
(a) Such additional FSI (except the TDR component) will be permissible subject to the payment of premium as decided by Govt. from time to time, to be shared equally between GoM and MCGM.
(b) Conditions stipulated in (A) & (B) above shall be adhered to.
1)The Municipal commissioner shall intimate the concerned appropriate implementing authority regarding grant of building permission / occupation certificate to enable such authority to comply with the aforesaid conditions mentioned in (A),(B) &(C).
(2) If the additional FSI as per the above provisions has availed and subsequently it is found that the built-up space is being used for non medical/ educational /institutional commercial activities / any other activity, not permitted as per these regulations, a penal action as below will be taken, the payment shall be shared between the MCGM and the Government in the ratio of 3:1.
a) The misuse shall be ascertained by physical site verification by a team of officers from the MCGM, which has approved the building plans.
b) A per day penalty equal to 0.3% of the prevailing ready reckoner value of the built-up area that has been found to be used for non medical/ educational/institutional activities, shall be imposed.
c) The penalty will be recovered from the date of commencement of unauthorized use till the day non medical/ educational /institutional activities.
After payment of the penalty to the MCGM, which has sanctioned the building plans of the concerned medical/ educational/institutional, the said medical/ educational /institution will restore the use of premises to the original purpose for which LOI/ Registration was granted. If the
PART VI ADDITIONAL FLOOR SPACE INDEX
said medical/ educational/institutional fails to pay penalty and / or restore the use to its original intended use, the MCGM will take suitable action under the Maharashtra Regional and Town Planning Act 1966, against the concern.
These provisions will be over and above the penal provisions of the MRTP Act, 1966.
(A) Terms and Conditions for Medical Institutions and Institutional Building
(a)Additional BUA beyond Zonal (basic) FSI shall be utilized for bonafide medical purpose only.
(b)20% of the total beds and free treatment shall be given to EWS/persons below poverty line. In addition,10% of the total number of patients in OPD shall be provided treatment at rates charged
PART VI ADDITIONAL FLOOR SPACE INDEX
in Govt. hospitals. Such facility, proportionate to cited percentages, shall be in separate building/wing, or if not possible, on separate floor.
(c)The Director of Health Services, GoM shall be the competent authority for observance of (a) & (b) above, including determination of penalties for breach of conditions.
(d)The Medical Institution shall maintain records of free/concessional medical treatment furnish such records periodically and make them available to the Director of Health Services on demand.
(e)The Medical Institution shall file an undertaking to abide by the cited terms and conditions before allowing utilization of 50% of additional permissible FSI beyond Zonal (basic) FSI.
33(3) (A) Development/Redevelopment for construction of staff quarters of Govt. or its statutory bodies (including CISF) or MCGM or its statutory bodies, on lands belonging to such Public Authorities:
1.The Commissioner may permit FSI up to 4 including Zonal (basic) FSI specified in Table No 12 on the gross plot area, abutting a road having minimum width of 12 m, solely for the project of construction of staff quarters (hereinafter referred to as “staff quarters project”) for the employees of the Govt./MCGM, or their statutory bodies (hereinafter collectively referred to as “User Authority”) on land belonging to such User Authority, by the Public Works Department of the GoM or MHADA or Maharashtra Police Housing Corporation or MCGM or its statutory bodies or any other Agency nominated by the Govt. for this purpose which would also include any Special Purpose Vehicle, wherein the Govt. or a fully owned Company of the Govt. holds at least 51% equity share (hereinafter collectively referred to as “Implementing Public Authority”).
Premium shall be applicable for BUA in lieu of additional FSI at the rate of 50% of ASR of developed land (for FSI 1) or as decided by the Government from time to time, except for the development by State Government & MCGM
2.The total permissible FSI under this Regulation shall be utilized for construction of staff quarters for the User Authority subject to the following:
(i) The area of staff quarters/free sale component for various categories of employees shall be as per the norms prescribed by the concerned User Authority.
(ii)(a) Commissioner may also permit up to 1/3rd of the total permissible FSI under this Regulation for construction of free sale area (hereinafter referred to as “free sale component”) to be disposed of by the Implementing Public Authority to recover the cost of project implementation as provided herein.
PART VI ADDITIONAL FLOOR SPACE INDEX
The free sale component shall preferably be constructed in a separate block. Sub-division of plots shall be permissible on the basis of equitable distribution of FSI, in case construction of free sale component is permitted by Commissioner.
(b) If the User Authority requires construction of staff quarters to the extent of full permissible FSI of 4.0, then the User Authority shall pay full cost of construction to the Implementing Public Authority, in lieu of the free sale component.
Conditions:
(1) 5% of total rooms shall be reserved for total 30 days in a year for Govt. /MCGM free of cost (only room charges) & it may be monitored by the MTDC and Protocol Department. The Municipal Commissioner shall intimate MTDC and Protocol Department regarding grant of building permission / occupation certificate to enable MTDC and Protocol Department to comply with these conditions.
(2) Development cess at 7% of the Land Rate as per ASR (for FSI 1) of the year of approval for the BUA beyond Zonal (basic) FSI (excluding fungible compensatory area) shall be paid to MCGM. Development cess shall be in addition to development charges levied as per section 124 of MR&TP Act 1966.
(3) Commercial uses up to 20% of Zonal (basic) FSI, in addition to uses permissible in hotel i.e. banquet hall, conference hall and meeting room etc. shall be permissible.
(4) In respect of star category Hotel, projects classified as Mega/Ultra Mega Project as per Maharashtra Tourism Policy-2016, up to 20% of additional FSI available by charging premium can be used for Tourism support activities on payment premium at the rate decided by Government from time to time for the uses as proposed by Tourism Department from time to time.
(5) All concessions available to star category Hotel are also applicable to Tourism Units classified under Mega Projects, Ultra mega Projects and Large tourism units.
(6) No condonation in parking and other requirements as in these Regulations shall be allowed except in the side and rear Marginal open spaces condonation up to 25% may be granted with the special permission of the Commissioner.
Note (I) Out of the additional FSI beyond Zonal (basic) FSI, 50% may be availed by utilizing TDR (without payment of premium), provided that the utilization of such TDR will be allowed only after availing of the remaining additional FSI.
(II) If mixed user other than 3 above along with star category hotel is proposed subject to fulfillment of road width for such mix use, then no additional FSI will be available at concessional rate. Separate entrances, Parking arrangements, lifts/ Lobbies shall be provided to segregate such mix uses.
33(4) Building of Residential Hotels on independent plot:
Subject to payment of premium for BUA at the rate of 30% of the land rates as per ASR (for FSI 1) or as decided by Govt. from time to time equally to be shared between Govt.& MCGM, and subject to other terms and conditions, the maximum permissible FSI [including Zonal (basic) FSI] shall be as below for all residential hotels on independent plots and satisfies other related provisions of these Regulations and under one establishment.
Sr No
Minimum Road Width
Maximum Permissible FSI
1
12m
Up to 3
2
18m
Up to 4
3
27m
Up to 5
PART VI ADDITIONAL FLOOR SPACE INDEX
On the plot area excluding area to be handed over to MCGM/Appropriate Authority in lieu of Reservation/ Existing amenity in the DP/ proposed DP roads/prescribed RL under MMC Act.
(c) The flats constructed under the free sale component shall be first offered to the Central Govt., its statutory bodies, Central/ State PSUs for purchase as staff quarters and if the Central Govt. or its statutory Bodies or Central/ State PSUs do not indicate willingness to purchase the same within the prescribed time limit, then such flats shall be sold in open market.
3.Development cess at 7% of the Land Rate as per ASR (for FSI 1) of the year of approval for the BUA beyond Zonal (basic) FSI (excluding fungible compensatory area) shall be paid to MCGM. The Development cess shall be in addition to development charges levied as per section 124 of MR&TP Act 1966
4.(i) No premium shall be charged for fungible compensatory area admissible as per DCR 31(3) for construction of staff quarters of MCGM & State Government.
(ii) No premium shall be payable for stair case, lift and lift lobby for the construction of staff quarters of MCGM & State Government.
(iii)Open space deficiency shall be charged at the rate of 2.5% of the land rate of ASR (for FSI 1).
(iv) Provisions of IH shall not be applicable for development under this Regulation.
For any staff quarters project under this Regulation, a Development Agreement shall be executed between the User Authority and Implementing Public Authority authorizing the Implementing Authority to dispose of the flats constructed under the free sale component of the project wherever applicable.
33(3)(B) Development/Redevelopment for construction of staff quarters of Govt. or its statutory bodies (including CISF) or Municipal Corporation of Greater Mumbai or its statutory bodies on private lands.
The Commissioner may permit construction of staff quarters for the employees of Govt. /MCGM/their statutory bodies (hereinafter referred to as “User Authority’’) on private plots of lands, having minimum area of 2000sq.m and abutting a road having minimum width of 12 m and grant incentive FSI, as provided herein below, in lieu of BUA of staff quarters created and handed over free of cost to the User Authority, subject to payment of premium at the rate of 50% of ASR of developed land (for FSI 1) or as decided by the Government from time to time except for the buildings of State Government & MCGM and the following provisions:
(i)The area of staff quarters for various categories of employees shall be as per the norms prescribed by the concerned User Authority and in no case, shall the area of Staff Quarters exceed the maximum limit of carpet area as prescribed therein.
(ii)Incentive FSI shall be admissible against the FSI required for construction of Staff Quarters as per following table: -
PART VI ADDITIONAL FLOOR SPACE INDEX
Table A
Location of project
Incentive (As% of required BUA of staff Quarters)
Island city
40%
Suburbs &Extended Suburbs
80%
(iii) FSI including Zonal (basic)/permissible FSI shall be used on the same plot and as stated in the Table below.
Plot Area
Minimum Road Width
Maximum permissible FSI
2000 sq. m or more but less than 4000 sq. m
12m
3.00
4000 sq. m or more
18m
4.00
(iv)(a) No premium shall be charged for features permitted as per DCR 31 (1) and 31(3), for the construction of staff quarters to be handed over to MCGM/Appropriate Authority.
(b) Open space deficiency shall be charged at 2.5% of the land rate of ASR (for FSI 1).
(c)The provision of IH shall not be applicable for development under this Regulation.
i. Development cess at 7% of the Land Rate as per ASR (for FSI 1) of the year of approval for the BUA beyond Zonal (basic) FSI (excluding fungible compensatory area) shall be paid to MCGM. Development cess shall be in addition to development charges levied as per section 124 of MR&TP Act 1966.
ii. Development/redevelopment of a vacant plot belonging to a private landholder for constructing staff quarters for a user Authority shall be permitted by the Municipal Commissioner with prior approval of the location and requirement of such Staff Quarters by the Committee formed for this purpose by GoM.
iii. In case of flats proposed for conservancy staff quarters under this Regulation, a percentage of flats as decided by GoM shall be available on ownership basis under Shram Saphalya scheme.
33(5) Development/Redevelopment of Housing Schemes of Maharashtra Housing & Area Development Authority (MHADA)
The FSI for a new scheme of Housing, implemented by MHADA on MHADA lands for Economically Weaker Sections (EWS), Low Income Group (LIG) and Middle Income Group (MIG) categories shall be 3.0 on the gross plot area (exclusive of the Fungible Compensatory Area) and at least 60% BUA in such scheme shall be in the form of tenements under the EWS, LIG and MIG categories, as defined by the Government in Housing Department from time to time.
Provided that the Floor Space Indices above may be permitted to be exceeded up to 4.00 FSI in case of plots, having area of 4000 sq. m or above which front on roads having width of 18.00 m or more with prior approval of Govt.
For redevelopment of existing housing schemes of MHADA, containing (i)EWS/LIG and/or(ii)MIG and/or (iii) HIG houses with carpet area less than the maximum carpet area prescribed for MIG, the total permissible FSI shall be 3.0 on the gross plot area (exclusive of the Fungible Compensatory Area).
Provided that the Floor Space Indices above may be permitted to be exceeded up to 4.00 FSI in
PART VI ADDITIONAL FLOOR SPACE INDEX
case of plots, having area of 4000 sq. m or above which front on roads having width of 18.00 m or more.
2.1 Where redevelopment of buildings in existing housing schemes of MHADA is undertaken by the housing co-operative societies or the occupiers of such buildings or by the lessees of MHADA, the Rehabilitation Area Entitlement, Incentive FSI and sharing of balance FSI shall be as follows:-
A) Rehabilitation Area Entitlement:
i) Under redevelopment of buildings in existing Housing Schemes of MHADA, the entitlement of rehabilitation area for an existing residential tenement shall be equal to sum total of
(a) a basic entitlement equivalent to the carpet area of the existing tenement plus 35% thereof, subject to a minimum carpet area of35 sq. m, and
(b) an additional entitlement, governed by the size of the plot under redevelopment, in accordance with the Table-A below: -
Table-A
Area of the Plot under Redevelopment
Additional Carpet Area on the Existing Carpet Area of Tenement
Above 4000 sq. m to 2 ha
15%
Above 2 ha to 5 ha
25%
Above 5 ha to 10 ha
35%
Above 10 ha
45%
Explanation: (a) The plot under redevelopment means land demarcated by MHADA for redevelopment.
(b) For the purpose, “existing Carpet area/carpet area” means the net usable floor area within a tenement excluding that covered by the walls or any other areas specifically exempted from floor space index computation as per then/ prevailing Regulation but including the areas of balcony, if allowed free of FSI as per then Regulation.
B) Incentive FSI: Incentive FSI admissible against the FSI required for rehabilitation, as calculated in (A) above, shall be based on the ratio (hereinafter referred to as Basic Ratio) of Land Rate (LR) in Rs/sq. m. of the plot under redevelopment as per the Annual Schedule of Rates (ASR) and Rate of Construction (RC)* in Rs/sq. m applicable to the area as per the ASR of the date of approval of plan and shall be as given in the Table B below:-
Table B
Basic Ratio (LR/RC)
Incentive (As % of Admissible Rehabilitation Area)
Above 6.00
40%
Above 4.00 and up to 6.00
50%
Above 2.00 and up to 4.00
60%
Up to 2.00
70%
Provided that the above incentive will be subject to the availability of the FSI on the Plot under redevelopment and its distribution by MHADA.
Provided further that in case there are more than one land rate applicable to different parts of the plot under redevelopment, a weighted average of all the applicable rates shall be taken for
PART VI ADDITIONAL FLOOR SPACE INDEX
calculating the Average Land Rate and the Basic Ratio. Provided further that the Land Rate (LR) and the Rate of Construction (RC) for calculation of the Basic Ratio shall be taken for the year in which the redevelopment project is approved by the Competent Authority.
C) Sharing of the Balance FSI:
The FSI remaining in balance after providing for the rehabilitation and the incentive components, calculated as per (A) and (B) above respectively, shall be shared between the Cooperative Housing Society and MHADA in the form of BUA, as given in Table C below and the share of MHADA shall be handed over to MHADA free of cost.
Table C
Basic Ratio (LR/RC)
Sharing of Balance FSI
Cooperative Society Share
MHADA Share
Above 6.00
30%
70%
Above 4.00 and up to 6.00
35%
65%
Above 2.00 and up to 4.00
40%
60%
Up to 2.00
45%
55%
Explanation
* RC is the rate of construction in respect of R.C.C. Construction, as published by the Chief Controlling Revenue Authority & Inspector General of Registration, Maharashtra State in the Annual Schedule of Rates.
Provided that in case of plots up to 4000 sq. m, MHADA without insisting MHADA’s Share in the form of BUA, may allow additional BUA over and above existing BUA up to 3.00 FSI by charging premium at the percentage rate of ASR defined in table C1 below:-
Table C1
LR/RC Ratio
EWS/LIG
MIG
HIG
0 to 2
40%
60%
80%
2 to 4
45%
65%
85%
4 to 6
50%
70%
90%
above 6
55%
75%
95%
Provided further that in case of plots having area of 4000 sq. m or above which front on roads having width of 18.00 m or more, the FSI 1.00 over and above 3.00 shall be permissible in the form of Social Housing stock in the ratio of 1 MHADA: 0.5 Cooperative Society and it shall be handed over to MHADA free of cost &without any compensation.
Provided that at the option of or with the approval of MHADA, the tenements coming to the share of MHADA can also be provided by the Promoter/Developer elsewhere within the same or adjoining Municipal Ward. Provided that the BUA area to be handed over to MHADA shall be as per equivalent value of BUA as per the market value (as per ASR of that year)
2.2 Where redevelopment of buildings in the existing Housing Schemes of MHADA is undertaken by MHADA or jointly by MHADA along with the housing societies or along with the occupiers of
PART VI ADDITIONAL FLOOR SPACE INDEX
such building or along with the lessees of MHADA, the Rehabilitation Area Entitlement, shall be as follows:
Rehabilitation Area Entitlement:
The Rehabilitation Area Entitlement shall be increased by 15% of the existing carpet area, over and above the Rehabilitation Area Entitlement calculated in (A) of 2.1 above.
Note: Fungible compensatory area as applicable on the surplus area to be handed over to MHADA shall not be allowed to be utilized on sale component. No premium shall be charged on the fungible compensatory area, in respect of area to be handed over to MHADA and surplus area to be handed over to MHADA shall be exclusive of the Fungible compensatory BUA if availed
For the purpose of calculating the FSI, the entire area of the layout including Development Plan roads and internal roads but excluding the land under the reservation of public amenities shall be considered. Sub-division of plots shall be permissible on the basis of the compulsory open spaces as in these Regulations.
The reservations in the MHADA layout may be developed as per the provisions of Regulation No. 17(3).
Provided that there shall be no restriction on the utilization of the FSI permissible under this Regulation except for the restrictions under any law, rule or regulation.
For the purpose of this Regulation, the carpet areas for EWS, LIG or MIG tenements shall be as determined by the Government from time to time.
a) For providing the requisite infrastructure for the increased population, Development Cess at the rate of 7% of the Land Rate as per the ASR of the year of approval of the redevelopment project shall be chargeable for the extra FSI (excluding the fungible compensatory area) granted over and above the normal FSI for the redevelopment schemes. 5/7th part of the Development Cess levied and collected by MHADA shall be transferred to the Municipal Corporation of Greater Mumbai for developing necessary offsite infrastructure. Development cess shall be in addition to development charges levied as per section 124 of MR&TP Act 1966.
b) No premium shall be charged under Regulation No 31(1) and 31(3) (for the fungible compensatory area) for
(i) Construction of EWS/LIG and MIG tenements by MHADA on a MHADA plot or
(ii) in a redevelopment project for the construction of EWS/LIG and MIG tenements towards the share of MHADA, or
Notwithstanding anything contained in these Regulations, the other relaxation incorporated in Regulation No. 33(10) of these Regulations except clause 6.11, 6.15, 6.16 & 6.18 shall apply. The payment of premium at the rate of 25% of normal premium or at the rate of 6.25% of the land rates as per ASR (for FSI 1), whichever is more shall apply to the Housing Schemes under this Regulation for construction of tenements under EWS/LIG/MIG categories. However, the front open space shall not be less than 3.0 m.
a) In any Redevelopment Scheme where the Registered Co-operative Housing Society/Developer appointed by the Registered Co-operative Housing Society/ Federation/ Association/ Union has obtained NOC from the MHADA/Mumbai Board, thereby sanctioning additional balance FSI with the consent of 51% of its members and where such NOC holder has made provision for alternative permanent accommodation in the proposed building (including transit accommodation/Rent Compensation), then it shall be obligatory for all the
PART VI ADDITIONAL FLOOR SPACE INDEX
occupiers/members to participate in the Redevelopment Scheme and vacate the existing tenements for the purpose of redevelopment. In case of failure to vacate the existing tenements, the provisions of section 95 A of the MHAD Act. Mutatis mutandis shall apply for the purpose of getting the tenements vacated from the non-co-operative members.
b) For redevelopment of buildings in any existing Housing Scheme of MHADA under clause2.2 hereinabove, by MHADA, the consent of the Cooperative Housing Society in the form of a valid Resolution as per the Co-operative Societies Act, 1960 will be sufficient. In respect of members not co-operating as per approval of the redevelopment project, action under section 95(A) of the Maharashtra Housing and Area Development Act, 1976 may be taken by MHADA.
A corpus fund, as may be decided by MHADA, shall be created by the Developer which shall remain with the Co-operative Housing Societies for the maintenance of the new buildings under the Rehabilitation Component.
9)Convenience Shopping shall be permitted along layout roads with 9m to 18m width.
10(a) In case of layout of MHADA where development is proposed under this Regulation and where such land is observed to be partially occupied by slum, under section 4 of Slum Act existing prior to 1.1.2000 or such other reference date notified by the Govt., then for integrated development of the entire layout area and in order to promote flexibility, MHADA may propose development, including area occupied by the slum, under this regulation.
(b) (i) Each eligible residential or residential cum commercial slum dweller shall be entitled to a tenement of carpet area of 27.88 sq. m (300 sq. ft.) and
(ii)Existing or 20.90 sq. m whichever is less in case of non-residential
(c) If such land occupied by slum is observed to be affected by reservation then the development of reservation on land occupied by slum shall be regulated by the Regulation No 17(3)(C)
(d) Corpus fund: An amount of Rs.40000 or as may be decided by SRA as per Regulation No 33(10) shall be deposited with MHADA Authority for each eligible slum dwellers.
33(6) Reconstruction of buildings destroyed by fire or which have collapsed or which have been demolished under lawful order
Reconstruction of buildings that existed on or after 10th June 1977 and have ceased to exist for reasons cited above, shall be allowed to be reconstructed with FSI as per the Regulation No 30(C).
Provided that if the area covered under staircase/lift has not been claimed free of FSI as per then prevailing Regulation as per the occupation plan, the area covered under staircases/ lifts shall be considered while arriving protected BUA in such cases the premium for entire staircase lift area in the proposed building as per these Regulations shall be recovered.
This FSI will be subject to the following conditions: -
Reconstruction of the new building on the plot should conform to provisions of DP and these Regulations.
Reconstruction will be subject to an agreement executed by at least 70 per cent of the landlord and occupants each in the original building, within the meaning of the Mumbai Rents, Hotel and Lodging House Rates Control Act, 1947, and such agreement shall make a provision for accommodation and re-accommodate the said landlord/all occupants in the new building on agreed terms and a certificate from a practicing advocate having minimum of 10 years experience, is submitted confirming that on the date of application, reconstruction, agreements are executed by at least 70% of the landlords and occupants each in the original building with
PART VI ADDITIONAL FLOOR SPACE INDEX
the developer/owner. The Advocate shall also certify that the agreements with occupants are valid and subsisting on the date of application.
The Carpet area of residential/non-residential premises may be altered with the consent of occupants.
Reconstruction shall be disallowed on set-back areas or areas required for road-widening and such areas shall be handed over to the Corporation.
These provisions shall not apply to buildings wholly occupied by warehouses and godowns.
If the building is reconstructed with existing FSI/BUA prior to its collapse/demolition, then the requirements of front & marginal open spaces shall be as per the Regulation No.41(5) of these Regulations.
Notwithstanding anything contained in these Regulations, the other relaxation incorporated in Regulation No. 33(10) of these Regulations except clause 6.11, 6.15, 6.16 &6.18 shall apply. The payment of premium at the rate of 25% of normal premium or at the rate of 6.25% of the land rates as per ASR (for FSI 1), whichever is more shall apply.
If the existing FSI is less than the permissible FSI then the owner may opt for development upto permissible FSI by availing TDR/Additional FSI on payment of premium as per Regulation 30.
If the building is reconstructed by using Zonal (basic) FSI/permissible FSI, the following shall apply:
a) Requirements of open spaces shall be as per Regulation nos. 41(1) and 41(2) & 43
b) Premium as applicable for area covered under Regulation No. 31(1) & 31(3) beyond the existing FSI/BUA shall be paid.
Provision of Inclusive Housing as per Regulation No.15 shall have to be made in case of 9 above, if applicable.
33(7) Reconstruction or redevelopment of cessed buildings in the Island City by Co-operative Housing Societies or of old buildings belonging to the Corporation:
(1) For reconstruction/redevelopment to be undertaken by same or different landlords or Co-operative societies of landlords and Cooperative Housing Societies (existing or proposed) of existing tenants or by Co-op. Housing Societies of landlords and/or occupiers of a cessed building existing prior to 30/9/1969 in Island City, which attracts the provisions of MHAD Act, 1976 and for reconstruction/redevelopment of the buildings of Corporation existing prior to 30.09.1969, FSI shall be 3.00 on the gross plot area or FSI required for rehabilitation of existing tenants plus incentive FSI as specified in sr. no 5(a) below whichever is more.
Provided further that reconstruction/redevelopment undertaken by proposed Co-operative Housing Society of occupiers of buildings existing prior to 30.09.1969, which were earlier cessed buildings and were attracting the provisions of MHAD Act, 1976 but thereafter due to purchase/acquisition of the same by Co-operative Housing Society of Occupiers, such buildings are exempted from payment of cess, the FSI required for rehabilitation of existing occupier plus incentive FSI as specified in Sr. no 5(c)below will be available.
(a) The new building may be permitted to be constructed in pursuance of an irrevocable written consent by not less than 51% of the occupiers of the old building.
PART VI ADDITIONAL FLOOR SPACE INDEX
(b) All the eligible occupants of cessed and non-cessed building/structures (existing prior to 30.09.1969) certified by MBRRB, existing on the plot having cessed building only, shall be reaccommodated in the redeveloped building.
Each occupant shall be rehabilitated and given the carpet area occupied by him for residential purpose in the old building subject to the minimum fixed carpet area of 27.88 sq. m (300 sq. ft.) and/or maximum carpet area up to 120 sq. m (1292sq. ft.) as provided in the MHAD Act, 1976. In case of non-residential occupier, the area to be given in the reconstructed building will be equivalent to the area occupied in the old building. Provided that if carpet area for residential purpose exceeds 120 sq. m (1292sq. ft.) the cost of construction for the area over and above 120sq. m shall be paid by tenant /occupant to the developer. The cost of construction shall be as per ASR of that year. However, the carpet area exceeding 120sq. m (1292sq. ft.) shall be considered for rehab FSI but shall not be considered for incentive FSI. Provided further that each eligible residential cum commercial occupant shall be entitled to a tenement of minimum carpet area of 27.88 sq. m (300 sq. ft.).
For purpose of rehabilitation existing "Carpet area"/rehabilitation “carpet area” means the net usable floor area within a tenement excluding that covered by the walls or any other areas specifically exempted from floor space index computation as per then prevailing Regulation but including the areas of balcony if allowed free of FSI as per then Regulation.
3 . The list of eligible occupants and area occupied by each of them of cessed and non-cessed building/structures (existing prior to 30.09.1969) shall be certified by the Mumbai Repairs and Reconstruction Board and the irrevocable written consent as specified in 1 (a) above shall be verified by the Board.
Tenements in the reconstructed building shall be allotted by the landlord/occupants' co-operative housing society to the occupiers as per the list certified by the Mumbai Repairs and Reconstruction Board. The prescribed percentage of the surplus BUA as provided in the Table in the Third Schedule of the MHAD Act, 1976, shall be made available to the Mumbai Repairs and Reconstruction Board for accommodating the occupants in transit camps or cessed buildings which cannot be reconstructed, on payment of an amount as may be prescribed under MHAD Act, 1976.
Further in case of reconstruction/redevelopment of the buildings of Corporation existing prior to 30.09.1969 as per this Regulation, the BUA beyond area required for re-accommodation of existing occupants and incentive thereon of such rehab area if any shall have to be shared between MCGM and Society of occupants in the ratio of 1(MCGM): 0.5(Society of occupants) or compensation for MCGM share shall be paid to MCGM, as per policy of Municipal corporation.
Fungible Compensatory Area as applicable on the surplus area to be handed over to MHADA/MCGM shall not be allowed to be utilized on sale component. No premium shall be charged on the fungible compensatory area in respect of area to be handed over to MHADA/MCGM and surplus area to be handed over to MHADA/MCGM shall be exclusive of the Fungible compensatory BUA if availed.
Provided that the area equivalent to the market value (as per ASR of that year) of area admissible as per the prescribed percentage of BUA to MHADA can be made available within the same or adjoining municipal ward of MCGM.
The FSI for rehabilitation of existing tenants/occupiers in a reconstructed building and incentive FSI that will be available shall be as under:
(a) In the case of redevelopment of cessed building existing prior to 30/9/1969 undertaken by landlord or Co-operative societies of landlord and Co-operative Housing Societies of landlord/occupiers, the total FSI shall be 3.00 of the gross plot area or the FSI required for
PART VI ADDITIONAL FLOOR SPACE INDEX
rehabilitation of existing occupiers plus 50% incentive FSI whichever is more and the occupier shall be eligible for 5% additional rehab Carpet Area as per serial no 2 subject to maximum limit.
(b) In case of composite redevelopment undertaken by landlord or Co-operative societies of landlords and Co-operative Housing Societies of landlord/occupiers jointly of 2 or more plots but not more than 5 plots with cessed buildings existing prior to 30/9/1969, the FSI permissible will be 3.00 or FSI required for rehabilitation to exiting occupiers plus 60% incentive FSI, whichever is more and the occupier shall be eligible for 8% additional rehab Carpet Area as per serial no 2 above subject to maximum limit.
Provided further, that if the number of plots jointly undertaken for redevelopment of six or more with cessed buildings existing prior to 30/9/1969 or in case of redevelopment of municipal properties under this regulation having eligible tenements density more than 650/ ha, FSI available will be 3.00 or FSI required of rehabilitation for occupiers plus 70% incentive FSI whichever is more and the occupier shall be eligible for 15% additional rehab Carpet Area as per serial no 2 above subject to maximum limit.
Provided further that, the above provision 5(b) shall also be applicable to municipal plots under redevelopment under this Regulation having different residential societies on different plots.
Note- Notwithstanding anything contained in this regulation, in case of redevelopment scheme where permissible FSI is 3.0, then the permissible FSI shall be allowed to be exceeded by BUA required for 5%, 8%, 15% additional rehab carpet area provided as per clause a) & b) above, as the case may be.
(c) Provided further that reconstruction/redevelopment undertaken by proposed Cooperative Housing Society of occupiers of buildings existing prior to 30/9/1969 in Island City, which were earlier cessed building and were attracting the provisions of MHAD Act, 1976 but thereafter due to purchase/acquisition of the same by Cooperative Housing Society of Occupiers, such buildings are exempted from payment of cess, the total FSI shall be 2.5 of the gross plot area or the FSI required for rehabilitation of existing occupiers plus 50% incentive FSI whichever is more.
The entire FSI available under clause 5 shall be allowed to be utilised on plot/plots under redevelopment scheme. However, if the owner/society so desire, they can avail the incentive FSI on the same plot or can avail the benefit of TDRs to be used in accordance with the Regulations no. 32.
Construction or reconstruction of old cessed building falling under reservation/zones contemplated in the DP shall be permitted as specified in Regulation No.17(3)(B).
Contravening structures in TP Scheme and structures on the road shall also be included in the redevelopment scheme. FSI for the same will be as under DCR 33(12) or as provided in these Regulations whichever is more.
Relaxation in building and other requirements for rehabilitation: Notwithstanding anything contained in these Regulations, the relaxations incorporated in sub Regulation No.6 of Regulation No. 33 (10) of these Regulations except clause 6.11, 6.16 & 6.18 shall apply. The payment of premium at the rate of 10% of normal premium or at the rate of 2.5% of the land rates as per ASR (for FSI 1), whichever is more shall apply.
Even if the amenity open space (LOS) is reduced to make the project viable a minimum of at least 10% of open space shall be maintained.
20% of the incentive FSI can be used for non-residential purposes otherwise permissible in the DCPR.
PART VI ADDITIONAL FLOOR SPACE INDEX
10. Deleted
FSI under these Regulations should be allowed by the Commissioner only after Mumbai Repairs and Reconstruction Board is satisfied that the said redevelopment proposal fulfills all conditions to be eligible for the benefits under these regulations.
In case of the redevelopment of cessed buildings, the concessions regarding exclusion of areas from computation of FSI for general buildings stipulated in Regulation No. 31(1) shall apply.
Since the permissible FSI in clause 5 above is dependent upon the number of occupiers and the actual area occupied by them, no new tenancy created after 13.6.1996 shall be considered. Further unauthorized constructions made in the cessed buildings shall not be considered while computation of existing FSI.
For smooth implementation of the redevelopment scheme undertaken by owners and/or Co-operative Housing Society of the occupiers, temporary transit camps may be permitted on the same land or land situated elsewhere belonging to the same owner/developer with the concessions permissible under SRS project under Regulations 33(10) of these Regulations. Such transit camps should be demolished within one month from the date of occupation certificate granted by the Corporation for the reconstructed buildings for the existing tenants/occupants.
15.Additional development cess equivalent to 100% of Development charges on BUA (excluding the fungible compensatory area/BUA), or Rs5,000 per sq. m whichever is more for BUA over and above the existing BUA shall be paid by the owner/developer/society, for the rehabilitation and free sale components. This amount shall be paid to the Corporation in accordance with the time schedule for such payment as may be laid down by the Commissioner, MCGM provided the payment of installments shall not go beyond the completion of construction. This amount shall be used for Scheme to be prepared for the improvement of off-site infrastructure in the area around the development. Development cess shall be in addition to development charges levied as per section 124 of MR&TP Act 1966.
16.As per the provision of clause 2 above, each residential/non-residential occupant shall be rehabilitated only for carpet area mentioned in the said clause No.2 above and such areas shall be clearly shown on the building plan submitted to the Corporation/MHADA.
A corpus fund shall be created as prescribed by MHADA.
Restriction on transfer of tenements shall be governed by provision of Rent Control Act till Co.Op. Society is formed and after that the same shall be governed by the provision of Maharashtra Co-op. Society’s Act.
Non-Deduction of non-cessed Structure area in the scheme of 33(7) for FSI purpose: In case of mix of the structure i.e. cessed & non cessed structure and if the area of non cessed structure existing prior to 30/9/69, area of land component under non-cessed structure works out up to a limit of 25% of plot area, then FSI shall be considered on total plot area. If this area exceeds 25% of the total area, then area above 25% shall be deducted from plot area. FSI for deducted area shall be as per Regulation No 30 and the FSI for the remaining plot area shall be as per 33(7). Provision of clause no 2 above shall be made applicable to non-cessed occupier.
Provided that the 25% land component of non-cessed structures will be eligible for FSI as per Regulation 33(7) only.
(a) In case of layout of MCGM owned plots/ Municipal plot where development is proposed under this Regulation and where such land is observed to be partially occupied by slum, under section 4 of Slum Act existing prior to 1.1.2000 or such other reference date notified by the Govt., then for
PART VI ADDITIONAL FLOOR SPACE INDEX
integrated development of the entire layout area and in order to promote flexibility, MCGM may propose development, including area occupied by the slum, under this regulation.
MCGM shall be the Planning Authority for the areas declared as slum under section 4 of Maharashtra Slum Area (Improvement) Act, 1971 on Municipal land existing prior to 01.01.2000 or date as notified by Govt. In case where slum area do not constitute more than 50% of the plot area under redevelopment, in such cases the Planning Authority shall be as decided by Municipal Commissioner.
(b) (i) Each eligible residential or residential cum commercial slum dweller shall be entitled to a tenement of carpet area of 27.88 sq. m ( 300 sq. ft.) and
(ii)Existing or max 20.90 sq. m whichever is less in case of non-residential.
(c) If such land occupied by slum is observed to be affected by reservation then the development of reservation on land occupied by slum shall be regulated by the Regulation No 17(3)(D)
(d) Corpus fund: An amount of Rs.40000 or as may be decided by SRA as per Regulation No 33(10) shall be deposited with MCGM for each eligible slum dwellers
Notwithstanding anything contained in these Regulations existing 9m. width of road shall be essential for any height of building above 32 m. height.
33(7)(A) Reconstruction or redevelopment of dilapidated/unsafe existing authorized tenant occupied building in Suburbs and extended Suburbs and existing authorized non-cessed tenant occupied buildings in Mumbai City.
For reconstruction/redevelopment of existing authorized tenant-occupied buildings, which have been declared unsafe for human habitation by or are to be demolished for the same reason under a lawful order by the Municipal Corporation of Greater Mumbai and duly certified as such, undertaken by landlord/s or Co-operative Housing Societies of existing tenants, the permissible FSI prescribed under these regulations and Appendix below, shall be admissible as under: -
a) In case of the plot consisting of only tenant occupied building, the F.S.I. shall be equal to F.S.I. required for rehabilitation of existing lawful tenant plus 50% incentive F.S.I. and the occupier shall be eligible for 5% additional rehab carpet area.
b) In case of composite development i.e. the plot consisting of tenant occupied building along with non-tenanted building such as owner occupied building/existing Co-op Housing Society buildings etc., the FSI available shall be equal to FSI required for rehabilitation of existing lawful tenant plus 50% incentive FSI plus FSI that has already authorisedly been utilized/consumed by the non-tenanted buildings/structures.
Provided further that in case of composite redevelopment undertaken as mention in (a) & (b) above for two or more but not more than five plots of tenant occupied buildings the incentive FSI shall be 60% & the occupier shall be eligible for 8% additional rehab carpet area and for plots six or more then incentive shall be 70% and the occupier shall be eligible for 15 % additional rehab carpet area.