2. Rain Water Harvesting in a Building Site.
Includes storage or recharging into ground the rain water falling on the terrace or on any paved or unpaved surface within the building site.
2.1 The following systems may be adopted for harvesting the rain water drawn from terrace and the paved surface.
2.1.1 Open well of a minimum of 1.00 mdia and 6 m in depth into which rain water may be channeled and allowed after filtration for removing silt and floating material. The well shall be provided with ventilating covers. The water from the open well may be used for non-potable domestic purposes such as washing, flushing and for watering the garden etc.
2.1.2 Rain Water Harvesting for recharge of ground water may be done through a bore well around which a pit may be excavated up to a depth of atleast 3.0 m and refilled with stone aggregate and sand. The filtered rain water may be channeled to the refilled pit for recharging the bore well.
2.1.3 An impervious surface / underground storage tank of required capacity may be constructed in the setback or other open space and the rain water may be channeled to the storage tank. The storage tank shall suitably placed so that the rain water may be drawn off for domestic, washing gardening and such other purposes. The storage tanks shall be provided with an overflow.
2.1.4 The surplus rain water after storage may be recharged into ground through percolation pits or trenches or combination of pits and trenches. Depending on the geographical and topographical condition, the pits may be of the size of 1.20 mt. width x 1.20mt length x 2.00 mt. to 2.50 mt. depth. The tranches can be or 0.60 mt width x 2.00 to 6.00 mt. length x 1.50 to 2.00 mt. depth. The capacity/ volume and number of pits and trenched should depend upon the catchment area and quantity of peak rain fall of the area. It can vary from place to place. Terrace water shall be channelled to pits or trenches. Such pits or trenches shall be back filled with filter media comprising the following materials.
2.1.4.1 40 mm stone aggregate as bottom layer upto 25% of the depth;
2.1.4.2 20 mm stone aggregate as lower middle layer upto 25% of the depth;
2.1.4.3 Coarse sand as upper middle layer upto 40% of the depth;
2.1.4.4 A thin layer of fine sand as top layer.
2.1.5 Top 10% of the pits / trenched will be empty and a splash is to be provided in this portion in such a way that roof top water falls on the splash pad.
2.1.6 Brick masonry wall is to be constructed on the exposed surface of pits / trenches and the cement mortar plastered.
Annexure E
Annexure & Appendices
2.1.7 The depth of wall below ground shall be such that the wall prevents lose soil entering into pits / trenched. The projection of the wall above ground shall at least be 15 cms.
2.1.8 Perforated concrete slabs shall be provided on the pits / trenches. Bund should be created to minimize the run off.
2.1.9 If the open space surrounding the building is not paved, the top layer upto a sufficient depth shall be removed and refilled with coarse sand to allow percolation of rain water into ground.
2.1.10 Any other system developed, which is technically suitable and feasible under the local circumstances and conditions, which may vary from place to place.
2.2 In case the plots where the water table is high i.e 10 feet or less, it is not mandatory to follow the above provisions.
2.2.1 The terrace shall be connected to the open well / borewell / storage tank / recharge pit / trench by means of PVC pipes though filter media. A valve system shall be provided to enable the first washings from roof or terrace catchment, as they would contain undesirable dirt. The mouths of all pipes and opening shall be covered with mosquito (insect) proof wire net. For the efficient discharge of rain water, there shall be at least two rain water of 100 mm diameter for a roof area of 100 sq.m.
2.2.2 Rain water harvesting structures shall be installed as not to endanger the stability of building or earthwork. The structure shall be designed such that no dampness is caused in any part of the walls or foundation of the building or those of an adjacent building.
2.2.3 The water so collected / recharged shall as far as possible be used for non-drinking and non-cooking purpose.
2.2.4 Provided that when the rain water in exceptional circumstances will be utilized for drinking and / or cooking purpose, it shall be ensured that proper filter arrangement and the separate outlet outlet for by passing the first rain-water has been provided.
2.2.5 Provided further that it will be ensured that for such use, proper disinfectants and the water purification arrangements have been made.