15.1 Introduction
Land, Air, Noise, Water, Energy, biological/ socio-economic/ solid / other waste management are the main facets considered in relation to Pre, During and Post Building Construction for Sustainable Environment Management. Therefore, it is necessary for the building process to ensure compliance to various conditions laid down by the Ministry of Environment, Forest and Climate Change.
15.2 Definitions
1. Additions and/or Alterations
Means any change in existing authorized building or change from one use to another use, or a structural change such as additions to the area or height, or the removal of part of a building, or a change to the structure such as the construction or cutting into or removal of any structural wall or part of a structural wall, column, beam, joist, floor including a mezzanine floor or other support. The addition to any existing structure shall only be permitted if it complies with the provisions of these Bye-laws.
2. Building
Means all types of permanent building defined below, but structure of temporary nature like tents, hutment as well as shamianas erected for temporary purposes for ceremonial occasions, with the permission of the Competent Authority, shall not be considered to be “buildings”. Definition of building shall also include “Unsafe Building” means a building which,
- Is structurally unsafe,
- Is insanitary,
- Is not provided with adequate means of egress,
- Constitutes a fire hazard,
In relation to its existing use constitutes a hazard to safety or health or
- Public welfare by reasons of inadequate maintenance, dilapidation or abandonment.
3 Natural Hazard means 3. Natural Hazard means
The probability of occurrence, within a specific period of time in a given area, of a potentially damaging natural phenomenon.
4. Natural Hazard Prone Area means
Areas likely to have moderate to high intensity of earthquake, or cyclonic storm, or significant flood flow or inundation, or landslides/mud flows/avalanches, or liquefaction or one or more of these hazards.
Note: Moderate to very high damage risk zones of cyclones are those areas along the sea coast of India prone to having wind velocities of 39 m/s or more as specified in IS:875 (Part 3;) and flood prone areas in river plains (unprotected and protected) are indicated in Commission, besides, other areas can be flooded under conditions of heavy intensity rains, inundation in depressions, back flow in drains, inadequate drainage, etc. as identified through local surveys in the development plan of the area and landslide prone areas as identified by State Government/Land Surveys.
1. Lifeline Building mean
Those buildings which are of post-earthquake importance such as hospital building, power house building, telephone exchange building and the like.
Department of Town Planning & ULBs, Govt. of Arunachal Pradesh|| Arunachal Pradesh Building Byelaws 2019
Chapter 15
Additional Provisions in Development Control Regulations for Safety in natural Hazard Prone Areas
2. Special Building mean
Those buildings housing large gathering at a time such as cinemas, theatres, meeting halls, assembly halls, lecture halls, town halls and the like.
3. Retrofitting
Means upgrading the strength of an unsafe building by using suitable engineering techniques.
4. Quality Control means
Related to construction quality and to control of variation in the material properties and structuraladequacy. In case of concrete, it is the control of accuracy of all operations which affect the consistency and strength of concrete, batching mixing, transporting, placing, curing and testing.
5. Quality Audit means
Third party quality audit for an independent assessment of the quality and seismic or cyclone resistant features of all the high-rise buildings in earthquake zone IV and V and coastal areas of the country. The quality audit report shall consist of conformance or non-conformance of structures with the technical specifications for earthquake and cyclone resistance and to suggest remedies/rectification if any.
6. Quality Assurance means
All planned and systematic actions necessary to ensure that the final product i.e. structure or structural elements will perform satisfactorily in service life.
7. Compliance means
The verification of the properties of construction materials based on test data and verification of the strength and structural adequacy for various components of buildings and structures meets with the required standard.
8. Non-Structural Component means
Those components of buildings which do not contribute to the structural stability such as infill walls in RCC, framed buildings, glass panes, claddings, parapet walls, chimneys etc.
15.3 General Requirements for Development
15.3.1 Requirements of Site
(i) No earthquake prone or cyclonic zone land shall be used as a site for the construction of building, if the site is found to be liable to liquefaction by the Competent Authority under the earthquake intensity of the area, except where appropriate protection measures are taken.
(ii) If the Competent Authority finds that the proposed development falls in the area liable to storm surge during cyclone, except where protection measures are adopted to prevent storm surge damage.
15.3.2 Requirements of Site Plan
(i) In hilly terrain, the site plan should include location of land slide prone areas, if any, on or near the site, detected during reconnaissance. The Authority in such case shall cause to ensure that the site is away from such land slide prone areas.
(ii) If the Competent Authority finds that the proposed development falls in the area liable to storm surge during cyclone, except where protection measures are adopted to prevent storm surge damage.
15.4 Decision of the Authority
15.4.1 Grant or Refusal of the Permission for Development
On receipt of the application for Development Permission, the Competent Authority after making such inquiry and clearance from such an expert whenever considered necessary for the safety of building, as it thinks fit may communicate its decisions granting with or without condition including condition of submission of detailed working drawing/structural drawing along with soil investigation report before the commencement of the work or refusing permission to the applicant as per the provisions of the Bye-laws. On receipt of the application for Development Permission, the Competent Authority after making such inquiry as he thinks fit may
Department of Town Planning & ULBs, Govt. of Arunachal Pradesh] Arunachal Pradesh Building Byelaws 2019|
Chapter 15
Additional Provisions in Development Control Regulations for Safety in natural Hazard Prone Areas
communicate its decisions granting or refusing permission to the applicant as per the provisions of the Byelaws. The permission may be granted with or without conditions or subject to any general or special orders made by the State Government in this behalf.
The Development permission shall be in No. Form 1 and it should be issued by an officer authorized by the competent Authority in this behalf. Every order granting permission subject to conditions or refusing permission shall state the grounds for imposing such conditions or for such refusal.
15.4.2 Exception for Small Building
The Competent Authority, however, may consider to grant exemption for submission of working drawing, structural drawing and soil investigation report in case the Competent Authority is satisfied that in the area where the proposed construction is to be taken, similar types of structure and soil investigation reports are already available on record and such request is from an individual owner/developer, having lot of not more than 500 sqm in size and for a maximum 3 storied residential building.
If the local site conditions do not require any soil testing or if a soil testing indicates that no special structural design is required, a small building having up to ground +2 floors, having load bearing structure, may be constructed.
If the proposed small house is to be constructed with load bearing type masonry construction technique, where no structural design is involved, no certificate from a Structural Engineer or Record will be required (to be attached with Appendix “A-2” However, a Structural Design Basis Report Appendix “A-16” has to be submitted, duly filled in.
15.4.3 Suspension of Permission
Development permission granted under the relevant section of the Bye-laws shall deemed to be suspended in cases of resignation by any professional namely Architect on Record/ Engineer on Record, Structural Engineer on Record, and Construction Engineer on Record, till the new appointments are made. During this period construction shall not be carried out at the site. Any work at site during this time shall be treated as unauthorized development without any due permission.