Green Building Certification shall evaluate the environmental performance of a building holistically over its entire life cycle, thereby providing a definitive standard of a building that is environmentally friendly and to optimize the conservation and utilisation of resources land, water, natural habitat and energy.
Construction of Green Buildings may be guided by the provisions of part-II of NBC 2016 and/or ECBC 2017 for commercial buildings and Eco-Niwas Samhita 2018 for residential buildings.
A building shall be rated based on criteria prescribed. Applicant shall apply for eligibility for certification with detail plan of action for fulfilment of each criterion to the authorized agency certifying the star rating. The authorized agency may also follow their own criteria for star rating of these buildings.
(a) Criterions for Certification
Criteria 1: Preserve and protect the landscape during construction / compensatory depository forestation.
Objective: Proper timing of construction, preserve top soil and existing vegetation, staging and spill prevention, and erosion and sedimentation control. Replant, onsite, trees in the ratio 1:5 to those removed during construction.
Criteria 2: Reduce hard paving on-site and /or provide shaded hard- paved surfaces.
Objective: Minimize storm water run-off from site by reducing hard paving on site.
Criteria 3: Enhance outdoor lighting system efficiency.
Objective: Meet minimum allowable luminous efficacy (as per lamp type) and make progressive use of solar lighting system.
Criteria 4: Reduce landscape water requirement.
Objective: Landscape using native species and reduce lawn areas while enhancing the irrigation efficiency, reduction in water requirement for landscaping purposes managing slope and water retention.
Criterion 5: Reduce building water use.
Objective Reduce building water use by applying auto-stop fixtures etc.
Criterion 6: Optimise building design to reduce the conventional energy demand.
Objective: Plan appropriately to reflect climate responsiveness, adopt an adequate comfort range, less air-conditioned areas, day-lighting, avoid overdesign of the lighting and air- conditioning systems.
Criterion 7: Reduce volume, weight, and time of construction by adopting an efficient technology (eg. pre-cast systems, ready-mix concrete, etc.).
Objective: Replace a part of the energy-intensive materials with less energy intensive materials and/or utilize regionally available materials and lightweight materials in (internal partitions, panelling /false ceiling/interior wood finishes/ in-built furniture door/window frames, flooring etc.).
Criterion 8: Renewable energy utilization.
Objective: Provide solar energy system equivalent to at least 20% of connected load. Energy requirements will be calculated based on realistic assumptions which will be subject to verification during appraisal.
Criterion 9: Water recycle, reuse and rainwater harvesting.
Objective: Provide wastewater treatment on-site for achieving prescribed concentration, rainwater harvesting, reuse of treated waste water and rainwater for meeting the building's water and irrigation demand.
Criterion 10: Waste management.
Objective: Ensure maximum resource recovery and safe disposal of wastes generated during construction and reduce the burden on landfill. Use different coloured bins for collecting different categories of waste from the building. Allocate separate space for the collected waste before transferring it to the recycling/disposal stations, resource recovery systems for biodegradable waste as per the Solid Waste Management and handling Rules, 2016 of the MoEF.
Criterion 11: Ensure water quality.
Objective: Ensure groundwater or the source of water meet the water quality norms as prescribed in the Indian Standards for various applications (Indian Standards for drinking [IS 10500-1991], irrigation applications [IS 11624-1986]. In case the water quality cannot be ensured, provide necessary treatment of raw water for achieving the desired concentration for various applications.
Criterion 12: Acceptable outdoor and indoor noise levels.
Objective: Ensure outdoor noise level conforms to the Central Pollution Control Board Environmental Standards-Noise (ambient standards) and indoor noise level conforms to the National Building Code of India, 2005, Bureau of Indian Standards, Part 8-Building Services: Section 4-Acoustics, sound insulation, and noise control.
Criterion 13: Universal accessibility
Objective: To ensure accessibility and usability of the building and its facilities by employees, visitors and clients with disabilities.
Criterion 14: Operation and maintenance protocol for electrical and mechanical equipment.
Objective: Ensure the inclusion of specific clauses in the contract document for the commissioning of all electrical and mechanical systems to be maintained by the owner, supplier, or operator. Provide a core facility/service management group. If applicable, which will be responsible for the operation and maintenance of the building and the electrical and mechanical systems after the commissioning. Owner/ builder/ occupants/ service or facility management group to prepare a fully documented operations and maintenance manual, CD, multimedia or an information brochure listing the best practices/ do's and don'ts/ maintenance requirements for the building and the electrical and mechanical systems along with the names and addresses of the manufacturers/suppliers of the respective system.
Criterion 15: Innovation points.
One innovation points are available under the rating system for adopting criteria which enhance the green intent of a project, and the applicant can apply for this bonus point.
(B) Procedure of Certification
Each criterion has 6 (six) number of points assigned to it. It means that a project intending to meet the criterion would qualify for the points. Compliances, as specified in the relevant criterion, have to be submitted before Authority with a detail plan of action. The points related to these criteria are awarded provisionally while certifying and are converted to firm points through monitoring, validation, and documents/photographs to support the award of point. Evaluation shall be done by an expert committee constituted for the purpose by the Authority. Examination of plan of action, monitoring during the construction stage and post construction period shall be done by an Engineer dedicated for the purpose. Report of such findings shall be submitted before the Expert committee for evaluation, rating and certification. Standards shall conform to relevant BIS code and standards as prescribed. There will be in total 100 point for 15 (fifteen) criterions, 6 (six) points each for 14 criterions and 16 (sixteen) points for the innovation points. Different levels of certification (one star to five star) are awarded based on the number of points earned. The minimum points required for certification is 50. Buildings scoring 50 to 60 points, 61 to 70 points, 71 to 80 points, and 81 to 90 points shall get one star, two stars', 'three stars' and 'four stars respectively. A building scoring 91 to 100 points will get the maximum rating viz. five stars.
The building having qualified under the star rating will get Certificate of Star rating. The building qualified under star rating may shall apply before building permit issuing Authority for property tax rebate.