91. Electric Vehicle Charging Infrastructure
Charging infrastructure (CI) shall be provided in the premises of the various building types for Electric Vehicles (EVs) for at least 20% of the total parking capacity.
Additionally, the building premise will have to have an additional power load, equivalent to the power required for all charging points to be operated simultaneously with a safety factor of 1.25 as referred in Annexure-A.
a)
Residential buildings (Plotted House)
| Ownership of Station | Private (Owner) |
|---|---|
| Connection and Metering | Domestic Meter |
| Type of Charger | Slow Chargers as per owner's specific requirements. |
| Modes of Charging | AC (Single charging gun) |
| Norms of Provisions | Minimum one Slow Charger and additional provisions as per owner individual |
b) All other buildings (including Group Housing)
Any public charging stations installed at public/private areas or building premises of any category that caters to commercial mode of charging of EVs shall be deemed as a Public Charging Station and shall have to install the minimum requirement of chargers as specified in the guidelines issued vide No. 12/2/2018-EV dated 14.12.2018 by the Ministry of Power, Government of India, as referred in Annexure-A. However, in order to provide sufficient charging for the EV share in all vehicles, the Charging Infrastructure should be at least 20% of the parking capacity. The ratio of types of chargers shall be as specified in the Table below:
| Building Type | Any building type | |||
| Ownership of Station | Commercial Metering and Payment | |||
| Types of Chargers | as per minimum requirements specified in Ministry of Power guidelines as referred in Annexure-A. | |||
| Additional chargers | PCS service provider shall install additional number of kiosk or chargers beyond the minimum specified requirements to meet the ratio of charging points as prescribed below. (by the type of vehicles) | |||
| Norms of Provisions for charging points | 4-Wheelers (i) 1 Slow Charger (SC) each 3 EVs. (ii) 1 Fast Charger (FC) each 10 EVs | 3-Wheelers (i) 1 Slow Charger (SC) each 2 EVs | 2-Wheelers (i) 1 Slow Charger (SC) each 2 EVs | PV (Buses) (i) 1 Fast Charger (FC) each 10 EVs |
Note:
-
Charging bays shall be planned currently at 20% capacity of all vehicles including 2- wheelers and 4-wheelers.
-
Open metering and on-spot payment options to be available for all users.
-
Provision of Fuel Cooled Battery Charging Station (FCB CS) and Battery Swap (BS) shall not be mandatory and will be at the discretion of the service provider.”