1.1 Electric Vehicle Supply Equipment (EVSE): An EVSE shall be a wall mounted box that supplies electric energy for recharging of electric vehicle batteries and shall have a safety lock-out feature that does not allow current to flow from the device until the plug is physically inserted into the car. EVSEs may be customized with added features as mentioned, namely:
a) Authentication;
b) Integrated payment gateways; and
c) Software for remote monitoring.
1.2 Types of EVSE:
(a) Charging speeds: Charging power, which determines the time required to charge a vehicle, may vary by orders of magnitude across charge points, as shown in Table 91.1. A small household outlet may charge as slowly as 1.2 KW, while the most advanced rapid charging stations can charge up to 350 KW. Charging infrastructure is broadly broken into three categories based on speed: Level 1, Level 2, and direct current (DC) fast-charging (sometimes referred to as Level 3).
(b) Private Charging: Charging batteries of privately owned cars through domestic charging points. Billing shall be part of home or domestic metering.
(c) AC-Slow Charging: The house private chargers are generally used with 230V/15A single phase plug which can deliver a maximum of up to about 2.5 KW of power. The EVSE supplies AC current to the vehicle's onboard charger which in turn shall convert the AC power to DC, allowing the battery to be charged.
(d) Public Charging: For charging outside the house premises, electric power shall be billed and payment shall be collected. The power drawn by these chargers shall be managed from time to time.
(e) DC-Fast Charging: DC current shall be sent to the electric car's battery directly via the charge port. FC chargers (usually 50 KW or more) may supply 100 or more kilometers of range per hour of charging. The fast chargers shall be used as a top-up, rather than fully charging vehicles, for cab companies and corporate users who have a fleet of electric cars.
2. EV share in all vehicles
The charging infrastructure prescriptions in all urban development guidelines shall be at least 20%.
2. Power Load sanction to premises
While adding Charging Infrastructures to the proposed set of building types, enhanced Power Load shall be added for each such building type by the Power Electric Supply Companies ESCOMs, commensurate to the total additional power requirement of simultaneous operation of all the specified charging points in the premise. The load capacity assigned to each premise shall be kept with a safety factor of 1.25 with a long-term vision of thirty years.
| Vehicle type | Slow Charging | Fast Charging | Public CI |
|---|---|---|---|
| 2-Wheelers | Y | N | Yes/Limited |
| 3-Wheelers | Y | N | Yes/Limited |
| PVs (Cars) | Y | Y | Yes |
| PVs (Buses) | N | Y | Yes |
| Vehicle type | Private CI | Public CS | Predominant place of charging |
|---|---|---|---|
| 2-Wheelers | SC/BS | SC | Point of residence / Work |
| 3-Wheelers | SC/BS | SC/BS | Residence / Parking stations |
| PVs (Cars) | SC/BS | FC | Residence / Point of work / other public places |
| PVs (Buses) | SC/BS | FC/BS | Bus Terminals/Depots |
-
The option of Battery Swapping (BS) for privately owned 2-Wheelers and PV(Cars) shall be limited to Private CI.
-
For 3-Wheelers, the BS shall be made available in PCS, for faster recharge experience only.
-
For PV (Buses), Captive Fast charging infrastructure for 100% internal use for fleets may be adopted by privately owned Depots/Garages.
-
The charging infrastructure, installed at every Public Charging Station (PCS), shall follow the guidelines and standards for setting up Charging Infrastructure for Electric
Vehicles, dated 14.12.2018, issued by the Ministry of Power and the connectivity regulations and safety norms shall be defined by respective authorities such as Central Electric Authority or Ministry of Power for grid access to such PCS or any other charging station or infrastructure.
4. Charger Specifications and PCS Infrastructure:
-
Any installed PCS shall have one or more electric kiosk or boards with installation of all charger models as prescribed in the guidelines and standards notified by the Ministry of Power, dated 14 December 2018, for Charging Infrastructure for EVs (at Annexure-B ), with other necessary arrangements as deemed necessary.
-
Public Charging Station service providers shall be free to create charging hubs and to install additional number of kiosk or chargers in addition to the minimum chargers prescribed vide the guidelines and standards notified by Ministry of Power, dated 14 December 2018, including options for installation of additional chargers, if required.
Note:
i. Minimum infrastructure requirements shall not apply to Private Charging Points which are meant for self-use of individual EV owners (non-commercial basis).
ii. Captive charging infrastructure for 100% internal use for a company's own fleet shall not be required to install all type of chargers and to have Network Service Providers (NSPs) tie ups.
5. Location of Public Charging Station (PCS)/ Fluid Cooled Batteries (FCBs) CS in local area/ building precincts.
In accordance with the guidelines and standards notified by the Ministry of Power, dated 14 December 2018, following minimum standards with regard to density of/distance between PCS in local level facilities in building premise/ urban precincts shall be followed, as per provisions in the Model Building Bye-Laws, namely:
(1) At the local levels, within the urban area, at least one Public Charging Station is to be available within a grid of 3Km x 3Km.
(2) At the building premise levels, for various building types:-
(a) Private charging infrastructure (non-commercial use) for individuals.
(b) For all commercial modes of charging EVs, at least one PCS, as per the minimum specifications laid under the guidelines and standards notified by the Ministry of Power, dated 14 December 2018.
(c) Stand-alone Battery Swapping Stations may be added with the PCs.