92. Development Control for Hilly areas:
No construction shall be permitted on land above 600 m from the mean sea level and with an average slope of 30 degrees.
93. Flood risk prone areas:
Prohibit any new construction within the designated buffer zone to minimize human exposure to flood risk and preserve the natural integrity of natural ecosystems.
| Reach | Left Bank Boundary | Right bank boundary |
| Imphal River | Imphal River | Imphal River |
| Koirengei to Lilong | 55 m from the mid-stream or 6 m from the outer toe of the bund whichever is further from the mid-stream | 55 m from the mid-stream or 6 m from the outer toe of the bund whichever is farther from the mid-stream |
| Lilong to Sekmaijin | 60 m from the mid-stream or 6 m from the outer toe of the bund whichever is further from the mid-stream | 60 m from the mid-stream or 6 m from the outer toe of the bund whichever is further from the mid-stream |
| Sekmaijin to Ithai | 62 m from the mid-stream or 6 m from the outer toe of the bund whichever is further from the mid-stream | 62 m from the mid-stream or 6 m from the outer toe of the bund whichever is further from the mid-stream |
| Wangjing River | Wangjing River | Wangjing River |
| Heirok bridge to Kharungpat | 31 m from the mid-stream or 6 m from the outer toe of the bund whichever is further from the mid-stream | 31 m from the mid-stream or 6 m from the outer toe of the bund whichever is further from the mid-stream |
| Nambul River | Nambul River | Nambul River |
| Within Greater Imphal Area | 30 m from the mid-stream or 6 m from the outer toe of the bund whichever is further from the mid-stream | 30 m from the mid-stream or 6 m from the outer toe of the bund whichever is further from the mid-stream |
| Merakhong River | Merakhong River | Merakhong River |
| Yurembam to Tiddim Road crossing | 22.5 m from the mid-stream | 22.5 m from the mid-stream |
| Tiddim Road | 24.2 m from the mid-stream | 24.2 m from the mid-stream |
| crossing to | ||
| Langpok | ||
| Langpok to | 28 m from the midstream | 28 m from the midstream |
| Chingphu | ||
| Iril River | ||
| Sawombung to | 50 m from the mid-stream or 6 m | 50 m from the mid-stream or 6 m |
| Lilong | from the outer toe of the bund whichever is further from the mid-stream | from the outer toe of the bund whichever is further from the mid-stream |
| Thoubal River | ||
| Yairipok to Irong | 48 m from the mid-stream or 6 m | 48 m from the mid-stream or 6 m |
| Ichil | from the outer toe of the bund whichever is further from the mid-stream | from the outer toe of the bund whichever is further from the mid-stream |
| Kongba River | ||
| Chairenthong to | 35 m from the mid-stream | 35 m from the mid-stream |
| Kiyamgei | ||
| Nambol River | ||
| Maklang to | 25 m from midstream | 25 m from midstream |
| Heikrujam | ||
| Heikrujam to | 25 m from midstream | 25 m from midstream |
| Yangoi | ||
| Sekmai River | ||
| Pallel Bridge to | 35 m from the mid-stream or 6 m | 35 m from the mid-stream or 6 m |
| confluence of | from the outer toe of the bund | from the outer toe of the bund |
| Imphal River at | whichever is further from the | whichever is further from the mid- |
| Sekmaijin | mid-stream | stream |
| Arong River | ||
| Charangpat to | 30 m from the mid-stream or 6 m | 30 m from the mid-stream or 6 m |
| Ikop pat | from the outer toe of the bund whichever is further from the mid-stream | from the outer toe of the bund whichever is further from the mid-stream |
No person shall undertake any activity within the prohibited area or restricted area except with the previous permission of the Flood Zoning Authority constituted under the Flood Plain Zoning Act, 1978
94. Construction in High Flood Risk Area
In high Flood Risk Areas identified in the Master Plan of the towns, the plinth level should be above 1m above the highest flood level of the surrounding areas.