While developing Greenfield cities/towns, the layout plans should clearly indicate the telecom as Utility infrastructure lines. Standards followed for Utility planning shall be published and work shall be done by the respective department for bringing in the standardization of the utility coding and sequences. The placement and sequence of above- and below-ground utilities at the appropriate location in the right-of-way to be ensured for unconstrained movement as well as easy access for maintenance. Telecommunication cables should be placed in a duct that can be accessed at frequent service points with sufficient spare capacity to enable scaling and future expansion, and empty pipes (large size hume pipes / HDPE pipes) should be laid before planting trees in order to accommodate additional infrastructure.
Digital Readiness Rating of Buildings / Society in line to the GREEN ratings shall be created where the existing and new buildings shall be rated on standardized parameters such as; but not limited to; Digital Infrastructure access, provisions for Emerging Technologies, Maintenance and Operational ease to TSPs / IPv1, Quality of Wireless Services, Quality / Interchangeability ease of Wireline Services till each Unit Security, redundancy and Expandability of the digital infrastructure etc. A detailed rating parameters and calculation mechanism of Points / Stars shall be devised and benchmarked for all new / retrofitting of buildings/ societies.
Digital Asset repository which will ensure Proper planning and mapping of utilities through GIS is necessary especially when the alignments of telecommunication cables are identified. Design criteria and standards Utilities should meet the following criteria:
Telecommunication cables should ideally be placed below the parking area or service lane, which may be dug up easily without causing major inconvenience. Where this is not possible, the cables may be placed at the outer edge of the right-of-way.
There is a need to reduce conflicts with pedestrian movements is to place telecom boxes in easements just off the right-of-way. Where this is not possible, they should be placed within parking or landscaping areas. If cables have to be located in the pedestrian path, a space of at least 2m should be maintained for the through movement of pedestrians. Telecom boxes should never constrain the width of a cycle track.
• In order to minimize disruptions, cables should be installed with proper maintenance infrastructure.
7. Other procedures for setting up In-Building Solution (IBS)/ Fiber Networks
- There is a need to promote installation of In-Building Solution (IBS) / Smart Connectivity infrastructure, where there is a poor connectivity in terms of weak signal strength inside the office, shopping mall, hospitals, multi-story building, education institutions and the objective has to be to strengthen quality of service of the voice & data of mobile and Fiber broadband network and access to digital services being offered by TSP And IP1’s
A) Procedures of obtaining IBS-NOC during plan approval and completion:
a) While submitting the proposed Building plan seeking approval from the relevant sanctioning Authority, applicant shall also submit
i. A complete Service Plan for IBS-infrastructure along with required specifications (in consultation with, and certified by a credible Telecom Networking hardware-consultant)
ii. An undertaking that such IBS Infrastructure, when constructed shall be available for sharing by various TSPs/IP-Is.
iii. Such Service Plan (IBS) shall be forwarded by the concerned Local Authority to the Telecom Enforcement Resource and Monitoring (TERM) cell of the State (external NOC agency) – for approval NOC.
iv. During the Joint Site Inspection of the completed building structure the TERM cell shall undertake inspection of the constructed/installed IBS infrastructure – for issuance of NOC for OCC.
b) The Local Authority shall liaise with the TERM cell as per its relevant online/offline process of communication to seek the relevant NOCs within the specified time as per the Service Charter/ Service Guarantee Act and rules in place. Separate communication from the applicant shall be needed to secure the IBS NOC.
B) Provision of IBS components in building premises: (as per NBC 2016)
Entrance Facilities (EF) /Lead-in conduits: (clause 3.1.4, of Part 8: Sec 6) min. 1.2m x 1.83m space to be allocated for each TSP adjacent to the EF.
Underground conduits/pipes to MDF room: min 100mm dia encased conduits.
Main Distribution Frame (MDF)/Equipment Room(ER):
(clause 3.1.2, Part 8: Sec 6)
prescribed size with L:W ratio between 1:1 to 2:1
appropriate ventilation of MDF room
proper Lighting for vision of equipments,
located at a level above from the Natural Ground lvl to avoid incidence of flooding Electric distribution panels, isolaters, sockets and earthing as per specific requirements w.r.t the area proposed for coverage (DUs/ service subscribers)
Telecommunications Room (TR) at each building block unless provided with MDF room: (all provisions of space to be as per clause 3.1.3.2, Part 8: Sec 6)
Appropriate nos. of Service/Telecom risers (vertical shafts) for all multi storeyed buildings w.r.t the area proposed for coverage (DUs/ service subscribers):
- of appropriate nos and size (width & depth) to accommodate cable trays
with of access door at each floor.
Telecommunications Enclosures (TE) at each floor of a block or TR (clause 3.1.5, Part 8: Sec 6)
Telecom Media and Connecting Hardware (TE):(clause 3.2, Part 8: Sec6)
Various cabling system and trays:(clause 3.2.4, Part 8: Sec6)
Wireless systems:(clause 3.2.5, Part 8: Sec6)
Backbone Cabling Media Distribution and Bldg. pathways (clause 3.3, Part 8: Sec6)
Horizontal Cabling Media Distribution and Bldg. pathways (clause 3.4, Part 8: Sec6)
IBS installation spaces: area for rooms or systems (e.g. antennas, base stations, remote units, power distribution boxes etc.) to be provided as per requirements w.r.t the area proposed for coverage/ no. of proposed users (as per clause 3.1.3.2, Part 8: Sec6, table stated below)
1 Telecom room space norm for buildings with Built-up area >465 sqmt
| Sl. | Area to be covered by IBS | Size of Telecom Room (all dimension in m) |
|---|---|---|
| 1 | Upto 465 sqmt | 3.0 x 2.4 |
| 2 | 465.0 sqmt to 930.0 sqmt | 3.0 x 3.4 |
| 3 | More than 930.0 sqmt | Additional TR required with same space norms |
Space requirements for smaller buildings with Built-up area <465 sqmt