Charging Infrastructure for Electric Vehicles - Guidelines and Standards (Issued by the Ministry of Power, Government of India vide letter No. 12/2/2018-EV dated 14.12.2018:
Private charging at residences or offices shall be permitted and ESCOMs may facilitate the same.
- Setting up of Public Charging Stations (PCS) shall be a de-licensed activity and any individual or entity is free to set up public charging stations:
Provided that, such stations shall meet the technical as well as performance standards and protocols laid down below, as well as any further norms, standards or specifications laid down by the Ministry of Power and Central Electricity Authority from time to time.
(a) Any person seeking to set up a Public Charging Station may apply for connectivity and he shall be provided connectivity on priority by the Distribution Company licensee to supply power in the area.
(b) Any Charging Station or Chain of Charging Stations may also obtain electricity from any generation company through open access.
- Minimum requirements for Public Charging Infrastructure (PCl): Every Public Charging Station (PCS) shall have the following minimum infrastructure: an exclusive transformer with all related substation equipment including safety appliance;
(i) 33 or 11 KV line or cables with associated equipment including as needed for line termination, metering etc.;
(ii) appropriate civil works;
(iii) adequate space for charging and entry or exit of vehicles;
(iv) current international standards that are prevalent and used by most vehicle manufacturers internationally like CCS and CHadeMO. Hence, Public Charging Stations shall have one or more electric kiosk or boards with installation of all the charger models as follows:
| Charger Type | Charger Connectors* | Rated Voltage (V) | No. of Charging Points/No. of Voltage (V) Connector guns (CG) |
| Fast | CCS (min. 50 kW) | 200-1000 | 1/ 1 CG |
| CHAdeMO (min. 50 kW) | 200-1000 | 1/ 1 CG | |
| Type-2 AC (min. 22 kW) | 380-480 | 1/ 1 CG | |
| Slow/ Moderate | Bharat DC-00 I ( 15 kW) | 72-200 | 1/ 1 CG |
| Bharat AC-001 (JO kW) | 230 | 3/3 CG of 3.3 kW each | |
| *In addition, any other fast/slow/moderate charger as per approved BIS standards whenever notified. | |||
(v) the kiosk or board may have options for installation or additional chargers if required;
(vi) the Public Charging Station Providers shall be free to create Charging Hubs and to install additional number of Kiosk or Chargers in addition to the minimum number of chargers prescribed above; 6
(vii) tie-up with at least one online Network Service Providers (NSPs) to enable advance remote or online booking of charging slots by EV owners. Such online information to EV owners shall include information regarding location, types and numbers of chargers installed or available etc.;
(viii)share charging station data with appropriate ESCOM and to maintain appropriate protocols as prescribed by such ESCOM for this purpose. CEA shall have access to this database;
(ix) appropriate public amenities; and
(x) in addition to the above, fast charging facility are provided at the PCS by the PCI provider, the following additional infrastructure shall be provided, namely:
(a) appropriate Liquid Cooled cables, if High Speed Charging Facility for onboard charging of Fluid Cooled Batteries (FCBs) is provided; and
(b) appropriate Climate Control Equipment for Fast Charging of Batteries to be used for swapping (i.e. not onboard).
Every Public Charging Station (PCS) shall be operational only after inspection and clearance as communicated by a suitable clearance certificate, by the concerned electrical inspector or technical personnel, designated specifically by the respective ESCOM for this purpose. ESCOMs may also empanel one or more third party authorized technical agencies for this purpose.
-
Electric Vehicle Service Equipment (EVSE) shall be type tested by an appropriate reputed authority.
-
The above minimum infrastructure requirements shall not apply to Private Charging Points meant for self-use of individual EV owners (non-commercial basis).
-
Captive charging infrastructure for 100% internal use for a company's own or leased fleet for its own use shall not be required to install all type of chargers and to have NSP tie-ups.
-
Public Charging Station may have the option to add Stand-alone battery swapping facilities in addition to the above mandatory facilities, provided space and other conditions permit.
-
Public charging Infrastructure (PCI) for long distance EVs and/or heavy duty EVs like trucks, buses etc. shall have the following minimum requirements, namely:
i. at least two chargers of minimum 100 kW (with 200-1000 V), each of different specification (CCS & CHAdeMO) and with single connector gun, each in addition to the minimum charging infrastructure requirements as mandated for Public Charging Stations in para 3.
ii. appropriate Liquid Cooled Cables for high-speed charging facility for on board charging of Fluid Cooled Batteries, currently available in some long range EVs.
iii. in addition to above, the Fast-Charging Stations (FCS) for Long Distance EVs and/or Heavy Duty EVs may also have the option of swapping facilities for batteries, for meeting the charging requirements as per para 3. For Fast Charging or Long-Distance use of EVs and/or for Heavy Duty Vehicles like buses/trucks etc. FCBs shall have higher charging rate and longer life. Such Fast-Charging Stations (FCS) which are meant only for 100% in house/captive utilization, for example buses of a company, shall be free to decide the charging specifications as per requirement for its in-house company EVs.
- Location of Public Charging Stations: In case of Public Charging Stations, the following minimum requirements are laid down with regard to density/distance between two charging points, namely
(i) at least one Charging Station shall be available in a grid of 3 km X 3 km. Further, one Charging Station shall be set up at every 25 km on both sides of highways or roads; and 7
(ii) for long range EVs, like long range SUVs and heavy duty EVs like buses, trucks etc., there shall be at least one Fast Charging Station with Charging Infrastructure Specifications at every 100 km, one on each side of the highway or road located preferably within or alongside the stations. Within cities, such charging facilities for heavy duty EVs shall be located within Transport Nagars, bus depots. Swapping facilities shall not be mandatory within cities for Buses, trucks, etc.
-
Additional public charging stations shall be set up in any area only after meeting the above requirements.
-
The above density or distance requirements shall be used by the state Governments or their Agencies for the twin purposes of arrangement of land in any manner for public charging stations, as well as for priority in installation of distribution network including transformers, feeders etc. This shall be done in all cases including where no central or state subsidy is provided.
-
The Central or State Government may also give priority to existing retail outlets (ROs) of Oil Marketing Companies (OMCs) for installation of Public EV Charging Stations, in compliance with safety norms including firewalls, etc., to meet the requirements. Further, within such ROs, Company Owned and Company Operated (COCO) ROs may be given higher preference.
-
Any deviation from above norms shall be admissible only after specific approval of State Nodal Agency, in consultation with the Central Nodal Agency.
-
Database of Public EV Charging Stations: Central Electricity Authority (CEA) shall create and maintain a national online database of all the Public Charging Stations through ESCOMs. Appropriate protocols shall be notified by ESCOMs for this purpose which shall be mandatorily complied by the PCS or BCS. This database shall have restricted access as finalized between CEA and Ministry of Power.
-
Tariff for supply of electricity to EV Public Charging Stations.
(a) The tariff for supply of electricity to EV Public Charging Station shall be determined by the appropriate commission: Provided that, the tariff shall not be more than the average cost of supply plus fifteen percent.
(b) The tariff applicable for domestic consumption shall be applicable for domestic charging.
- Service charges at PCS or BCS. Charging of EVs is a service, as clarified by Ministry of Power, Government of India, vide letter No. 23i08/2018-R&R, dated 13.04.2018. The State Nodal Agency shall fix the ceiling of the Service Charges to be charged by the Public Charging Stations.
17. Priority for rollout of EV Public Charging Infrastructure:
a) Phase-I (1-3 Years): All Mega cities with population of 4 million plus as per census 2011, all existing expressways connected to these Mega cities and important highways connected with each of these Mega Cities shall be taken up for coverage. A list of theses Mega Cities and existing connected expressways is attached at Annexure-1.
b) Phase-II (3-5 Years): Big cities like State Capitals, at headquarters shall be covered for distributed and demonstrative effect. Further, important Highways connected with each of these Mega Cities shall be taken up for coverage.
c) The above priorities for phasing of rollout shall be kept in mind by all concerned including, different agencies of Central/State Governments while framing of further policies/ guidelines for Public Charging Infrastructure if EVs, including for declaring further incentives/subsidies for such infrastructure and for such other purposes.
18. Implementation Mechanism for Rollout. -
a) The Ministry of Power shall designate a Central Nodal Agency for the rollout. All relevant agencies, including Central electricity Authority (CEA) shall provide necessary support to this nodal agency.
b) The State Government shall nominate a Nodal Agency for that State for setting up charging infrastructure. The State DISCOM shall generally be the Nodal Agency for such purposes. However, State Government shall be free to select a Central or State Public Sector Undertaking (PSU), including Urban Local Bodies (ULBs), Urban or Area Development Authorities etc. as its Nodal Agency.
19. Selection of Implementation Agency for Rollout. -
a) The Central Nodal Agency shall finalize the cities and Expressways/Highways to be finally taken up from the above phasing, in consultation with the respective State Government.
b) An Implementation Agency shall be selected by the State Nodal Agency and shall be entrusted with responsibility of installation, operation and maintenance of PCS/FCS/BCS/BSF for designated period, as per parameters specified and as entrusted by the concerned Nodal Agency. The Implementation Agency may be an Aggregator as mutually decided between Central and State Nodal Agencies: Provided that, they
may decide to choose different PCS/FCS providers for bundled packages or for individual locations as mutually decided. Provided further that, whenever bundled packages are carved for bidding, such packages shall necessarily include at least one identified expressway/highway or part thereof to prepare a cohesive regional package. The selected identified cities may be divided into one or more parts as necessary for such purposes.
c) Where Implementing Agency is selected by bidding, all bidding shall be conducted by the State Nodal Agency.
d) There shall be an upper cap on the Service Charges declared by the State Nodal Agency. Subsidy, if admissible from Central or State Government, shall be suitably factored in such calculations of Upper Cap or Bid Variable.”