| Construction Stage | Element | As Per Building Plan | Remark | |
| Yes | No | |||
| Plan check | All, specially structural calculation, fire safety, area of glazing | |||
| Commencement | Assessment of existing lintels, foundations, beams | |||
| Trial Hole | ||||
| Check for encroaching trees, made up of ground, etc | ||||
| Access for fire service | ||||
| Foundation & Excavations | Excavations (Depth/width, distance to tree & drain) | |||
| Movement of Joints, anti-heave protection, clearance to drain | ||||
| Piling | ||||
| Steel Enforcement | ||||
| Ground Preparation for raft | ||||
| Basement/tanking | Tanking for below ground walls & floor | |||
| Retaining wall | ||||
| Over site | Ground Floor preparation (hardcore etc.) | |||
| Suspended timber ground floor preparation | ||||
| Pre cast concrete beams/floor (ventilation & DPC) | ||||
| DPC | ||||
| DBM | ||||
| Gas Protection - landfill, radon etc | ||||
| Floor insulation | ||||
| Site level for disabled access | ||||
| Drainage (before back fill) | Sewer branches to the site | |||
| Drainage laid prior to coverage | ||||
| Ground percolations tests (septic tanks and /or soak-aways) | ||||
| Excavated Soak-away pits | ||||
| Exposure of main sewer | ||||
| Rerouting of main sewer/relocation of main sewer | ||||
| Super Structure | Frame-concrete reinforcement or steel or timber | |||
| Floor joists and beams and connections | ||||
| Construction at first floor level, eg block work and wall ties | ||||
| Construction at 2ndand subsequent floor levels | ||||
| Dormer framework prior to boarding over | ||||
| Roof timbers, restrains straps, bracing | ||||
| Roof breather membrane | ||||
| Staircase installed | ||||
| Vehicle Barriers/bay | ||||
omn²
(1 ≤ α ≤ 0)/(2)
ym
| Super Structure | Fire protection applied to structural members | |||
| Cavity barriers/fire stopping | ||||
| Fire dampers and fire collars | ||||
| Means of escape | ||||
| Space separation & compartmentation | ||||
| Glazing | ||||
| Opening to conservatories etc | ||||
| Area of Glazing | ||||
| Thermal elements (cavity walls etc) | ||||
| Access | ||||
| Pre Plaster | Sound insulation in walls, floors and stairs | |||
| Insulation in walls and roof | ||||
| Bare walls, beams, lintels | ||||
| Fire door | ||||
| First fix electrical (dwellings only) | ||||
| Ventilation system | ||||
| Hygiene (sanitary convenience & washing facilities - pipes etc) | ||||
| Completion | Drainage water tightness test | |||
| Internal lighting, appliance (CO2 emission rate (DER/BER)) | ||||
| Heating system, incl thermostatic control | ||||
| Sound insulation test | ||||
| Gas tightness test to flues | ||||
| Electrical installations (dwellings only) | ||||
| Combustion appliance & fuel system storage | ||||
| Air leakage test | ||||
| Hygiene (sanitary conveniences & washing facilities) | ||||
| Test of emergency lighting and fire alarms |