3.55 Risk based classification of Buildings-
| Criteria | High Risk | Medium Risk | Low Risk |
|---|---|---|---|
| Hazardous Building | Storing explosives and inflammable | Not so | Not so |
| Fly Zone | Above 30 meters in any place and within funnel zone of Airport. | Less than 30 meters and within funnel zone of Airport | Outside funnel zone of Airport |
| Fire | Ground Coverage of more than 500 sqm. on any floor of building and more than 15 meters height | Ground coverage of more than 300 sqm. on any floor of building or more and 11 meters height | None |
| Building Stability (Concrete Building) | More than 60 year of age of building | 50-70 years | Less than 50 years |
| Type of usage | close assembly building | Open assembly building | Non assembly building |
3.56 There are four categories inspections have been mentioned in Byelaws. These four categories inspections have been linked to risk category of building. The following tables have exhibited the relationship between inspection category and risk category of building
| Name of Inspection | Risk Category of Building | ||
| Low | Medium | High | |
| Inspection | Mandatory | Mandatory | Mandatory |
| Third Party inspection cum certification | Optional | Mandate | Mandatory |
| Joint Inspection | Optional | Mandate | Mandatory |
| Surprise Inspection | Optional | Optional | |
Note:- As per above table, inspections is compulsory for all categories of buildings. Joint inspection and third party inspection-cum-certification are mandatory to medium an high risk category of building. Surprise inspection will be based complain received and observation by concern authority.
authentic? else
X


Jharkhand Building Bye-Laws-2016