10. Permission
10.1 No permission or notice shall be required for the works related to the following alterations and the like which do not otherwise violate any provisions regarding general building requirements, structural stability and fire and health safety requirements of the National Building Code-2005:
-
#### ####/
10.2
10.3
10.4
Jharkhand Building Bye-Laws-2016
10.1.1 Opening and closing of a window or door or ventilator;
10.1.2 Providing intercommunicating doors;
10.1.3 Providing or removing partitions;
10.1.4 Providing false ceiling;
10.1.5 Gardening;
10.1.6 White washing;
10.1.7 Painting;
10.1.8 Re-tiling and reproofing;
10.1.9 Plastering and patch work;
10.1.10 Re-flooring; and
10.1.11 Construction of sunshades on one's own land.
Permission shall necessarily be obtained for works to be carried out by Central Government and State Government Departments/Jharkhand State Housing Board. Such permission shall be deemed to be granted / approved after 45 days of submission of such application, provided all mandatory and relevant document submitted by such department, and no objection has been raised by the authority within that period.
0.3 In case of such Government Projects lying in the area outside of any development plan/scheme, the concerned Government Agency shall ensure to obtain NOC required as per provision of these bye laws and relevant Acts and should submit approval drawing in conformity with these Bye-laws.
In all cases completion certificate, signed by the concerned Government Agency, has to be submitted as required in Performa in Annexure-VI after the construction
All clarifications with respect to deficiency in the plan, documents will be sought for from the applicant within 30 days.
10.5 Once the plan has been scrutinized and objections have been pointed out, the applicant shall modify the plan to comply with the objections raised and resubmit it. The Competent Authority shall scrutinize the re-submitted plan and if there will be further objections, the applicant should be given one more chance to comply with the objections raised within a period of 30 days after which if the final revised plan are not resubmitted the plan shall be rejected
10.6 The Competent Authority shall communicate either approval in Form-VIII (A) or refusal in Form-IX within 60 days from date of receipt of application under Bye Law-5 or within 30 days from the compliance of objection raised by the Competent Authority.
X
10.7
10.8
For all buildings, occupancy shall only be accorded, once the builder has developed the onsite and offsite infrastructure like connectivity of sewerage, drainage, water supply, road etc. as per the specification of the local Authority and obtain their NOC.
The basic infrastructure like connectivity of sewerage or septic tank for sewerage treatment, drainage, water supply, road, electrical connection etc. should also be mandatory for all buildings before occupancy certificate is issued, irrespective of height or built up area.
The Authority shall establish a single window clearance system to process such NOCs and clearances related to it.
A residential building may be constructed by the owner of the land without prior approval of the plan by the Authority if the size of the plot is not more than 300 sq. meters and if all the conditions mentioned below are satisfied:
10.8.1 The applicant shall submit an application to the Authority as prescribed in bye law 5(4) along with a certificate from the registered Engineer/Architect that the building plan and the design complies with the Earthquake Safety.
10.8.2 The height is not more than 10 meters,
10.8.3 The number of floors does not exceed ground plus two floors,
10.8.4 No basement is to be constructed,
10.8.5 The road, drainage, sewerage and other infrastructure have been developed as per the approved layout plan or provisions for their development has been made in the building plan,
10.8.6 A notice in Form-X is submitted to the Authority, with a copy of the plan, documents mentioned at above and the record of rights, statement of compliances made to the objection raised by the Authority (if any) 60 days prior to commencement of construction; and
10.8.7 All other conditions of the bye laws are met;
10.8.8 The owner shall have to submit completion certificate to the Authority in proforma of Annexure-VI.
10.8.9 The owner shall remain responsible for any violation of the norms prescribed under the Bye laws. Nothing in this provision will enable the owner to violate any of the provisions of the Bye laws. The registered architects/engineers/town planners and other technical personnel shall
[Signature] [Signature] [Signature] [Signature]
also be responsible for any violation of norms prescribe under the bye-laws.
10.9 A sanctioned letter will be given by the authority stating that submitted plan may be considered as sanctioned for the purpose of Housing Loan.
10.10 In case the permission is refused an appeal shall be filed before the Tribunal.
11. Duration of Permission
11.1 Every permission granted under these bye laws shall remain valid up to three years from the date such permission is granted for buildings more than 10,000 sqm. built up area the validity duration will be of 5 years. The completion certificate shall have to be submitted within this period. However, in case of failure to submit the completion certificate within the prescribed period, the permission shall have to be revalidated before the expiry of the above period on payment of such fee as may be prescribed by the authority and such revalidation shall be valid for another two years.
11.2 If the building/development works is not completed within the above mentioned stipulated period, the applicant shall make a fresh application for approval of building plan.
12.1 Whereas tests of any material are made to ensure conformity of the requirements of these bye laws, records of the tests data shall be kept available for inspection during the construction of building and for such period thereafter as required by the Authority.
12.2 The persons, to whom a permit is issued during construction shall keep pasted in a conspicuous place on the property in respect of which the permit was issued, a copy of approved drawings and specifications;
13. Periodic report of Construction
13.1 In case of high rise buildings the builder/ owner/ applicant shall submit a periodic progress report after plinth level, each roof slab casting in Form-XI to the authority. The process of submission of such reports shall be made easy through an online process. The authority has to make site inspection within 15 days from the date of application and if the construction is found as per bye laws the authority will issue a go ahead certificate to the applicant within 10 days of inspection.