77. Restriction on Compounding.-
77.1 Any deviation pertaining to unauthorized development shall not be compounded;
7.1.1 Where construction has been undertaken on Government land or land belonging to local body or land not owned by the person undertaking such development;
77.1.2 Where development has been undertaken un-authorized within the prohibited limits of any ancient or archaeological monuments.
77.1.3 Where such developments interfere with the natural drainage of the locality;
77.1.4 Where development has been undertaken un-authorized over the area earmarked /approved for parking; and,
77.1.5 Where road or drain whether public or private, whether constructed or natural, has been encroached.
77.1.6 Where number of floors has been increased from permissible limit/sanctioned map.
77.2 Subject to the provisions contained in sub bye law, the Authority shall have the power to determine such other circumstances under which compounding may be prohibited.
77.3 The Authority may, either before or after the institution of the proceedings under the provisions of the Act compound any offence:
77.3.1 Where development has been undertaken without permission, but within the framework of use restrictions and the provisions of these bye laws applicable to the concerned plot;
77.3.2 Where development has been undertaken in deviation of the approved plan, but within the framework of the use restriction and the provisions, norms, and stipulations of these bye laws; and
77.3.3 The Authority may however compound deviations beyond the permissible norms of these bye laws up to 10% in respect of side, front and rear setbacks, 10% in respect to FAR and 10% in respect to height. Any deviation beyond the compoundable limit of 10% or addition of extra floor will not be allowed and will be subject to demolition of the
simms kgow of

offending areas/part of the building. The owner/builder shall carry out the demolition and take all precautions to ensure the structural safety of the remaining part of the building and ensure that no damage is caused to life and property in any way.
78. Compounding Rate
78.1 Compounding Rates for various categories shall be as per Table-25;
| Sl. | Situations | Compounding fees (in Rs.) per sqm. for the violated area | |
| Residential/Institutional | Others | ||
| 1 | Where development has been undertaken without permission, but within the framework of use restrictions and the provisions of the Bye laws applicable to concerned plot | 10000 | 15000 |
| 2 | Constructions beyond permission but within the limit of 10% as mentioned as in section-77.3.3 in bye-laws of the gross areas on all floor thus in violation beyond the permitted setback line or beyond the permissible limit of FAR | 15000 | 25000 |
For Height deviation additional compounding fees shall be levied @ Rs. 2500 per sqm. on the area of the top most floor which height is increased.
Note:-Where development has been undertaken in deviation to the approved plan, but within the framework of use, restriction and the provision of norms and stipulations of these Bye-Laws. Fees as the provision made in sub-section-9.7.3.
79. Compounding amount
79.1 At least 50% of the compounding amount shall be utilized for development of public utility services and protection of heritage sites and structures.
80. System for monitoring
80.1 A system for monitoring shall be put in place by all authorities to ensure that the Bye laws are followed and prompt action shall be taken in case of violation of these bye laws.
81. Telecom Tower Permission
81.1 Telecom Tower Permission with appropriate fees, should be obtained from the authority before erection on prescribed forms with certificate for structural safety from the competent Engineer. An application form for the erection of telecom/phone tower for obtaining N.O.C from Authority on form Annexure-IV. Fee shall be as per Jharkhand Communication Tower and Related Structure Policy, 2015. NOC shall be issued within maximum 60 days from date of application if relevant papers in order. Certificate of permission/NOC and related indemnity bond format shall be as per above mention policy, subject to approval from Airport Authority as and where required.
near -∞.