67.1 For construction of Farm House Building in Agriculture and Forest use Zone
67.2 Minimum size of plot- Minimum size of a plot for farmhouse shall not be less than 1.00 hectare.
67.3 Maximum coverage and FAR shall be as given in the table-22.
| A | Maximum permissible ground coverage for all types of activity | 10% |
|---|---|---|
| B | Maximum permissible FAR | 0.20 |
| C | Residential accommodation of watch and ward/maintenance staff | 40 sqm. |
| D | Maximum height | 7m. |
| E | Setbacks | Front/side abutting road 15.0 m. and all other sides 9.0 |
(1) (1)/(2) × 9
67.4 Other Provisions: Minimum 65% of the total area of the farmhouse shall be under plantation/cultivation. At least 100 trees per hectare shall be planted out of which at least 50 percent shall be evergreen trees.
67.5 Water supply, Sewerage and drainage:
67.5.1 In case of a plot for a farmhouse having dwelling units, the owner thereof shall be responsible to make lawful arrangements for potable water.
67.5.2 The owner shall be responsible to provide drains in the farm house to be used for rain water and in case of dairy farm open or closed sanitary drains to clean sheds, as may be required by the Authority.
67.5.3 The owner shall be responsible to provide septic tank with necessary disposal trenches for disposal of human and animal waste in the farmhouse within his own premises.
67.6 Electrification
The owner of a farmhouse shall obtain electric connection directly from the appropriate authority authorized for distribution on such terms and conditions at his own cost as decided by the appropriate Authority from time to time.

underline of
