9.1.1 Every application for permission for building operation or development shall be accompanied by a building fee as specified in these bye laws.
9.1.2 Fees for retention of structures for temporary period shall be as decided by the Authority from time to time.
9.1.3 Fees for change of occupancy as decided by the Authority from time to time.
9.1.4 Fees for change of land use as decided by the Authority with permission to State Government from time to time.
9.1.5 Any other fee decided by the authority with the approval of the Urban Development and Housing Department or concern Department.
9.1.6 The concern department may change the fees prescribed in these bye laws through a notification from time to time.
9.2 Development permit fee.- The scale of fees for development permit shall be as per Table 2.
Table 2Development permit fees
Sl.
Area of Plot
Nagar Panchayat (Rs)
Municipal Council (Rs)
Municipal Corporation/RRDA/MADA/IADA (Rs)
(i)
(ii)
(iii)
(iv)
(v)
1
upto 1.0 hectare
6000
8000
10000
2
above 1.0 hectare & up to 2.5 hectare
12000
15000
20000
3
above 2.5 hectare & up to 5.0 hectare
16000
20000
30000
9.2.1 For development permit above 5 hectare for every addition of 1 hectare or part there will be an additional fee of Rs.2000 per hectare.
9.2.2 In the case of development permit for non residential use the above fees shall be doubled for different sizes of land
9.3Building permit fee
The scale of fees for residential building permit shall be as per Table 3.1 & Table 3.2 below
SΔ ACD = SΔ COD + SΔ BDO
[Signature]
Table-3.1 Residential buildings up to 500sqm. permit Fees-Rs. Per sqm.
Sl.
Height of Building
Nagar Panchayat
Municipal Council
Municipal Corporation/ Development Authorities/IADA
(i)
(ii)
(iii)
(iv)
(v)
1
upto 10.0 m
10.0
15.0
20.0
2
more than 10 up to 16.4m
20.0
25.0
40.0
3
More than 16.4 m
30.0
35.0
50.0
Table-3.2 Residential buildings more than 500sqm. permit Fees-Rs. Per sqm
Sl.
Height of Building
Nagar Panchayat
Municipal Council
Municipal Corporation/ Development Authorities/IADA
(i)
(ii)
(iii)
(iv)
(v)
1
upto 10.0 m
15.0
20.0
30.0
2
more than 10 up to 16.4m
25.0
35.0
50.0
3
More than 16.4 m
35.0
45.0
60.0
Note.-
(1) Minimum fees for residential building shall be Rs. 2000/-
(2) Fee at the time of submission of the map will be 50% of the total fee calculated at the time of submission. The final fee will be deposited before issuing the sanctioned Plan. The deposited fees will not be refunded under any circumstances.
9.4 Buildings for Charitable Purpose: In case of Institutional buildings built for charitable, religious purpose the fees shall be charged at half of the rates prescribed in Table 3.1 &3.2
9.5 Non Residential Buildings: In case of buildings other than those mentioned in (i) above to be used for non-residential purpose, the fees charged shall be double of the rates prescribed in Table 3.1 & 3.2
9.6 No fees for Central/State Govt. buildings including Government funded buildings, but Semi-Public Sectors/Public Sectors/Any Agency/Limited Company of the Central Govt./State Govt. shall have to deposit building fees as per prescribed fee structure in Table 3.1 & 3.2
9.6.1 The department may alter various aforementioned fees from time to time as per requirement and circumstances.
X
9.6.2 The department may exempt various aforementioned fees as case to case basis as per requirement and circumstances.
9.7Fixation of fees
The fixation of these fees shall be governed by the following. -
9.7.1 For re-erection of existing building, the fees chargeable shall be the same as that for erection of new building.
9.7.2 For additions and alterations in the existing building, the fees shall be chargeable on the added portions only, and on the same scale as for a new building.
9.7.3 For revision and revalidation of a plan of a building, which the Authority has already sanctioned, the fees chargeable shall be 1/4 of the fees chargeable on the original plan subject to the condition that the covered area of the building has not increased than in the original sanctioned plan.
9.7.4 In case of additions and alterations of building, if the use of the building is also changed, then the chargeable fees shall be calculated on the use proposed.
9.7.5 In case of basements, for the purpose of calculating the fees the area covered under the basement shall .be counted towards the covered area.
9.7.6 In the case of buildings with principal and subsidiary occupancies, in which the fees to be levied are different, and then the fees for the total building scheme shall be calculated as per the rates applicable for respective occupancies.
The owner may withdraw his application and plans at any time prior to the sanction and such withdrawal shall terminate all proceedings with respect to such application. The fees paid in such cases shall not be refunded.
9.8Infrastructure Development Fees
The Authority may also impose an infrastructure development fees with the approval of the Department.
10. Permission
10.1 No permission or notice shall be required for the works related to the following alterations and the like which do not otherwise violate any provisions regarding general building requirements, structural stability and fire and health safety requirements of the National Building Code-2005:
#### ####/
10.2
10.3
10.4
Jharkhand Building Bye-Laws-2016
10.1.1 Opening and closing of a window or door or ventilator;
10.1.2 Providing intercommunicating doors;
10.1.3 Providing or removing partitions;
10.1.4 Providing false ceiling;
10.1.5 Gardening;
10.1.6 White washing;
10.1.7 Painting;
10.1.8 Re-tiling and reproofing;
10.1.9 Plastering and patch work;
10.1.10 Re-flooring; and
10.1.11 Construction of sunshades on one's own land.
Permission shall necessarily be obtained for works to be carried out by Central Government and State Government Departments/Jharkhand State Housing Board. Such permission shall be deemed to be granted / approved after 45 days of submission of such application, provided all mandatory and relevant document submitted by such department, and no objection has been raised by the authority within that period.
0.3 In case of such Government Projects lying in the area outside of any development plan/scheme, the concerned Government Agency shall ensure to obtain NOC required as per provision of these bye laws and relevant Acts and should submit approval drawing in conformity with these Bye-laws.
In all cases completion certificate, signed by the concerned Government Agency, has to be submitted as required in Performa in Annexure-VI after the construction
All clarifications with respect to deficiency in the plan, documents will be sought for from the applicant within 30 days.
10.5 Once the plan has been scrutinized and objections have been pointed out, the applicant shall modify the plan to comply with the objections raised and resubmit it. The Competent Authority shall scrutinize the re-submitted plan and if there will be further objections, the applicant should be given one more chance to comply with the objections raised within a period of 30 days after which if the final revised plan are not resubmitted the plan shall be rejected
10.6 The Competent Authority shall communicate either approval in Form-VIII (A) or refusal in Form-IX within 60 days from date of receipt of application under Bye Law-5 or within 30 days from the compliance of objection raised by the Competent Authority.
X
10.7
10.8
For all buildings, occupancy shall only be accorded, once the builder has developed the onsite and offsite infrastructure like connectivity of sewerage, drainage, water supply, road etc. as per the specification of the local Authority and obtain their NOC.
The basic infrastructure like connectivity of sewerage or septic tank for sewerage treatment, drainage, water supply, road, electrical connection etc. should also be mandatory for all buildings before occupancy certificate is issued, irrespective of height or built up area.
The Authority shall establish a single window clearance system to process such NOCs and clearances related to it.
A residential building may be constructed by the owner of the land without prior approval of the plan by the Authority if the size of the plot is not more than 300 sq. meters and if all the conditions mentioned below are satisfied:
10.8.1 The applicant shall submit an application to the Authority as prescribed in bye law 5(4) along with a certificate from the registered Engineer/Architect that the building plan and the design complies with the Earthquake Safety.
10.8.2 The height is not more than 10 meters,
10.8.3 The number of floors does not exceed ground plus two floors,
10.8.4 No basement is to be constructed,
10.8.5 The road, drainage, sewerage and other infrastructure have been developed as per the approved layout plan or provisions for their development has been made in the building plan,
10.8.6 A notice in Form-X is submitted to the Authority, with a copy of the plan, documents mentioned at above and the record of rights, statement of compliances made to the objection raised by the Authority (if any) 60 days prior to commencement of construction; and
10.8.7 All other conditions of the bye laws are met;
10.8.8 The owner shall have to submit completion certificate to the Authority in proforma of Annexure-VI.
10.8.9 The owner shall remain responsible for any violation of the norms prescribed under the Bye laws. Nothing in this provision will enable the owner to violate any of the provisions of the Bye laws. The registered architects/engineers/town planners and other technical personnel shall
[Signature] [Signature] [Signature] [Signature]
also be responsible for any violation of norms prescribe under the bye-laws.
10.9 A sanctioned letter will be given by the authority stating that submitted plan may be considered as sanctioned for the purpose of Housing Loan.
10.10 In case the permission is refused an appeal shall be filed before the Tribunal.
11. Duration of Permission
11.1 Every permission granted under these bye laws shall remain valid up to three years from the date such permission is granted for buildings more than 10,000 sqm. built up area the validity duration will be of 5 years. The completion certificate shall have to be submitted within this period. However, in case of failure to submit the completion certificate within the prescribed period, the permission shall have to be revalidated before the expiry of the above period on payment of such fee as may be prescribed by the authority and such revalidation shall be valid for another two years.
11.2 If the building/development works is not completed within the above mentioned stipulated period, the applicant shall make a fresh application for approval of building plan.
12. Information at the site of construction
12.1 Whereas tests of any material are made to ensure conformity of the requirements of these bye laws, records of the tests data shall be kept available for inspection during the construction of building and for such period thereafter as required by the Authority.
12.2 The persons, to whom a permit is issued during construction shall keep pasted in a conspicuous place on the property in respect of which the permit was issued, a copy of approved drawings and specifications;
13. Periodic report of Construction
13.1 In case of high rise buildings the builder/ owner/ applicant shall submit a periodic progress report after plinth level, each roof slab casting in Form-XI to the authority. The process of submission of such reports shall be made easy through an online process. The authority has to make site inspection within 15 days from the date of application and if the construction is found as per bye laws the authority will issue a go ahead certificate to the applicant within 10 days of inspection.
X
Construction near important buildings
22.1 The Authority shall take rational view in sanctioning plan near important building like Governor's House, High Court, Heritage building etc.
21/00
Lunar my
[Signature]
23. Construction near river front
23.1 No construction or re-construction of any building, within a river boundary, or such other higher distance as may be prescribed from time to time by the State Government, from the outer boundary of the river of Ganges (as prescribed by the Irrigation Department), shall be permitted except for repair and renovation work of heritage buildings.
23.2 In case of rivers other than the Ganges, no construction or reconstruction of any building shall be allowed,' within a strip of land of 10-15 metres (where area is open and not develop 15m. up to), or such distances as prescribed by the State Government, from the outer boundary of the riverfront of any river (as prescribed by the Irrigation Department). The State Government shall notify a list of such rivers.
23.3 No construction shall be allowed within the boundary of the river.
23.4 Notwithstanding the above provision, any Planning Authority or Government Body shall be able to undertake development and beautification work of riverfront, ghats or any other planned development on reclaimed lands with the approval of the Government.
24. Unsafe building
24.1 All unsafe buildings shall be considered to constitute danger to public safety and shall be restored by repairs or demolished or dealt with otherwise as directed by the Authority.
24.2 The Authority shall examine or cause to be examined every building reported to be unsafe or damaged and shall make a written record of such examination.
24.3 Whenever the Authority finds any building or portion thereof to be unsafe, it shall in accordance with established procedure for legal notice, give to the owner or occupier of such building written notices stating the defects thereof this notice shall require the owner or the occupier within a stated time either to complete specified repairs or improvements or to demolish, and remove the building or portion thereof as per provision of Act.
24.4 The Authority may recording the reasons thereof directing in writing that the building which in its opinion is dangerous, or has no provision for exit in the event of fire, shall be vacated immediately or within the period specified for the purpose.
24.5 If any person does not comply with the orders of vacating a building, the Authority may with the help of police remove the person from the building.
24.6 In case the owner or occupier fails, neglects or refuses to comply with the notice to repair or to demolish the said building or portion thereof, the Authority shall cause the danger to be removed either by demolition or repair of the building or portion thereof or otherwise.
24.7 In case of emergency, which, in the opinion of the Authority involves imminent danger to human life or health, the decision of the Authority shall be final. The Authority shall forthwith or with such notice as may be possible promptly cause such building or portion thereof to be rendered safe by retrofitting/strengthening to the degree of safety or removed. For this purpose, the Authority may at once enter such structure or land on which it stands, or abutting land or structure, with such assistance and at such cost as may be deemed necessary. The Authority may also get the adjacent structures vacated and protect the public by appropriate fencing or such other means as may be necessary.
24.8 Costs incurred under sub-bye laws (6) & (7) shall be charged to the owner of the premises involved. Such cost shall be charged on the premises in respect of which or for the benefit of which the same have been incurred and shall be recoverable as provided under law.
25. Demolition of building.-
25.1 Before a building is demolished & the owner shall notify all utilities having service connections within the building, such as water, electricity, gas, sewer and other connections. A permit to demolish a building shall not be issued until a release is obtained from the utilities departments stating that their respective service connections and appurtenant equipment, such as meters and regulators have been removed or sealed and plugged in a safe manner.
25.2 The owner shall take all precautionary measures to avoid noise and dust pollution and shall not create any inconvenience to the neighboring plot owners.
Inspection procedure
14.1 As a matter of course all construction or work for which a permit is required shall be subject to inspection by the Authority at all reasonable hours with prior intimation.
14.2 Inspection, where required, shall be made within 15 days following the receipt of periodic report of construction in Form-XI. At the first inspection, the Authority shall determine that the building construction has been taken up in accordance with approved plans. A copy of the inspection report shall also be made available to the builder/developer. Inspection report shall be submitted.
14.3 Joint inspection will be done by concerned ULB's Authority, Fire Service Department, Airport Authority and Environment authority as and when required. Applicant applies individual NOC to respective department for availing NOC through carry out joint inspection at least time. The relevant authorities will intimate the date and time to inspect and inform the same to applicant to present at site on specified date and time. A team of authorities shall jointly come and inspect and issue NOC certificates to applicant after inspection
14.4 Surprise inspection on the basic of complaint or otherwise only be done by the prior permission of EO/Special Officer/MC/MD/VC of ULBs/Authorities.
14.5 JE/Inspector site inspection report will be submitted/uploaded within in 48 hours after inspection.
14.6 Such establishment or proposal comes under high risk building classification as per bye-laws specified inspection mentioned in section-3.55 is mandatory and will be conducted by concern authority.
14.7 Such establishment or proposal comes under moderate risk building classification as per Bye-laws, specified inspection mentioned in section 3.55 is not mandatory and will be conducted by concern authority based on their observation.
14.8 Such establishment or proposal comes under low risk building classification as per Bye-laws, specified inspection mentioned in section 3.55 is not applicable for this category.
15. Third Party certification
15.1 Accredited architects/engineers may be authorized to do inspection as third party inspection of any building under construction or completed, by the head of the authority.
15.2 Such accredited architects/engineers shall not be anyway associated to the project concerned.
15.3 They shall issue certificate regarding construction quality/structural safety norms as well as construction is going on or completed as per sanctioned drawing. Structural safety checklist shall be provided in Annexure-IX and construction quality checklist/testing shall be provided in Annexure-X
16. Accreditation and gradation of Architects/Engineers
15.1 The accreditation of architects/engineers shall be done by the authority on the basis of their professional experience. The person concerned should have minimum experience of 5 years as registered architect/engineers/technical person in any ULBs/Authorities.
16.2 The concerned person shall produce certificate of the required experience.
16.3 The authority shall publish grading of professionals as on basis of their experience as follows:-
16.3.1 Architect:-
Grade
Minimum Experience
Work Assigned
A
10 Yrs and above
Any work
B
More than 8 Yrs
Up to 16.4 meter height
C
Minimum 3Yrs
Up to 10 meter height
16.3.2 Engineer:-
Grade
Minimum Experience
Work Assigned
A
10 Yrs with PG and above
Any work
B
More than 8 Yrs
Up to 16.4 meter height
C
Minimum 3Yrs
Up to 10 meter height
16.4 They should not be blacklisted on any authority, they should have minimum qualification in as per Annexure-I.
16.5 The authority shall issue the details procedure of accreditation of registered architect/engineers and technical personnel complying with rules and regulation.
17. Cancellation
17.1 If any time after permission to proceed with any building or development work has been given, the Authority is satisfied that such permission was granted in consequence of any material misrepresentation or fraudulent statement contained in the application given or information furnished, the Authority may cancel such
[Signature]
permission and any work done thereafter shall be deemed to have been done without permission.
18. Completion of Construction
18.1 The applicant/builder/owner/registered architect/registered engineer shall certify the completion of all building designed by Architect/Engineer. The responsibility of compliance with respect to provisions of these Bye-laws shall rest entirely on applicant/builder/owner
18.2 For all buildings including mentioned in 18.1 above, the applicant will submit the notice of completion in Annexure-VI to the Authority that the building has been completed in all respects as per the approved plan and provision of the Bye-laws.
The said notice shall be accompanied by the following documents:
18.2.1 Three copies of as built building plans.
18.2.2 A fee of Rs. 1000/-.
18.2.3 Copy of approved plan and approval letter as or case may be approval letter.
18.2.4 Certificate of installation of fire safety appliances by the nominated authority/agency wherever applicable.
18.2.5 Evidence to the effect of all public utility services, and in particular, sewerage, drainage, water supply, and electricity have been linked to the main public utility system.
18.2.6 A certificate obtained from concern structural Engineer certifying the structural safety and stability of the building.
18.2.7 A certificate from concern architect that the building has been constructed as per the provision of these bye-laws.
18.3 The deviations, if any, shall also be brought to the notice of the Authority (with relevant documents)
18.4 The team of officials shall visit the site within 15 days after receiving of Completion Certificate in proper manner and occupancy certificate shall be given. The team will verify the following facts
18.4.1 Number of floors
18.4.2 Building height
18.4.3 External Setbacks
18.4.4 Building Line, if any
18.4.5 Parking space provision
18.4.6 Abutting road width
Laser A.
18.4.7 FAR
18.4.8 Coverage percentage
18.4.9 Tree Cover
18.4.10 Water harvesting structures
18.4.11 Land if required to be surrendered.
18.4.12 Lifts, water pumps and storage tanks,
18.4.13 Internal roads/paving
18.4.14 Parking areas and external lighting
18.4.15 Lightening arrestors
18.4.16 Fire Fighting installations
19. Certificate for occupancy
19.1 The Authority shall issue a certificate for occupancy for all category of buildings, or for part of a building during its construction, or whole of the building after construction in Performa as Annexed as Annexure - VII or refuse occupancy, as the case may be, within 30 days from the date of application.
19.2 If the Occupancy Certificate is not issued within time limit mentioned above, the applicant shall submit an application with an affidavit that the construction is strictly as per the approved plans and no dues in development charges or any other form of payment to be made to the Authority are pending and all the conditions for issuing of occupancy permission are complied with.
[Signature]
19.3
19.4
19.7
19.8
19.9
In case of non-disposal of such application within 15 days, it will be deemed to have been granted. In case of any false statement the applicant shall be liable for punishment under the provisions of these Bye Laws and other suitable legal action.
Temporary occupancy-upon the request of the applicant the Authority may issue a temporary occupancy certificate of occupancy for a building or a part thereof before .the entire work covered by the building permit has been completed, provided such portion or portions may be occupied safely prior to full completion of building without endangering life or public welfare.
The refusal for granting occupancy certificate shall be a speaking order clearly mentioning the reason for refusal.
9.5 Before issuing occupancy certificate, the competent authority shall verify that the building complies with the provisions of life safety as mentioned in National Building Code 2005(Group-1 Part-IV Fire and Life Safety-4) and barrier free accessibility wherever applicable.
19.6 The department/line agencies dealing with electric power, water supply, drainage and sewerage shall not give connections to building unless such occupancy certificate is produced. Any violation by the department/ Authority/Agencies in this regard shall be treated as an offence under the Jharkhand Municipal Act, 2011 and all relevant Acts. However a temporary connection of water supply and electricity for the purposes of construction can be given after the approval of the Building Plan.
The occupancy/certificate shall also state the use/type of occupancy of the building. However, the applicant may apply for change of use/occupancy permitted within the purview of the Development Plan/Zonal Plan/ Zoning Regulations, where so required.
In case of multi storied building and other special building like educational, assembly, institutional, industrial, storage and hazardous and mixed occupancies periodic inspection shall be made by the authority, along with technically competent authorized personnel once in five years or less to ensure the fire safety provisions of the building are in proper order and the building complies with the provision of fire and life safety requirements ('Fire and Life Safety', Part-4 of NBC). In case the building fails to comply with requirement of fire safety and barrier free accessibility, the building shall be declared unsafe.
20. Construction not according to plan
20.1 If the Authority finds at any stage that the construction is not being carried out according to the sanctioned plan or is in violation of any of the provisions of these bye laws, it shall notify the owner giving details of deviation and no further construction shall be allowed until necessary corrections in the plan are made and the corrected plan is approved. In case the deviation is within condonable limits, the construction shall not be stopped.
20.2 If the owner fails to comply with the requirements at any stage of construction, the Authority may cancel the building permission issued and shall cause notice of such cancellation to be pasted upon the said construction. If the owner is not traceable at the address given in the notice, pasting of such notice on the premises shall be considered as sufficient notification of cancellation to the owner thereof no further work shall be undertaken or permitted upon such construction until a valid building permission is issued thereafter.
20.3 The notification under sub-bye law (20.2) shall also be published in as public notice and also on the Website.
20.4 The above-mentioned procedure shall also be followed in case of deviation of the layout.
20.5 An appeal against an order under sub-bye law (20.2) above shall lie with the tribunal established under Municipal Act or any other tribunal as notified by the department.
21mm
underline
XM
21. Single Window Clearance
21.1 The Planning Authority/Authority shall set up a Single Window Clearance system to process all the NOCs and grant permissions. There shall be a Website through which all the applications/documents /forms shall be filed online. The stages of approval/refusal shall also be communicated through the website.
21.2 Every applicant seeking NOC and permission unless exempted under these Bye Laws shall apply in the Combined Application form through website.
21.3 The Combined Application form duly filled in together with fees to be paid under these Bye Laws shall be submitted in required number of copies along with relevant enclosures, certificates, fees receipts and attachments in the Single Window Cell in the office of the Authority.
21.4 All applicants shall furnish the form of self certification and also a certificate by Competent Technical Person along with the application at the time of submission of application forms;
21.5 There shall be a check list appended to the combined application forms which shall be completed and signed by the applicant and scrutinized and accepted by the authorized representative of Single Window Cell in the office of the Competent Authority before issuing the acknowledgment;
21.6 Before issuing the acknowledgement, the authorized representative of the Single Window Cell in the office of the Authority, shall satisfy that the application is complete in all respect;
21.7 The relevant parts of the common application form shall be served on the respective authorities within three working days from the date of issuing the acknowledgment;
21.8 The respective authority shall process the application and communicate the decision to the Nodal Authority within further 10 working days;
21.9 In case of rejections of clearances or approvals with modification by the respective authority, the Nodal Authority shall examine the issues involved, may ask the applicant for such modifications as required by the respective authority for further consideration;
18.4.17 Lifts
18.4.18 Water pump
18.4.19 Drainage and arrangement for waste water and sewerage disposal
18.4.20 Copy of agreement with the apartment Owner's Association/Society if any.
18.4.21 The team shall record and report to the Authority the deviations made from the approved plan.
18.5 Implementation of Life Safety provisions as mentioned in National Building Code 2005 (Group-1 Part-W Fire and Life Safety-4) shall be complied and NOC from Fire Service Department obtained where ever applicable.
18.6 Quality checklist for building works shall be provided as per Annexure-X.
All occupied buildings and buildings covered under sub-bye law (4) above shall also be subject to periodic joint physical inspection by a team of multi disciplinary professionals of the Authority. This work
nimo
4500×3/1
may be out sourced by the Authority as may be deemed necessary. The team shall report compliance of bye-laws, natural lighting, and ventilation, lift besides structural and electrical safety. If any short comings/ deficiencies or violations are noticed during inspection, the occupants shall ensure the compliance of the same within a specified time frame of six months. If not complied with, the building shall be declared unsafe. The period of inspection shall be once in five years.
19.10 An appeal against the decision of the Authority shall lie with the respective Tribunal under the relevant Act.
19.11 Grade A Accredited architect may also issue occupancy certificate after being fully satisfied regarding compliance of all provisions of Building Bye-law and others related. Acts
19.12 In case of all the deviations which are within the condonable limits, a temporary conditional certificate of occupancy may be granted by the Authority.