Building permit. —No person shall erect any building without obtaining prior building permission in writing from the Competent Authority duly notified by the Government for this purpose.
-
Application for building permit.— (1) Every person who intends to erect building within the jurisdiction of the Authority shall apply in writing to the Planning Authority in Form -1(A).
(2) Such application shall be accompanied by documents in quadruplicate as mentioned in checklist annexed to Form -I(A).
(3) Such application shall not be considered until the applicant has paid the fees mentioned in Annexure-V.
(4) In case of objections, the fees so paid shall not be refunded to the applicant but the applicant shall be allowed to resubmit the plan without any additional fees after complying with all the objections within a period of one year from the date of receipt of communication of such objections from the Authorities.
(5) No application for building permit shall be necessary for the following additions / alterations provided they do not violate any of the provisions regarding general building requirements, structure stability and fire safety requirements specified in National Building Code -
(a) Whitewashing and painting;
(b) Plastering and patch work;
(c) Renewal of roof at the same height;
(d) Reconstruction of portions of building damaged by any natural calamity to the same extent as previously approved;
(e) Internal additions/alterations within the building envelop certified and supervised by a Licensed Technical Person registered;
(f) Digging or filling of earth;
(6) Intimation to this effect shall be submitted to the Authority in writing before commencement of construction.
(7) Regarding submission of plans by the Government Departments, the procedure shall be as given below:
(i) The operational construction/installation of the Government, whether temporary or permanent, which is essential for the operation, maintenance, development or execution of any of the following services may be exempted from the point of view of the bye-laws, namely:- Railways, National Highways, National Waterways, Major Ports, Airways and Aerodromes, Posts and Telegraphs, Telephones, Wireless, Broadcasting and other like forms of Communication, Regional Grid for Electricity, Defence and any other service which the Central Government/Government of Puducherry may, if it is of opinion that the operation, maintenance, development or execution of such service is essential to the life of the community, by notification, declare to be a service for the purpose of this clause.
In case of construction/installation where no approvals are required, the concerned agencies which are exempted from seeking approval shall submit the drawings/plans/details for information and record of the Authority before construction/installation.
(ii) The following constructions of the Government Departments do not come under the purview of operational construction for the purpose of exemption under sub-clause (i), namely:-
PART-I]
211
(a) new residential building (other than gate lodges, quarters for limited essential operational staff and the like), roads and drains in Railway colonies, hospitals, institutes and schools, in the case of Railways; and
(b) a new building, new construction or new installation or any extension thereof in the case of any other services.
- Information accompanying application for lay-out plan or building permit
5.1 The following information shall be accompanied with the application for lay-out and building plan
(A) Lay-outs regarding sub-division of land
(1) The site plan shall show—
(i) the boundaries of the plot and the name and number of the properties and road abutting to the plot;
(ii) plot number of the property on which the building is intended to be erected;
(iii) all existing buildings and physical features standing on, over or under the site;
(iv) building envelop at each floor level in relation to the site;
(v) the total plot area and the break-up of area under different uses, roads and open space with their percentages in terms of the total area of the plot;
(vi) total floor area ratio, ground coverage and height of the building on each category proposed;
(vii) setbacks of total plot as well as individual proposed plots;
(viii) details of setback, floor area ratio, ground coverage, on each irregular shaped plots in the proposed lay out on at least 1 :500 scale;
(ix) sewerage and drainage lines up to discharge point and water supply lines;
(x) details of boundary wall, plinth, culvert and ramp, trees;
(xi) scale used and the direction of north point relating to plan of proposed building;
(xii) parking plans indicating the parking spaces for all the buildings; landscape plan;
(xiii) location and size of temporary structures like stores, labour hutments, site office and the like; and
(xiv) electrical load requirement.
(2) Building plan: For any proposed structure requirement of building plan shall be as per clause 5.1 (B), 5.1 (C) and 5.1 (D) as the case may be.
(3) Service plans: Details of private water supply and sewage disposal system independent of the Municipal Services, if any and rain water harvesting system and solar passive architecture as per the existing Government orders.
(4) Specification: General specification of materials to be used in different parts of the building as given in Appendix-I, enclosed with the Form- I (B).
(5) Documents as per Checklist- 1C annexed to Appendix -1.
(B) Residential buildings on plots other than group housing (flatted):
(1) The plan shall show—
(i) Key plan.- A key plan drawn to a scale of not less than 1:10,000 shall be submitted along with the application for a development/building permit showing the boundary locations of the site with respect to neighbourhood landmarks;
(ii) the boundaries of the plot and the name/number of the properties and road abutting the plot;
[ PART-I
(iii) plot number of the property on which the building is intended to be erected;
(iv) all existing building and physical features standing on, over or under the site;
(v) building envelope at each floor level in relation to the site:
(vi) the total plot area and the break-up of covered areas on each floor with their percentages in terms of the total area of the plot;
(vii) total height of the building;
(viii) setbacks;
(ix), details of projections and structures in setbacks;
(x) sewerage and drainage lines up to discharge point, rain water harvesting and water supply lines:
(xi) details of boundary wall and its plinth, culvert and ramp, trees, concealing of water tank on roof with jaali;
'(xii) car parking, if applicable;
(xiii) scale used and the direction of north point relating to plan of proposed building;
(2) Document as per Checklist I-B enclosed with Appendix -1.
(3) Specification: General specification of material to be used in different parts of the building as given in Appendix-I, enclosed with the Form-1(A).