20.1 Minimum Distance from Water Body
-
Minimum clearance of 30mts shall be provided between the boundary of the bank of a river where there is no embankment and any development work or part thereof.
-
Minimum clearances of 15.00 m to be provided between the embankment of a river and any building or part thereof or any other clearance as may be prescribed under any other general or specific orders of Government and appropriate Authority whichever is more.
-
Minimum clearances of 9.00 m shall be provided between the boundary of any other water body such as lake (talav), canal or nala and any building or part thereof.
-
Where a water course passes through a low lying land without any well defined bank, the applicant may be permitted by the Competent Authority to restrict or re‐direct the water course to an alignment and cross‐section determined by the Competent Authority.
20.2 Rain Water Management
20.2.1 Rain Water Disposal
-
The roof (terrace) of a building and the remaining area of the building‐unit shall be provided with an effective rain water drainage system so as to ensure that the rain water is not discharged into adjacent building units and no dampness is caused in any walls or foundation of adjacent buildings.
-
Rain water pipes shall be affixed to the outside of the walls of the building or in recesses or formed in such walls or in such other manner as may be approved by the Competent Authority.
-
No roof or terrace abutting on a public street shall be constructed without providing sufficient number of down take pipes and such pipes shall be so fixed as to discharge the rain water at a level not higher than 0.60 m above the street level.
-
The manner of channelling rain water discharge from a building‐unit to a public storm water drain, if available, shall be determined by the Competent Authority.
20.2.2 Rain Water Harvesting
Rain water harvesting is mandatory for all buildings with ground coverage 80 sq.m. and above. The system of storm water drainage and storage in reservoirs and recharge should conform to one of the following specifications:
(a) For Buildings with ground coverage above 80 sq.m. and below 500sq.m.
Percolation Pit or Bore Recharge shall be provided in the marginal space around the building. Such pits shall be filled with small pebbles, brick jelly or river sand and covered with perforated concrete slabs.
(b) For Buildings with building‐unit area above 500sq.m. and up to 1500 sq.m. Percolating Well with Rain Water Harvesting System shall be provided (up to ground first river).
(c) For Buildings with building‐unit area above 1500 sq.m. and up to 4000 sq.m.
Percolating Well with Rain Water Harvesting System shall be provided for every 4000sq.m. (up to ground second river).
(d) For Buildings with building‐unit area above 4000 sq.m.
One Percolating Well shall be provided as per Regulation 20.2.2(c) for every 4000sq.m. land area. As an alternative to providing multiple percolating wells, a Water Retention Pond with minimum capacity of 300,000 litres with a percolating well for every five percolating wells or part thereof shall be permitted as an alternative.
20.2.3 Rain Water Storage
For all building‐units with area more than 1000 sq.m., Rain water storage tank shall be mandatory with adequate storage capacity.
20.3 Solid Waste Management
All buildings shall provide facilities for solid waste management. Standards and specifications of facilities shall conform to the following requirements:
20.3.1 Solid Waste BIN for Residential Use
-
Community bin shall be provided in the road‐side marginal open space.
-
The size of the bin container shall be calculated at the rate of 10 litres capacity per dwelling unit with a maximum size of bin of 80 litres. The numbers of bins shall be calculated on the basis of total no. of dwelling units/tenements.
20.3.2 Solid Waste BIN for Non‐residential Use
-
Community bin shall be provided in the road‐side marginal open space.
-
The size of the bin container shall be calculated at the rate of 20 litres capacity per 100 sq.m. of floor area with a maximum size of bin of 80 litres.
-
The bin shall be provided with an air‐tight lid.
-
For Hospitals, Hotels and Restaurants‐ disposal of solid waste shall be carried out as per the norms decided by the Competent Authority from time to time.
-
For Clubs, Community Halls and Party Plots‐ garbage container shall be provided with a minimum capacity of 4 tonnes. Such a container shall be placed along a paved area abutting the road of minimum dimensions of 6.00 m x 7.50 m. For such a place, used according to provision of this regulation, Competent Authority can collect security deposit from the plot owner as may be decided time to time.
20.4 Grey‐water Recycling
20.4.1 Applicability
Any owner applying for approval for construction of a new set of buildings of category and total built‐up area mentioned below shall make provision for reuse of recycled water:
| Sr. No. | BUILDING USE | BUILT-UP AREA (sq.m.) |
| 1 | Hospitals and Nursing Homes | More than 5,000 |
| 2 | Hospitality: Hotels, Lodges, Guest houses | |
| 3 | Hostels for Schools, Colleges, Training Centres | More than 10,000 |
| 4 | Community Centre, Banquet Halls, and similar uses | |
| 5 | Commercial | |
| 6 | All hazardous, water-polluting, chemical industries |
20.4.2 Provisions of Recycling System
The applicant shall along with his application submit the designs, plans, calculations and the references used for the calculations etc to provide the system to recycle the grey water. Such system shall include the provisions to facilitate the following:
-
Treated grey water is pumped to a separate tank on the roof from where grey water will be supplied to water closets, garden taps, car washing taps etc.
-
Only water from water closets should be let in to sewerage system.
-
Wherever arrangements from reuse of recycled water is provided additional arrangements for carrying the excess grey water to the sewerage system may also be provided.
-
In a nature or manner or in a way that shall not constitute a nuisance of foul gases or cause a public hazard or otherwise in compliance of these regulations.
-
The recycled water shall be used for non potable, no contact purposes within premises and shall not be connected to sewage/waste water system of local authority. However the waste generated by the recycle plant can be connected to local authority sewer network if it is of the accepted quality as mentioned in Regulation 20.4.3
6. Separation of grey water:
(a) The wastes from toilets in the premises will be separated from grey water that is of bath room and kitchen wastes by means of separate down take discharge system.
(b) The grey water shall be recycled by providing recycling plant and shall be reused for non potable purposes after storing the same in distinctly separate tank by means of purple colored down take pipes.
20.5 Tree Plantation
-
All buildings shall provide tree plantations conforming to the following:
-
Building unit having area of more than 100 sq.m. shall be provided with minimum three trees for every 200 sq.m. area or part thereof.
-
The requirement of trees shall be reduced on the basis of the number of grown existing trees that are conserved and not affected by the proposed development.
-
Trees shall be planted on site and guarded by the tree guards and shall be maintained properly.
-
Trees shall be planted without causing obstruction to the easy movement of fire fighting vehicles in case of fire emergency.
-
A person applying for permission to carry out any development shall have to pay tree plantation deposit along with his application to the Competent Authority at the rates decided by the Competent Authority time to time. This deposit shall be refundable after the period of five years with the condition that trees planted on the site shall be grown‐up and maintained properly, otherwise the deposit shall be forfeited and shall be utilised only for tree plantation and maintenance by the Competent Authority.
-
Competent Authority may consult Forest and Environment Department for tree typology, plantation and maintenance, etc. if required.
20.6 Solar Water Heating System
All buildings in the following categories of buildings shall provide solar‐assisted water heating system:
| Sr. No. | BUILDING USE | BUILT-UP AREA |
| 1 | Bedded Hospitals and Nursing Homes | |
| 2 | Hospitality: Hotels, Lodges, Guest houses | More than 2,000 sq.m. |
| 3 | Hostels for Schools, Colleges, Training Centres | |
| 4 | Community Centre, Banquet Halls, and similar uses | |
| 5 | Residential - detached and semi-detached dwelling units | |
| 6 | All hazardous, water-polluting, chemical industries | More than 200 sq.m. of individual dwelling unit area |
20.7 Environment Impact Assessment
- No development permission shall be given to the Building and Construction projects, Townships and Area Development project having built up area mention in the table below, until getting Environment Clearance from SEIAA (State Level Environment Impact Assessment Authority) as required under the Environmental Impact Assessment notification‐2006.
| Sr. No. | PROJECT OR ACTIVITY | AREA | REMARK |
|---|---|---|---|
| 1 | Building and Construction projects | Having Built-up area 20,000 sq.m. or more and less than 1,50,000 sq.m. | Built-up area is for covered construction; in the case of facilities provided open-tosky, then activity area shall be considered |
| 2 | Townships and Area Development projects | Having area of building-unit 50 ha or more OR Having built up area 1,50,000 sq.m. OR more |
- Any Building and Construction projects, Townships and Area Development project falling under the category as mention in the table in 2. above and if the developer split the project in two phases, developer has to produce Environment Clearance from SEIAA, as required under the Environmental Impact Assessment notification‐2006, prior to the approval of first phase of the project.