Responsibilities of Persons on Record shall be as follows:
4.5.1 Architect on Record (abbreviated AS AOR)
The Architect on Record shall:
-
Be the Person on Record responsible for ensuring compliance with all procedural requirements specified in Section B – Procedure Regulations, of these Regulations.
-
Scrutinize and verify the architectural design and specifications of the proposed building.
-
Certify that the architectural design and specification of the proposed building comply with these Regulations using the format prescribed in Form No. 2.
-
Immediately inform the Competent Authority in writing, if in his/her opinion, the construction of the building is not being undertaken in accordance with the sanctioned design requirement in a format as per Form No. 3.
-
Inform the Competent Authority in writing, within 7 working days, if for any reason he/she is relieved of his/her responsibilities or he/she relieves himself of responsibility as the Architect on Record for the building using the format prescribed in Form No. 4. In case of termination of services as Architect on Record, inform the Competent Authorities about the stage of work at which services are terminated. The registered architect appointed as of the preceding architect shall inform within 7 days about his/her appointment on the job, and inform the Competent Authority of any deviation that might have occurred on the site with reference to the approved drawings and the stage at which he/she is taking over the charge. After Competent Authority has inspected the site for his/her report, the newly appointed architect shall allow the work to proceed under his/her direction.
-
n behalf of the owner, submit the progress certificates, completion certificates and obtain the Building Use Permission as required under the regulations.
-
Inform the Competent Authority immediately on termination of the services of the SEOR or COWOR and shall not allow the work to continue till the vacancy is filled by appointment of another person and the certificate of appointment of such person is submitted in the Competent Authority within 7 days of his appointment.
-
Instruct the relevant agency that adequate provisions are made for ensuring the safety of workers and others during excavation, construction and erection.
-
Instruct the relevant agency that adequate provisions are made for providing safe and adequate temporary structures required for construction and development.
4.5.2 Nengineer on Record (abbreviated AS EOR)
The Engineer on Record shall:
-
Be the Person on Record responsible for ensuring compliance with all procedural requirements specified in Section B – Procedure Regulations, of these Regulations.
-
Scrutinize and verify the structural design and specifications of the proposed building.
-
Certify that the structural design and specification of the proposed building comply with these Regulations using the format prescribed in Form No. 2A.
-
Immediately inform the Competent Authority in writing, if in his/her opinion, the construction of the building is not being undertaken in accordance with the sanctioned design requirements, in the format stipulated in Form No.3.
-
Inform the Competent Authority in writing, within 7 working days, if for any reason he/she is relieved of his/her responsibilities or he/she relieves himself/herself of responsibility as the Engineer on Record for the building using the format prescribed in Form No. 4. In case of termination of services as Engineer on Record, inform the Competent Authorities about the stage of work at which services are terminated. The registered Engineer appointed as replacement of the preceding Engineer shall inform within 7 days about his/her appointment on the job, and inform the Competent Authority of any deviation that might have occurred on the site with reference to the approved drawings and the stage at which he/she is taking over the charge. After Competent Authority has inspected the site for his/her report, the newly appointed Engineer shall allow the work to proceed under his/her direction.
-
On behalf of the owner, submit the progress certificates, completion certificates and obtain the Building Use Permission as required under the regulations.
-
Inform the Competent Authority immediately on termination of the services of the Structural Engineer on Record or Clerk of Works on Record and shall not allow the work to continue till the vacancy is filled by appointment of another person and the certificate of appointment of such person is submitted in the Competent Authority within 7 days of his appointment.
-
Instruct the relevant agency that adequate provisions are made for ensuring the safety of workers and others during excavation, construction and erection.
-
Instruct the relevant agency that adequate provisions are made for providing safe and adequate temporary structures required for construction and development.
4.5.3 STRUCTURAL ENGINEER ON RECORD (ABBREVIATED AS SEOR) The Structural Engineer on Record shall:
-
Scrutinize and verify the structural design and specifications of the proposed building.
-
Prepare a report of the structural design.
-
Supply two copies of structural drawings to the COWOR.
-
Advise the Owner/Architect/Clerk of Works for arranging for tests and their reports for soil, building material, etc. for his evaluation and design consideration.
-
Submit the certificate of structural safety and over all structural soundness of the proposed building and its compliance to the Regulations to Competent Authority using the format prescribed in Form No. 2B.
-
To prepare detailed structural design and to prescribe the method and technique of its execution strictly on the basis of the National Building Code or relevant Indian Standard specifications.
-
Detailed structural drawings and specifications for execution indicating thereon, design live loads, safe soil bearing capacity, specifications of material, assumptions made in design, special precautions to be taken by contractor to suit the design assumptions etc. whatever applicable.
-
Immediately inform the Competent Authority in writing, if in his opinion, construction of the building is not being undertaken in accordance with the structural design and specifications stipulated by him, in the format stipulated in Form No.3.
-
In case of serious default, be black listed (de‐registered) by the Competent Authority.
-
Inform the Competent Authority in writing, within 7 working days, if for any reason he is relieved of his responsibilities as the Structural Engineer on Record for the building, using the format prescribed in Form No. 4.
4.5.4 Clerk of Works on Record (abbreviated AS Cowor)
The Clerk of Works on Record shall:
-
Undertake all necessary measures, including but not limited to, adequate inspection during construction to ensure that the construction of the building is undertaken as per detailed design and specifications stipulated by the AOR and by the SEOR.
-
Immediately inform the Competent Authority in writing, if in his opinion, the construction of the building is not being undertaken in accordance with the sanctioned design and specifications, in the format stipulated in Form No. 3.
-
Bring to the notice of the SEOR and AOR/EOR any situation or circumstances which in his opinion are liable to endanger the safety of structure.
-
Inform the Competent Authority in writing, within 7 working days, if for any reason he is relieved of his responsibilities or he relieves himself of responsibility as the supervisor of Works for the building using the format prescribed in Form No. 4. In case of termination of services as supervisor of Works, inform the Competent Authorities about the stage of work at which services are terminated.
The registered supervisor of Works appointed as replacement of the preceding supervisor of Works shall inform within 7 days about his appointment on the job, and inform the Competent Authority of any deviation that might have occurred on the site with reference to the approved drawings and the stage at which he is taking over the charge. After Competent Authority has inspected the site for his report, the newly appointed architect shall allow the work to proceed under his direction.
-
Instruct the relevant agency that adequate provisions are made for ensuring the safety of workers and others during excavation, construction and erection.
-
Instruct the relevant agency that adequate provisions are made for providing safe and adequate temporary structures required for construction and development.
-
Take adequate measures to ensure that no damage is caused to the work under construction and the adjoining properties.
-
Ensure that no undue inconvenience is caused in the course of his work to the people in neighbourhood.
-
Ensure that no nuisance is caused to traffic & neighbouring people by way of noise, dust, smell, vibration etc. in the course of the work.
-
Not be permitted to supervise more than two independent Building‐units at a given time as provided in Development Regulations within 500.00 m peripheral area of each site.
-
Be considered as a supervisor until the issue of Building Use Permission.
4.5.5 Fire Protection Consultant on Record (abbreviated AS Fpcor)
The Fire Protection Consultant on Record shall be required for all buildings listed in Schedule 16 and shall:
-
Undertake all necessary measures, including but not limited to, adequate inspection during construction to ensure that the construction of the building is undertaken as per detailed design and specifications stipulated by the AOR and by the SEOR.
-
Certify that the design and specification of the proposed building comply with Fire Safety Regulations using the format prescribed in Form No. 2E.
-
Immediately inform the Competent Authority in writing, if in his opinion, the construction of the building is not being undertaken in accordance with the sanctioned design and specifications stipulated by the AOR or EOR and the SEOR, using the format prescribed in Form No. 3.
-
Bring to the notice of the SEOR and AOR or EOR any situation or circumstances which in his opinion are liable to endanger the fire protection and safety of structure.
-
Inform the Competent Authority in writing, within 7 working days, if for any reason he is relieved of his responsibilities or he relieves himself of responsibility as the FPCOR for the building using the format prescribed in Form No. 4. In case of termination of services as Fire Protection Consultant, inform the Competent Authorities about the stage of work at which services are terminated. The registered FPCOR appointed as replacement of the preceding FPCOR shall inform within 7 days about his appointment on the job, and inform the Competent Authority of any deviation that might have occurred on the site with reference to the approved drawings and the stage at which he is taking over the charge. After Competent Authority has inspected the site for his report, the newly appointed architect shall allow the work to proceed under his direction.
-
Instruct the relevant agency that adequate provisions are made for fire prevention and safety during construction and development.