13.0 General
Special provisions shall be made in respect of certain buildings as given below. However, this provision shall stand superseded if new directions are issued by the Government.
13.1 Provisions for Barrier Free Access
Provisions for barrier free access in buildings for differently abled persons shall be as given below.
13.1.1 Definitions
i) Non-ambulatory Disabilities:- Impairments that, regardless of cause or manifestation, for all practical purposes, confine individuals to wheelchairs.
ii) Semi-ambulatory Disabilities:- Impairments that cause individuals to walk with difficulty or insecurity, individuals using braces or crutches, amputees, arthritics, spastics, and those with pulmonary and cardiac ills may be semi-ambulatory.
iii) Hearing Disabilities:- Deafness or hearing handicaps that might make an individual insecure in public areas because he is unable to communicate or hear warning signals.
iv) Sight Disabilities:- Total blindness or impairments, which affect sight to the extent that the individual, functioning in public areas, is insecure or exposed to danger.
v) Wheel Chair:- Chair used by disabled people for mobility. The standard size of wheel chair shall be taken as 1050 mm. x 750 mm.
13.1.2 Scope
These regulations are applicable to all buildings and facilities used by the public such as educational, institutional, assembly, commercial, business, mercantile buildings constructed on plot having an area of more than 2000 Sq.m. It does not apply to private and public residences
13.1.3 Site development
Level of the roads, access paths and parking areas shall be described in the plan along with specification of the materials.
-
Access Path / Walk Way:- Access path from plot entry and surface parking to building entrance shall be minimum of 1800 mm. wide having even surface without any steps. Slope, if any, shall not have gradient greater than 5%. Selection of floor material shall be made suitably to attract or to guide visually impaired persons (limited to coloured floor material whose colour and brightness is conspicuously different from that of the surrounding floor material or the material that emits different sound to guide visually impaired persons; hereinafter referred to as ―guiding floor material‖. Finishes shall have a non-slip surface with a texture traversable by a wheel chair. Curbs wherever provided should blend to a common level.
-
Parking:- For parking of vehicles of handicapped people, the following provisions shall be made :-
a) Surface parking for two car spaces shall be provided near entrance for the physically handicapped persons with maximum travel distance of 30 m. from building entrance.
b) The width of parking bay shall be minimum 3.6 meter.
c) The information stating that the space is reserved for wheel chair users shall be conspicuously displayed.
d) Guiding floor materials shall be provided or a device, which guides visually impaired persons with audible signals, or other devices, which serves the same purpose, shall be provided.
13.1.4 Building Requirements
The specified facilities for the buildings for differently abled persons shall be as follows:-
i) Approach to plinth level
ii) Corridor connecting the entrance / exit for the differently abled.
iii) Stair-ways
iv) Lift
v) Toilet
vi) Drinking Water.
i) Approach to plinth level :-Every building should have at least one entrance accessible to the differently abled and shall be indicated by proper signage. This entrance shall be approached through a ramp together with the stepped entry.
ii) Ramped Approach :- Ramp shall be finished with non-slip material to enter the building. Minimum width of ramp shall be 1800mm. with maximum gradient 1:12. Length of ramp shall not exceed 9 m. having 800mm. high hand rail on both sides extending 300mm. beyond top and bottom of the ramp. Minimum gap from the adjacent wall to the hand rail shall be 50mm.
iii) Stepped Approach:-For stepped approach size of tread shall not be less than 300mm. and maximum riser shall be 150mm. Provision of 800mm. high hand rail on both sides of the stepped approach similar to the ramped approach.
iv) Exit/Entrance Door:- Minimum & clear opening of the entrance door shall be 900mm. and it shall not be provided with a step that obstructs the passage of a wheel chair user. Threshold shall not be raised more than 12mm.
Entrance Landing:-Entrance landing shall be provided adjacent to ramp with the minimum dimension 1800mm. x 2000mm. The entrance landing that adjoins the top end of a slope shall be provided with floor materials to attract the attention of visually impaired persons (limited to coloured floor material whose colour and brightness is conspicuously different from that of the surrounding floor material or the material that emits different sound to guide visually impaired persons hereinafter referred to as ―guiding floor material‖). Finishes shall have a non-slip surface with a texture traversable by a wheel chair. Curbs, wherever provided, should blend to a common level.
vi) Corridor connecting the entrance / exit for the differently abled:- The corridor connecting the entrance / exit for differently abled, leading directly outdoors to a place where information concerning the overall use of the specified building can be provided to visually impaired persons either by a person or by signs, shall be provided as follows:-
a) Guiding floor materials or device that emits sound to guide visually impaired persons shall be provided.
b) The minimum width shall be 1500mm.
c) In case there is a difference of level, slope ways shall be provided with a slope of 1:12.
d) Hand rails shall be provided for ramps/slope ways.
vii) Stair-ways - One of the stair-ways - near the entrance / exit for the differently abled shall have the following provisions:-
a) The minimum width shall be 1350 mm.
b) Height of the riser shall not be more than 150 mm. and width of the tread 300mm. The steps shall not have abrupt (square) nosing.
13.2 Installation of Solar Assisted Water Heating (SWH) System/ Roof Top Photovoltaic (rtpv) System
SWH or RTPV systems shall be mandatory in all types of buildings to be constructed on plot area of more than 4000sq.m.
In order to facilitate the installation of SWH/RTPV System, the new buildings shall have the following provisions:-
i) All such buildings where SWH/RTPV are to be installed will have open sunny roof area available for the installation of SWH/RTPV.
ii) The roof loading adopted in the design of such building should be at least 50 kg. Per Sq.m. for the installation of SWH / RTPV.
iii) At least 25% of the roof area shall be utilized for installation of the SWH/RTPV system.
iv) Precaution should be taken that architectural elevation treatment should not cast shadow on terrace space. As far as possible, parapet of south, east and west sides of the terrace shall be of railing type (above 1 feet) such that it will not cast shadow on the solar collectors and maximum terrace space can be utilized.
v) All such new buildings installed with SWH shall have an installed hot water line from the rooftop and insulated distribution pipelines to each of the points where hot water is required in the building.
13.3 Rain Water Harvesting
The provision for Rain Water Harvesting shall be made as under:-
a) All the layout open spaces/amenity spaces of housing societies and new constructions/ reconstruction/ additions on plots having area not less than 500 Sq.m. shall have one or more Rain Water Harvesting structures having a minimum total capacity as detailed in Schedule.
Provided that the Authority may approve the Rain Water Harvesting structures of specifications different from those in Schedule, subject to the minimum capacity of Rain Water Harvesting being ensured in each case.
b) The owner/society of every building mentioned in the (a) above shall ensure that the Rain Water Harvesting System is maintained in good condition for storage of water for non-potable purposes or recharge of groundwater at all times.
c) The Authority may impose a levy of not exceeding Rs.1000/- per annum for every 100sq.m. of built-up area for the failure of the owner of any building mentioned in the (a) above to provide or to maintain Rain Water Harvesting structures as required under these regulations. Failure to provide Rain Water Harvesting System shall deemed to be breach of the conditions on which the development permission has been granted.